SUSIE B. SNYDER

Operated by NEW HEIGHT ENERGY, LLC (P-5 100152) in the IATAN, EAST HOWARD field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 39192District 08Field 44148500Hydrogen sulphide fieldOilSaveExport
Value, all time
$1.5 M
Jul 2008 – May 2026
Value, last 12 filed months
$56 k
at the published price for each month
Months reported
215
no gaps in the span
Streams
1
oil

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 154 leases and 2,716 wells, and the rule below applies to all of them.

Discovered
1926-12-31
as the register files it
Field class
Oil
the register's own label
Between wells
400 ft
minimum
From a lease line
200 ft
minimum

A drilling unit in this field needs at least 5 acres. The field rule took effect on 2008-07-29.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: DKT 08-0257306 APPROVED 07/29/2008 - UPDATE SPACING TO 200/400FT

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition20,502 bbl$1,484,122
Total$1,484,122

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2405, -101.2432. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.24050, -101.24321 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
3,460 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,460 ft.

Completions filed
Jul 2008
1 of 1 wells

1 well

42-22736134203,460 ftJul 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (215)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

215 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 20268489.753.15$7,539
Feb 202611863.503.75$7,493
Jan 20263459.138.00$2,010
Dec 20256556.664.41$3,683
Nov 202510258.593.93$5,976
Oct 20256859.383.30$4,038
Sep 20256662.743.08$4,141
Aug 202516263.933.01$10,357
Jul 202513166.743.32$8,743
Jun 20253566.483.13$2,327
May 202510560.553.23$6,358
Apr 202511262.363.54$6,984
Mar 202510167.704.27$6,838
Feb 20256970.884.34$4,891
Jan 20257274.324.28$5,351
Dec 202410068.993.12$6,899
Nov 20249869.052.20$6,767
Oct 20246671.372.28$4,710
Sep 20246469.612.36$4,455
Aug 20246375.632.06$4,765
Jul 202410379.932.15$8,233
Jun 20247078.082.63$5,466
May 202411578.812.20$9,063
Apr 202414884.451.66$12,499
Mar 20248980.301.55$7,147
Feb 202411376.091.78$8,598
Jan 20246173.023.30$4,454
Dec 20236271.262.61$4,418
Nov 20239377.892.81$7,244
Oct 20239485.443.09$8,031
Sep 20235389.042.74$4,719
Aug 20238280.522.67$6,603
Jul 20235374.852.64$3,967
Jun 20238068.962.26$5,517
May 20238370.622.23$5,861
Apr 20235578.122.24$4,297
Mar 20238372.852.39$6,047
Feb 202311175.112.47$8,337
Jan 20235976.533.39$4,515
Dec 20228476.415.73$6,418
Nov 20228485.005.65$7,140
Oct 20225887.185.86$5,056
Sep 20228384.888.16$7,045
Aug 20225694.529.13$5,293
Jul 202295101.587.54$9,650
Jun 202273115.097.98$8,402
May 202289109.378.43$9,734
Apr 202257104.226.84$5,941
Mar 202299108.885.08$10,779
Feb 20227891.054.86$7,102
Jan 20227781.844.54$6,302
Dec 202111971.323.90$8,487
Nov 202112877.435.24$9,911
Oct 202110979.795.71$8,697
Sep 20219469.865.35$6,567
Aug 20219466.024.22$6,206
Jul 202112670.783.98$8,918
Jun 20219369.493.38$6,463
May 202113263.483.02$8,379
Apr 20216760.362.76$4,044
Mar 202113261.302.72$8,092
Feb 20216757.805.55$3,873
Jan 20219250.412.81$4,638
Dec 20209844.642.68$4,375
Nov 20206938.772.71$2,675
Oct 20207136.972.48$2,625
Sep 20207037.091.99$2,596
Aug 20206439.982.39$2,559
Jul 20209738.371.83$3,722
Jun 202010634.901.69$3,699
May 202013316.921.81$2,250
Apr 202017314.751.80$2,552
Mar 20209630.341.86$2,913
Feb 20209849.881.98$4,888
Jan 20209757.252.09$5,553
Dec 201913059.012.30$7,671
Nov 20199955.302.75$5,475
Oct 201910053.472.42$5,347
Sep 201911255.052.66$6,166
Aug 20198953.112.30$4,727
Jul 201912556.272.46$7,034
Jun 20199052.782.49$4,750
May 201912558.482.74$7,310
Apr 201912362.632.75$7,703
Mar 201913556.803.06$7,668
Feb 20198650.852.79$4,373
