FRAZIER - FROMAN UNIT

Operated by DIAMONDBACK E&P LLC (P-5 217012) in the SPRABERRY (TREND AREA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 42725District 08Field 85280300OilCasinghead gasSaveExport
Value, all time
$5.6 M
Jun 2012 – Dec 2025
Value, last 12 filed months
$0
at the published price for each month
Months reported
163
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 16,587 leases and 43,997 wells, and the rule below applies to all of them.

Discovered
1952-12-22
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2018-02-13.

The Commission's schedule remark for this field reads: SPRABERRY (TREND AREA) FIELD EFFECTIVE 10/1/2019.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition48,277 bbl$3,960,859
Casinghead gasProduction463,226 Mcf$1,666,842
Total$5,627,701

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4239, -101.7215. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.42391, -101.72155 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,777 ft
1 wells filed one
Completion to plug
13.4 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,777 ft.

Completions filed
Jun 2012
1 of 1 wells
Plug dates filed
Nov 2025
1 of 1 wells

Last completion to plug: a median of 13.4 years across the 1 well that filed both dates, with the middle half between 13.4 years and 13.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-31737461110,777 ftJun 2012Nov 2025Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (163)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

163 months

Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 2022880104.226.84$9,171
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20211605979.795.71$13,104
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 2021425069.493.38$1,123
May 202117015263.483.02$11,250
Apr 20211685260.362.76$10,284
Mar 20210961.302.72$24
Feb 202101257.805.55$67
Jan 202118015850.412.81$9,518
Dec 2020021844.642.68$583
Nov 202016928138.772.71$7,313
Oct 202016638136.972.48$7,081
Sep 202009137.091.99$181
Aug 202017216639.982.39$7,272
Jul 20201773038.371.83$6,846
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20201625714.751.80$2,492
Mar 2020021330.341.86$395
Feb 202017257749.881.98$9,722
Jan 202017478257.252.09$11,600
Dec 201917479059.012.30$12,088
Nov 201917571055.302.75$11,631
Oct 201916777653.472.42$10,806
Sep 2019070155.052.66$1,863
Aug 201914855753.112.30$9,144
Jul 201915064956.272.46$10,037
Jun 201914182352.782.49$9,492
May 201914265158.482.74$10,088
Apr 201914684362.632.75$11,463
Mar 201927891556.803.06$18,592
Feb 201914853150.852.79$9,008
Jan 201914634746.033.23$7,841
Dec 201815123046.594.19$7,998
Nov 201814142652.934.24$9,268
Oct 2018036161.443.40$1,227
Sep 201814333559.543.11$9,555
Aug 201813672059.403.07$10,286
Jul 2018041965.142.93$1,228
Jun 201815012460.183.08$9,409
May 201816237465.382.90$11,676
Apr 2018028363.842.90$821
Mar 201818757761.222.79$13,056
Feb 2018068961.782.77$1,906
Jan 201817587962.874.01$14,526
Dec 2017090857.272.92$2,653
Nov 201718592355.423.12$13,131
Oct 20178572049.292.98$6,338
Sep 20171631,60347.523.09$12,695
Aug 201701,82945.373.00$5,495
Jul 20171572,82343.873.09$15,603
Jun 20171662,66942.493.09$15,293
May 20171542,55345.373.26$15,318
Apr 2017094947.933.21$3,048
Mar 20171701,75946.772.98$13,199
Feb 20171551,30350.452.95$11,667
Jan 20171761,33249.413.42$13,250
Dec 20161662,39748.763.72$17,018
Nov 20161692,79742.492.64$14,577
Oct 201602,37446.193.09$7,336
Sep 20161622,24141.553.10$13,680
Aug 20161682,78141.442.92$15,095
Jul 20161691,76141.622.92$12,184
Jun 20161623,07845.352.69$15,614
May 20161733,22042.521.99$13,767
Apr 20161743,40136.561.99$13,133
Mar 20161733,42433.011.79$11,853
Feb 20161662,90626.472.06$10,391
Jan 20161592,70227.352.36$10,737
Dec 20151643,39332.362.00$12,098
Nov 20151733,53238.792.17$14,366
Oct 20151653,99243.552.43$16,873
Sep 20151643,99842.992.76$18,079
Aug 20151693,47140.162.87$16,757
Jul 20153244,19848.152.95$27,964
Jun 20151672,92856.152.88$17,818
May 20151651,36055.212.96$13,129
Apr 20151703,23149.822.71$17,214
Mar 20153514,35642.892.93$27,838
Feb 20151724,30244.662.98$20,485
Jan 20151774,63643.433.10$22,062
Dec 20143514,82654.693.59$36,528
Nov 20141643,78170.464.25$27,632
Oct 20143321,75178.303.90$32,826
Sep 20141713,85386.164.05$30,320
Aug 20143318,09389.394.04$62,244
Jul 20143318,39296.564.18$67,037
Jun 20146757,66198.164.74$102,547
May 20143434,14294.734.73$52,070
Apr 20141721,46195.944.81$23,528
Mar 201404,70895.895.06$23,807
Feb 20141521,57997.406.19$24,582
Jan 20144039,51690.404.86$82,686
Dec 201349614,47091.824.35$108,552
Nov 201335718,00488.853.74$99,023
Oct 201383822,21197.423.78$165,581
Sep 201349725,839104.113.72$147,805
Aug 20131,16124,852104.253.52$208,578
Jul 20131,21731,188102.523.72$240,716
Jun 20131,72030,57294.403.93$282,620
May 20132,23928,14194.834.15$329,084
Apr 20131,83816,35893.964.28$242,753
Mar 20132,00313,93093.623.91$242,027
Feb 20132,12012,71291.233.42$236,882
Jan 20132,49010,70891.603.42$264,704
Dec 20122,63410,10486.773.42$263,109
Nov 20122,4417,19386.953.62$238,319
Oct 20123,3326,69889.383.40$320,585
Sep 20121,7414,62694.672.92$178,321
Aug 20123,5995,78792.662.91$350,313
Jul 20122,7865,48485.133.02$253,738
Jun 20127081,53879.822.52$60,387

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2022 — as filed, then multipliedworked
Oil                   88 bbl  × $104.22 =     $9,171
Casinghead gas         0 Mcf  × $  6.84 =         $0

────────────────────────────────────────────────────
Month total                                   $9,171

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/42725 is the state's own key, not one this site invented.