UNIVERSITY "A"

Operated by M & M PRODUCTION LTD. (P-5 518573) in the MCFARLAND (QUEEN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 37549District 08Field 59419664Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$1.6 M
Aug 2005 – Jul 2025
Value, last 12 filed months
$11 k
at the published price for each month
Months reported
240
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 36 leases and 620 wells, and the rule below applies to all of them.

Discovered
1955-05-08
as the register files it
Field class
Oil
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition22,230 bbl$1,592,829
Casinghead gasProduction64 Mcf$425
Total$1,593,254

Wells on this lease (4)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.3967, -102.4684. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.6 miles.

32.39693, -102.46887 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
4 of 4 wells
With a plug date
100.0%
4 of 4 wells
Median depth
4,912 ft
4 wells filed one
Completion to plug
35.7 years
median over 3 wells

What the state filed about each well

On the RRC proration schedule
4100.0%
A plug date is filed
4100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
4100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 4,855 and 4,995 ft, median 4,912 ft, over the 4 wells that filed a depth.

Completions filed
Aug 1988 – Aug 2005
3 of 4 wells; 1 filed none
Plug dates filed
Mar 2025
4 of 4 wells

Last completion to plug: a median of 35.7 years across the 3 wells that filed both dates, with the middle half between 27.7 years and 36.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

4 wells

42-0038365514,855 ftMar 2025Yes
42-0030711824,880 ftAug 2005Mar 2025Yes
42-0033640534,995 ftJul 1989Mar 2025Yes
42-0033618444,943 ftAug 1988Mar 2025Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (240)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