Jan 20198946.033.23$4,097
Dec 20186946.594.19$3,215
Nov 201812652.934.24$6,669
Oct 201812661.443.40$7,741
Sep 20189959.543.11$5,894
Aug 201812559.403.07$7,425
Jul 201811965.142.93$7,752
Jun 20185160.183.08$3,069
May 20184365.382.90$2,811
Apr 20183063.842.90$1,915
Mar 20183161.222.79$1,898
Feb 20183261.782.77$1,977
Jan 20182762.874.01$1,697
Dec 20174257.272.92$2,405
Nov 20175755.423.12$3,159
Oct 20175649.292.98$2,760
Sep 20171047.523.09$475
Aug 20171845.373.00$817
Jul 20174243.873.09$1,843
Jun 20172542.493.09$1,062
May 20174745.373.26$2,132
Apr 20174547.933.21$2,157
Mar 20177546.772.98$3,508
Feb 20175050.452.95$2,523
Jan 20172649.413.42$1,285
Dec 20163348.763.72$1,609
Nov 20163242.492.64$1,360
Oct 20163146.193.09$1,432
Sep 20164141.553.10$1,704
Aug 20165341.442.92$2,196
Jul 20167841.622.92$3,246
Jun 20164145.352.69$1,859
May 201610042.521.99$4,252
Apr 20164436.561.99$1,609
Mar 201610333.011.79$3,400
Feb 20164526.472.06$1,191
Jan 20166727.352.36$1,832
Dec 20156432.362.00$2,071
Nov 20158438.792.17$3,258
Oct 20157743.552.43$3,353
Sep 20158442.992.76$3,611
Aug 20156440.162.87$2,570
Jul 201510348.152.95$4,959
Jun 20156656.152.88$3,706
May 20157555.212.96$4,141
Apr 20158349.822.71$4,135
Mar 20158542.892.93$3,646
Feb 20158444.662.98$3,751
Jan 20153243.433.10$1,390
Dec 20145354.693.59$2,899
Nov 20145370.464.25$3,734
Oct 20149778.303.90$7,595
Sep 201410486.164.05$8,961
Aug 201410889.394.04$9,654
Jul 20146996.564.18$6,663
Jun 20147898.164.74$7,656
May 20149294.734.73$8,715
Apr 201413295.944.81$12,664
Mar 20149595.895.06$9,110
Feb 201410897.406.19$10,519
Jan 201411590.404.86$10,396
Dec 201313991.824.35$12,763
Nov 201313188.853.74$11,639
Oct 201312097.423.78$11,690
Sep 2013127104.113.72$13,222
Aug 201398104.253.52$10,217
Jul 2013113102.523.72$11,585
Jun 20135794.403.93$5,381
May 20139594.834.15$9,009
Apr 201311593.964.28$10,805
Mar 20137993.623.91$7,396
Feb 201311591.233.42$10,491
Jan 201314191.603.42$12,916
Dec 201214586.773.42$12,582
Nov 201211686.953.62$10,086
Oct 201213889.383.40$12,334
Sep 20127694.672.92$7,195
Aug 20124492.662.91$4,077
Jul 201212985.133.02$10,982
Jun 201211879.822.52$9,419
May 20129491.612.49$8,611
Apr 2012116101.652.00$11,791
Mar 2012147105.052.22$15,442
Feb 2012123101.102.57$12,435
Jan 201215398.092.73$15,008
Dec 201114096.873.24$13,562
Nov 201114295.723.31$13,592
Oct 201115984.983.65$13,512
Sep 201110483.623.99$8,696
Aug 201118983.404.15$15,763
Jul 201117394.144.52$16,286
Jun 201116692.904.64$15,421
May 201117098.134.40$16,682
Apr 2011108105.964.33$11,444
Mar 201118096.364.06$17,345
Feb 20117485.644.18$6,337
Jan 201128686.504.59$24,739
Dec 201023985.734.35$20,489
Nov 201024180.843.80$19,482
Oct 201035078.103.51$27,335
Sep 201030772.633.98$22,297
Aug 201013773.684.42$10,094
Jul 20107872.554.74$5,659
Jun 20104970.364.91$3,448
May 20103071.124.24$2,134
Apr 20105181.694.12$4,166
Mar 20105278.394.39$4,076
Feb 20109273.585.44$6,769
Jan 20107074.365.96$5,205
Dec 200914271.445.48$10,144
Nov 200914374.593.75$10,666
Oct 200913872.544.11$10,011
Sep 20099365.543.06$6,095
Aug 20098667.423.22$5,798
Jul 20091661.133.46$978
Jun 20091866.163.90$1,191
May 20091154.743.93$602
Apr 20093246.773.59$1,497
Mar 20099842.144.06$4,130
Feb 200912032.814.63$3,937
Jan 200913835.865.37$4,949
Dec 200820437.105.98$7,568
Nov 200816355.496.86$9,045
Oct 200819875.246.92$14,898
Sep 2008184101.767.88$18,724
Aug 2008185114.228.48$21,131
Jul 2008190131.0811.39$24,905

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2026 — as filed, then multipliedworked
Oil                   84 bbl  × $ 89.75 =     $7,539

────────────────────────────────────────────────────
Month total                                   $7,539

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/39192 is the state's own key, not one this site invented.