MATTHEWS PVOG

Operated by MADISON AND WRIGHT LLC (P-5 521182) in the MATTHEWS (CANYON CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 38484District 08Field 58327200OilCasinghead gasSaveExport
Value, all time
$1.2 M
Oct 2007 – Jun 2022
Value, last 12 filed months
$0
at the published price for each month
Months reported
177
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 38 leases and 66 wells, and the rule below applies to all of them.

Discovered
2007-09-11
as the register files it
Field class
Oil
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2007-09-11.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition12,619 bbl$1,048,962
Casinghead gasProduction32,778 Mcf$157,655
Total$1,206,617

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.8535, -103.9216. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.85351, -103.92165 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,240 ft
1 wells filed one
Completion to plug
17.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,240 ft.

Completions filed
Aug 2003
1 of 1 wells
Plug dates filed
Aug 2020
1 of 1 wells

Last completion to plug: a median of 17.0 years across the 1 well that filed both dates, with the middle half between 17.0 years and 17.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3893226226,240 ftAug 2003Aug 2020Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (177)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

177 months

Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 2019184055.052.66$10,129
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 2016190046.193.09$8,776
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 2015014042.892.93$411
Feb 2015013044.662.98$387
Jan 201519620043.433.10$9,132
Dec 2014031054.693.59$1,113
Nov 2014031570.464.25$1,339
Oct 2014033078.303.90$1,287
Sep 2014030086.164.05$1,214
Aug 201419930089.394.04$18,999
Jul 2014031096.564.18$1,296
Jun 2014029098.164.74$1,374
May 2014032594.734.73$1,536
Apr 20141902095.944.81$18,325
Mar 2014023595.895.06$1,188
Feb 201419823697.406.19$20,747
Jan 2014028490.404.86$1,380
Dec 2013021491.824.35$932
Nov 2013025088.853.74$935
Oct 201316935097.423.78$17,787
Sep 20130222104.113.72$825
Aug 2013199274104.253.52$21,711
Jul 20130218102.523.72$810
Jun 2013027094.403.93$1,062
May 2013027694.834.15$1,145
Apr 2013020293.964.28$865
Mar 20130093.623.91$0
Feb 201319412091.233.42$18,109
Jan 201317552791.603.42$17,832
Dec 2012051486.773.42$1,758
Nov 201218757286.953.62$18,333
Oct 201219351189.383.40$18,988
Sep 201216218394.672.92$15,871
Aug 2012037692.662.91$1,093
Jul 201219548285.133.02$18,056
Jun 201239332879.822.52$32,196
May 201219829291.612.49$18,865
Apr 20120420101.652.00$839
Mar 2012170442105.052.22$18,841
Feb 2012169471101.102.57$18,296
Jan 201234380898.092.73$35,854
Dec 201119173196.873.24$20,870
Nov 201117299995.723.31$19,772
Oct 201116957984.983.65$16,474
Sep 201132957783.623.99$29,811
Aug 201137854283.404.15$33,774
Jul 2011064994.144.52$2,932
Jun 201134059892.904.64$34,361
May 201116943798.134.40$18,509
Apr 2011164263105.964.33$18,517
Mar 201133652596.364.06$34,507
Feb 2011036385.644.18$1,517
Jan 2011032286.504.59$1,478
Dec 201034838385.734.35$31,499
Nov 201016636580.843.80$14,805
Oct 201017026278.103.51$14,196
Sep 201017023072.633.98$13,262
Aug 201016238173.684.42$13,620
Jul 201033542472.554.74$26,313
Jun 201032837170.364.91$24,900
May 201016236971.124.24$13,084
Apr 201016543481.694.12$15,268
Mar 201033442678.394.39$28,052
Feb 201016738273.585.44$14,367
Jan 201033555474.365.96$28,215
Dec 200916059171.445.48$14,671
Nov 200917446474.593.75$14,719
Oct 200916669472.544.11$14,894
Sep 200916924165.543.06$11,815
Aug 200917118467.423.22$12,121
Jul 200917126561.133.46$11,371
Jun 200916325666.163.90$11,781
May 2009021254.743.93$832
Apr 200916425746.773.59$8,592
Mar 200916328142.144.06$8,009
Feb 2009025232.814.63$1,168
Jan 200916820935.865.37$7,147
Dec 2008025437.105.98$1,518
Nov 200816624355.496.86$10,878
Oct 200816535375.246.92$14,858
Sep 20080306101.767.88$2,410
Aug 2008164236114.228.48$20,734
Jul 2008163310131.0811.39$24,897
Jun 2008159725131.3313.03$30,330
May 20080698123.1711.57$8,079
Apr 2008164322110.3110.45$21,457
Mar 2008155292101.909.66$18,616
Feb 2008027292.538.77$2,386
Jan 200816120290.388.21$16,209
Dec 200716756788.337.30$18,891
Nov 200716844191.677.29$18,616
Oct 200732443882.856.92$29,875

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2019 — as filed, then multipliedworked
Oil                  184 bbl  × $ 55.05 =    $10,129
Casinghead gas         0 Mcf  × $  2.66 =         $0

────────────────────────────────────────────────────
Month total                                  $10,129

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/38484 is the state's own key, not one this site invented.