240 months

Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 2025145074.324.28$10,776
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 2024160079.932.15$12,789
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 2024172084.451.66$14,525
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 2023165071.262.61$11,758
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 2023158089.042.74$14,068
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 2023153068.962.26$10,551
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 2023152072.852.39$11,073
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 2022163076.415.73$12,455
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 2022160084.888.16$13,581
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 20221650115.097.98$18,990
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 20221680108.885.08$18,292
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 2021167071.323.90$11,910
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 2021169069.865.35$11,806
Aug 20210066.024.22$0
Jul 2021151070.783.98$10,688
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 2021162060.362.76$9,778
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 2021171050.412.81$8,620
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 2020148014.751.80$2,183
Mar 20200030.341.86$0
Feb 202093049.881.98$4,639
Jan 20200057.252.09$0
Dec 201968059.012.30$4,013
Nov 20190055.302.75$0
Oct 201972053.472.42$3,850
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 201971056.272.46$3,995
Jun 201970052.782.49$3,695
May 201968058.482.74$3,977
Apr 201968062.632.75$4,259
Mar 201964056.803.06$3,635
Feb 201968050.852.79$3,458
Jan 20190046.033.23$0
Dec 201865046.594.19$3,028
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 201875059.543.11$4,466
Aug 20180059.403.07$0
Jul 201870065.142.93$4,560
Jun 201873060.183.08$4,393
May 201873065.382.90$4,773
Apr 201867063.842.90$4,277
Mar 20180061.222.79$0
Feb 201869061.782.77$4,263
Jan 201874062.874.01$4,652
Dec 201774057.272.92$4,238
Nov 201768055.423.12$3,769
Oct 201768049.292.98$3,352
Sep 201772047.523.09$3,421
Aug 201767045.373.00$3,040
Jul 201772043.873.09$3,159
Jun 201774042.493.09$3,144
May 201771045.373.26$3,221
Apr 201767047.933.21$3,211
Mar 2017134046.772.98$6,267
Feb 201769050.452.95$3,481
Jan 201768049.413.42$3,360
Dec 201669048.763.72$3,364
Nov 201667042.492.64$2,847
Oct 201668046.193.09$3,141
Sep 201669041.553.10$2,867
Aug 201668041.442.92$2,818
Jul 2016103041.622.92$4,287
Jun 201667045.352.69$3,038
May 201668042.521.99$2,891
Apr 2016138036.561.99$5,045
Mar 201669033.011.79$2,278
Feb 201668026.472.06$1,800
Jan 201670027.352.36$1,915
Dec 201568032.362.00$2,200
Nov 201568038.792.17$2,638
Oct 201568043.552.43$2,961
Sep 2015133042.992.76$5,718
Aug 201567040.162.87$2,691
Jul 201568048.152.95$3,274
Jun 2015135056.152.88$7,580
May 20150055.212.96$0
Apr 2015134049.822.71$6,676
Mar 201570042.892.93$3,002
Feb 201571044.662.98$3,171
Jan 2015137043.433.10$5,950
Dec 20140054.693.59$0
Nov 201470070.464.25$4,932
Oct 2014136078.303.90$10,649
Sep 201471086.164.05$6,117
Aug 2014138089.394.04$12,336
Jul 201469096.564.18$6,663
Jun 201476098.164.74$7,460
May 201473094.734.73$6,915
Apr 201468095.944.81$6,524
Mar 201469095.895.06$6,616
Feb 2014135097.406.19$13,149
Jan 201470090.404.86$6,328
Dec 201370091.824.35$6,427
Nov 2013140088.853.74$12,439
Oct 201368097.423.78$6,625
Sep 2013650104.113.72$6,767
Aug 20132700104.253.52$28,148
Jul 201300102.523.72$0
Jun 201368094.403.93$6,419
May 20130094.834.15$0
Apr 2013280093.964.28$26,309
Mar 20130093.623.91$0
Feb 201370091.233.42$6,386
Jan 20130091.603.42$0
Dec 201269086.773.42$5,987
Nov 201270086.953.62$6,087
Oct 20120089.383.40$0
Sep 201268094.672.92$6,438
Aug 2012138092.662.91$12,787
Jul 201268085.133.02$5,789
Jun 2012136079.822.52$10,856
May 201269091.612.49$6,321
Apr 20121380101.652.00$14,028
Mar 2012700105.052.22$7,354
Feb 20121330101.102.57$13,446
Jan 2012136098.092.73$13,340
Dec 201168096.873.24$6,587
Nov 2011133095.723.31$12,731
Oct 2011138084.983.65$11,727
Sep 201170083.623.99$5,853
Aug 2011138083.404.15$11,509
Jul 2011138094.144.52$12,991
Jun 201169092.904.64$6,410
May 2011140098.134.40$13,738
Apr 2011700105.964.33$7,417
Mar 2011138096.364.06$13,298
Feb 201170085.644.18$5,995
Jan 201168086.504.59$5,882
Dec 201072185.734.35$6,177
Nov 2010134080.843.80$10,833
Oct 2010130178.103.51$10,157
Sep 2010130172.633.98$9,446
Aug 2010210173.684.42$15,477
Jul 201068172.554.74$4,938
Jun 2010137170.364.91$9,644
May 201070171.124.24$4,983
Apr 2010138181.694.12$11,277
Mar 2010142178.394.39$11,136
Feb 2010206173.585.44$15,163
Jan 2010138174.365.96$10,268
Dec 200968171.445.48$4,863
Nov 2009138174.593.75$10,297
Oct 2009138172.544.11$10,015
Sep 2009142165.543.06$9,310
Aug 2009209167.423.22$14,094
Jul 200965161.133.46$3,977
Jun 2009212166.163.90$14,030
May 2009145154.743.93$7,941
Apr 2009216146.773.59$10,106
Mar 2009208142.144.06$8,769
Feb 2009141132.814.63$4,631
Jan 2009209135.865.37$7,500
Dec 2008208137.105.98$7,723
Nov 2008138155.496.86$7,664
Oct 2008217175.246.92$16,334
Sep 20081391101.767.88$14,153
Aug 20082101114.228.48$23,995
Jul 20082171131.0811.39$28,456
Jun 20082190131.3313.03$28,761
May 20081441123.1711.57$17,748
Apr 20082261110.3110.45$24,941
Mar 20082170101.909.66$22,112
Feb 2008220192.538.77$20,365
Jan 2008150190.388.21$13,565
Dec 2007218188.337.30$19,263
Nov 2007143191.677.29$13,116
Oct 2007149482.856.92$12,372
Sep 2007155175.846.24$11,761
Aug 2007216169.066.39$14,923
Jul 2007138170.906.39$9,791
Jun 2007215162.007.55$13,338
May 2007210158.747.85$12,343
Apr 2007141159.617.81$8,413
Mar 2007145156.927.30$8,261
Feb 2007212155.108.22$11,689
Jan 2007141150.306.73$7,099
Dec 200671156.656.92$4,029
Nov 2006215154.207.62$11,661
Oct 2006152154.906.01$8,351
Sep 2006228160.085.04$13,703
Aug 2006160168.717.34$11,001
Jul 2006151169.376.34$10,481
Jun 2006148166.286.38$9,816
May 2006151166.016.42$9,974
Apr 2006258164.397.36$16,620
Mar 200687156.707.08$4,940
Feb 2006195157.597.75$11,238
Jan 2006199160.598.93$12,066
Dec 2005197154.9413.42$10,837
Nov 2005196154.6910.59$10,730
Oct 2005196158.3413.80$11,448
Sep 2005647161.4512.08$39,770
Aug 20050061.519.80$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2025 — as filed, then multipliedworked
Oil                  145 bbl  × $ 74.32 =    $10,776
Casinghead gas         0 Mcf  × $  4.28 =         $0

────────────────────────────────────────────────────
Month total                                  $10,776

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/37549 is the state's own key, not one this site invented.