HIRT 27

Operated by ATROPOS EXPLORATION COMPANY (P-5 36618) in the ST. LAWRENCE (WICHITA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 38724District 08Field 79689850OilCasinghead gasSaveExport
Value, all time
$1.0 M
Mar 2008 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
219
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 9 leases and 10 wells, and the rule below applies to all of them.

Discovered
1985-03-29
as the register files it
Field class
Oil
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition9,871 bbl$922,782
Casinghead gasProduction10,301 Mcf$78,376
Total$1,001,157

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.7917, -101.6049. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.79171, -101.60493 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,185 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,185 ft.

Completions filed
Apr 2008
1 of 1 wells

1 well

42-17333370110,185 ftApr 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (219)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

219 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 202487075.632.06$6,580
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 202382072.852.39$5,974
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 2022860115.097.98$9,898
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 202185070.783.98$6,016
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 202185061.302.72$5,211
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 202088014.751.80$1,298
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190255.302.75$6
Oct 20190053.472.42$0
Sep 201989055.052.66$4,899
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 2019101056.803.06$5,737
Feb 20190050.852.79$0
Jan 20190246.033.23$6
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180160.183.08$3
May 20180465.382.90$12
Apr 20180863.842.90$23
Mar 20180861.222.79$22
Feb 20180261.782.77$6
Jan 20180462.874.01$16
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 201763043.873.09$2,764
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 2016155046.193.09$7,159
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 2015172540.162.87$6,922
Jul 201502748.152.95$80
Jun 201503056.152.88$86
May 201501855.212.96$53
Apr 201502549.822.71$68
Mar 20150842.892.93$23
Feb 201502144.662.98$63
Jan 20151301543.433.10$5,692
Dec 201401654.693.59$57
Nov 20140170.464.25$4
Oct 20140678.303.90$23
Sep 20140686.164.05$24
Aug 201401789.394.04$69
Jul 201402396.564.18$96
Jun 201404298.164.74$199
May 201403294.734.73$151
Apr 201404395.944.81$207
Mar 20141783295.895.06$17,230
Feb 201404597.406.19$279
Jan 201404790.404.86$228
Dec 201301691.824.35$70
Nov 201304588.853.74$168
Oct 201305797.423.78$215
Sep 201305104.113.72$19
Aug 201317113104.253.52$17,873
Jul 2013038102.523.72$141
Jun 201304994.403.93$193
May 201304194.834.15$170
Apr 201304193.964.28$176
Mar 201301093.623.91$39
Feb 201302291.233.42$75
Jan 201303991.603.42$133
Dec 201201886.773.42$62
Nov 20121792986.953.62$15,669
Oct 201203389.383.40$112
Sep 201205294.672.92$152
Aug 201205392.662.91$154
Jul 201206085.133.02$181
Jun 20121816379.822.52$14,606
May 201207291.612.49$179
Apr 2012069101.652.00$138
Mar 2012022105.052.22$49
Feb 2012025101.102.57$64
Jan 201203798.092.73$101
Dec 201107996.873.24$256
Nov 20111739195.723.31$16,861
Oct 201107684.983.65$277
Sep 201106783.623.99$267
Aug 201109083.404.15$373
Jul 2011014194.144.52$637
Jun 201115514192.904.64$15,054
May 201118019898.134.40$18,536
Apr 20110170105.964.33$737
Mar 2011021196.364.06$856
Feb 2011016585.644.18$690
Jan 2011155086.504.59$13,408
Dec 201001385.734.35$57
Nov 201018620480.843.80$15,810
Oct 201018314678.103.51$14,805
Sep 201035952272.633.98$28,151
Aug 201085244273.684.42$64,729
Jul 201001472.554.74$66
Jun 201001870.364.91$88
May 201002071.124.24$85
Apr 201001781.694.12$70
Mar 20101811878.394.39$14,268
Feb 201001773.585.44$93
Jan 201002074.365.96$119
Dec 200902071.445.48$110
Nov 20091813374.593.75$13,625
Oct 200904872.544.11$197
Sep 200904565.543.06$138
Aug 200906067.423.22$193
Jul 20091746761.133.46$10,869
Jun 200906966.163.90$269
May 200909154.743.93$357
Apr 200904546.773.59$161
Mar 20091747842.144.06$7,649
Feb 200909032.814.63$417
Jan 200918815335.865.37$7,563
Dec 200808237.105.98$490
Nov 200806855.496.86$467
Oct 20081778275.246.92$13,885
Sep 200817548101.767.88$18,186
Aug 2008369275114.228.48$44,480
Jul 20080246131.0811.39$2,802
Jun 2008544830131.3313.03$82,261
May 20081,7682,526123.1711.57$247,001
Apr 20081,7651,041110.3110.45$205,581
Mar 2008025101.909.66$242

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2024 — as filed, then multipliedworked
Oil                   87 bbl  × $ 75.63 =     $6,580
Casinghead gas         0 Mcf  × $  2.06 =         $0

────────────────────────────────────────────────────
Month total                                   $6,580

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/38724 is the state's own key, not one this site invented.