GINGER 22-27

Operated by CRESCENT ENERGY OPERATING, LLC (P-5 103575) in the SPRABERRY (TREND AREA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 49789District 08Field 85280300OilCasinghead gasSave
Value, all time
$108.2 M
Oct 2017 – May 2026
Value, last 12 filed months
$8.1 M
at the published price for each month
Months reported
104
no gaps in the span
Streams
2
oil, casinghead gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition1,582,025 bbl$95,835,932
Casinghead gasProduction3,440,143 Mcf$12,352,276
Total$108,188,208

Wells on this lease (4)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4088, -101.4804. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.1 miles.

32.40881, -101.48038 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 4 wells
With a plug date
0.0%
0 of 4 wells
Median depth
7,374 ft
4 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
4100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 6,536 and 7,552 ft, median 7,374 ft, over the 4 wells that filed a depth.

Completions filed
Jun 2020 – Jan 2021
4 of 4 wells

4 wells

42-227396751MS6,536 ftJan 2021
42-227392571AH7,535 ftNov 2020
42-227396772AH7,552 ftAug 2020
42-227396762SH7,212 ftJun 2020

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (104)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

104 months

May 20266,44552,975106.413.05$847,166
Apr 20265,24944,98898.932.87$648,387
Mar 20265,52246,79189.753.15$642,965
Feb 20266,15048,81363.503.75$573,589
Jan 20265,38549,69059.138.00$715,832
Dec 20257,49554,32256.664.41$664,409
Nov 20258,27655,18558.593.93$701,571
Oct 20259,55856,79559.383.30$755,252
Sep 20257,48050,36862.743.08$624,274
Aug 20257,89748,39363.933.01$650,748
Jul 20255,73738,54366.743.32$510,665
Jun 20258,51049,84566.483.13$721,696
May 20258,44244,80460.553.23$655,984
Apr 20257,47041,02262.363.54$611,175
Mar 20256,65233,19167.704.27$592,010
Feb 20257,29535,19670.884.34$669,850
Jan 20257,29438,30174.324.28$705,968
Dec 20248,11036,99168.993.12$674,972
Nov 20246,57433,37669.052.20$527,310
Oct 20247,60736,43571.372.28$626,034
Sep 20245,81728,53669.612.36$472,391
Aug 20247,91334,80575.632.06$670,285
Jul 20249,59940,10079.932.15$853,326
Jun 20248,43031,56378.082.63$741,351
May 202411,56929,06278.812.20$975,644
Apr 202411,66831,42184.451.66$1,037,496
Mar 20249,51031,15880.301.55$811,796
Feb 20245,70819,75176.091.78$469,550
Jan 20247,22226,34973.023.30$614,240
Dec 20237,96326,67671.262.61$637,087
Nov 20238,85427,44777.892.81$766,697
Oct 20239,22727,05885.443.09$871,891
Sep 20239,58028,49189.042.74$930,927
Aug 20239,37426,86780.522.67$826,607
Jul 20239,81723,77274.852.64$797,603
Jun 20238,01516,62968.962.26$590,271
May 20239,69617,19670.622.23$723,034
Apr 20238,5996,67478.122.24$686,689
Mar 20235,5772,28172.852.39$411,743
Feb 2023104975.112.47$7,834
Jan 20232,39112,16776.533.39$224,202
Dec 20227,15433,39376.415.73$737,948
Nov 20228,09535,46185.005.65$888,295
Oct 20228,40151,05387.185.86$1,031,762
Sep 20227,84846,27084.888.16$1,043,872
Aug 202210,88351,35994.529.13$1,497,423
Jul 202210,42448,825101.587.54$1,427,112
Jun 20229,98643,056115.097.98$1,492,755
May 202210,20545,410109.378.43$1,499,065
Apr 202211,18547,423104.226.84$1,489,960
Mar 20229,17424,721108.885.08$1,124,359
Feb 20226,64133,59791.054.86$767,906
Jan 20228,11838,40581.844.54$838,647
Dec 202118,00351,21471.323.90$1,483,663
Nov 20218,35044,80777.435.24$881,188
Oct 20217,20841,99479.795.71$815,075
Sep 20217,78234,73069.865.35$729,488
Aug 202113,57318,66366.024.22$974,858
Jul 202113,05530,09670.783.98$1,043,878
Jun 202113,59729,02969.493.38$1,042,992
May 202114,80441,14763.483.02$1,063,926
Apr 202116,40828,18560.362.76$1,068,133
Mar 202119,45022,76361.302.72$1,254,131
Feb 202112,35027,34757.805.55$865,550
Jan 202117,54340,74850.412.81$998,856
Dec 202018,58041,63344.642.68$940,799
Nov 202017,85538,87838.772.71$797,464
Oct 202021,20735,19036.972.48$871,239
Sep 202021,93233,97037.091.99$881,094
Aug 202021,82222,12739.982.39$925,219
Jul 202020,70239,44338.371.83$866,324
Jun 202022,75238,04234.901.69$858,348
May 202010,07928,51616.921.81$222,286
Apr 202026,74640,26514.751.80$467,157
Mar 202025,76238,74530.341.86$853,539
Feb 202026,25930,29749.881.98$1,369,807
Jan 202028,38854,93157.252.09$1,740,279
Dec 201927,37252,47159.012.30$1,736,134
Nov 201933,16864,91855.302.75$2,012,760
Oct 201938,13868,43053.472.42$2,204,740
Sep 201934,15157,08155.052.66$2,031,693
Aug 201946,41570,05453.112.30$2,626,530
Jul 201944,82558,22556.272.46$2,665,540
Jun 201948,62262,16252.782.49$2,721,127
May 201960,63063,87258.482.74$3,720,672
Apr 201966,83058,22562.632.75$4,345,722
Mar 201979,22359,78956.803.06$4,682,946
Feb 201963,751050.852.79$3,241,738
Jan 201925,590046.033.23$1,177,908
Dec 20180046.594.19$0
Nov 20183,8503,84052.934.24$220,052
Oct 201812,21412,17261.443.40$791,790
Sep 201814,98611,45859.543.11$927,878
Aug 201817,29214,55659.403.07$1,071,782
Jul 201817,26312,36565.142.93$1,160,765
Jun 201820,46312,62260.183.08$1,270,300
May 201828,23115,57365.382.90$1,890,917
Apr 201834,0846,56163.842.90$2,194,955
Mar 201822,824061.222.79$1,397,285
Feb 20181061.782.77$62
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                6,445 bbl  × $106.41 =   $685,812
Casinghead gas    52,975 Mcf  × $  3.05 =   $161,353

────────────────────────────────────────────────────
Month total                                 $847,166

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/49789 is the state's own key, not one this site invented.