CONNELL 29

Operated by RAPTOR PETROLEUM DEVELOP, LLC (P-5 685814) in the JORDAN field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 39609District 08Field 47267001Hydrogen sulphide fieldOilSaveExport
Value, all time
$791 k
May 2009 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
205
no gaps in the span
Streams
1
oil

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 11 leases and 551 wells, and the rule below applies to all of them.

Discovered
1937-12-31
as the register files it
Field class
Oil
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 10 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: OPTIONAL 10 ACRE UNITS-SEE RULE 2.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition10,064 bbl$790,636
Total$790,636

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.6617, -102.6180. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.66170, -102.61800 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
2,851 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 2,851 ft.

Completions filed
Sep 2019
1 of 1 wells

1 well

42-1353960712,851 ftSep 2019

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (205)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

205 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 2017057.272.92$0
Nov 20177055.423.12$3,879
Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 2017045.373.00$0
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 2017047.933.21$0
Mar 2017046.772.98$0
Feb 2017050.452.95$0
Jan 2017049.413.42$0
Dec 2016048.763.72$0
Nov 2016042.492.64$0
Oct 2016046.193.09$0
Sep 2016041.553.10$0
Aug 201616041.442.92$6,630
Jul 2016041.622.92$0
Jun 2016045.352.69$0
May 2016042.521.99$0
Apr 2016036.561.99$0
Mar 201616933.011.79$5,579
Feb 2016026.472.06$0
Jan 2016027.352.36$0
Dec 201516832.362.00$5,436
Nov 2015038.792.17$0
Oct 2015043.552.43$0
Sep 201515942.992.76$6,835
Aug 201516740.162.87$6,707
Jul 2015048.152.95$0
Jun 2015156.152.88$56
May 2015055.212.96$0
Apr 201517649.822.71$8,768
Mar 2015042.892.93$0
Feb 2015044.662.98$0
Jan 201517743.433.10$7,687
Dec 2014054.693.59$0
Nov 2014070.464.25$0
Oct 201417078.303.90$13,311
Sep 2014086.164.05$0
Aug 201417189.394.04$15,286
Jul 2014096.564.18$0
Jun 201417098.164.74$16,687
May 2014094.734.73$0
Apr 201417295.944.81$16,502
Mar 2014095.895.06$0
Feb 2014097.406.19$0
Jan 2014190.404.86$90
Dec 201317491.824.35$15,977
Nov 2013388.853.74$267
Oct 201316397.423.78$15,879
Sep 20130104.113.72$0
Aug 20131104.253.52$104
Jul 2013133102.523.72$13,635
Jun 2013094.403.93$0
May 201314694.834.15$13,845
Apr 201317793.964.28$16,631
Mar 2013093.623.91$0
Feb 201316791.233.42$15,235
Jan 2013091.603.42$0
Dec 2012086.773.42$0
Nov 201215886.953.62$13,738
Oct 201216889.383.40$15,016
Sep 201217094.672.92$16,094
Aug 201217192.662.91$15,845
Jul 2012185.133.02$85
Jun 2012079.822.52$0
May 201216191.612.49$14,749
Apr 20120101.652.00$0
Mar 2012169105.052.22$17,753
Feb 20120101.102.57$0
Jan 201217298.092.73$16,871
Dec 201116496.873.24$15,887
Nov 201118095.723.31$17,230
Oct 2011084.983.65$0
Sep 201116983.623.99$14,132
Aug 201117283.404.15$14,345
Jul 201116194.144.52$15,157
Jun 201132892.904.64$30,471
May 201116798.134.40$16,388
Apr 20117105.964.33$742
Mar 201117896.364.06$17,152
Feb 201134785.644.18$29,717
Jan 201116886.504.59$14,532
Dec 201015685.734.35$13,374
Nov 201047280.843.80$38,156
Oct 201015678.103.51$12,184
Sep 2010072.633.98$0
Aug 201016073.684.42$11,789
Jul 2010072.554.74$0
Jun 201017070.364.91$11,961
May 201017171.124.24$12,162
Apr 201016881.694.12$13,724
Mar 201017078.394.39$13,326
Feb 201033873.585.44$24,870
Jan 201016874.365.96$12,492
Dec 200931371.445.48$22,361
Nov 200930874.593.75$22,974
Oct 2009072.544.11$0
Sep 200959165.543.06$38,734
Aug 200961767.423.22$41,598
Jul 2009061.133.46$0
Jun 2009066.163.90$0
May 2009054.743.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2017 — as filed, then multipliedworked
Oil                   70 bbl  × $ 55.42 =     $3,879

────────────────────────────────────────────────────
Month total                                   $3,879

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/39609 is the state's own key, not one this site invented.