MATTHEW PSA 'C'

Operated by LAKE CRYSTAL OPERATING LLC (P-5 482984) in the GARDEN CITY, S. (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 50191District 08Field 33998500OilCasinghead gasSave
Value, all time
$7.7 M
Feb 2018 – May 2026
Value, last 12 filed months
$733 k
at the published price for each month
Months reported
100
no gaps in the span
Streams
2
oil, casinghead gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition113,425 bbl$7,388,699
Casinghead gasProduction77,735 Mcf$261,526
Total$7,650,225

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0370, -101.6282. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.03702, -101.62823 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,372 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,372 ft.

Completions filed
Mar 2018
1 of 1 wells

1 well

42-173375310704HC7,372 ftMar 2018

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (100)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

100 months

May 20268951,197106.413.05$98,883
Apr 20267341,12798.932.87$75,849
Mar 20267271,08089.753.15$68,650
Feb 202653864563.503.75$36,582
Jan 202654243359.138.00$35,512
Dec 202573399856.664.41$45,936
Nov 20257461,07658.593.93$47,933
Oct 20258961,23659.383.30$57,289
Sep 20259351,32862.743.08$62,748
Aug 20259061,37363.933.01$62,060
Jul 20259301,33566.743.32$66,494
Jun 20251,0721,26066.483.13$75,209
May 20251,4421,56160.553.23$92,359
Apr 20251,4791,55762.363.54$97,747
Mar 20251,4231,14267.704.27$101,212
Feb 20251,2871,07370.884.34$95,880
Jan 20251,4281,29774.324.28$111,678
Dec 20241,06986268.993.12$76,441
Nov 20241,29092869.052.20$91,115
Oct 20241,4621,06371.372.28$106,768
Sep 20241,06853869.612.36$75,616
Aug 20241,19021475.632.06$90,441
Jul 202436141379.932.15$29,741
Jun 20241,03848978.082.63$82,335
May 202468859578.812.20$55,529
Apr 20241,05342584.451.66$89,631
Mar 20241,0591,15880.301.55$86,827
Feb 2024872076.091.78$66,350
Jan 202447363473.023.30$36,629
Dec 20232998271.262.61$21,521
Nov 20231648277.892.81$13,004
Oct 202351318985.443.09$44,414
Sep 202385034389.042.74$76,622
Aug 202318457080.522.67$16,339
Jul 202335920374.852.64$27,407
Jun 202377229068.962.26$53,892
May 202336536770.622.23$26,594
Apr 202389986678.122.24$72,168
Mar 20231,0881,34072.852.39$82,468
Feb 20231,24892275.112.47$96,011
Jan 20231,5291,42676.533.39$121,845
Dec 20221,5501,64176.415.73$127,837
Nov 202234930285.005.65$31,370
Oct 20221,04640987.185.86$93,589
Sep 202267735284.888.16$60,337
Aug 20223556994.529.13$34,184
Jul 20221,211504101.587.54$126,815
Jun 20221,61016115.097.98$185,423
May 2022534241109.378.43$60,436
Apr 2022528345104.226.84$57,387
Mar 2022990568108.885.08$110,675
Feb 202289154991.054.86$83,793
Jan 20221,2031,09581.844.54$103,422
Dec 20211,06176671.323.90$78,657
Nov 20211,59086277.435.24$127,628
Oct 202134237379.795.71$29,419
Sep 20211,73827569.865.35$122,888
Aug 202187828766.024.22$59,177
Jul 20211,21255170.783.98$87,979
Jun 20211,55359469.493.38$109,926
May 20211,22867863.483.02$79,999
Apr 20211,0536760.362.76$63,744
Mar 2021525961.302.72$32,207
Feb 2021557057.805.55$32,195
Jan 202186060750.412.81$45,058
Dec 20201,21256944.642.68$55,626
Nov 20201,35842538.772.71$53,800
Oct 20201,05283336.972.48$40,957
Sep 20201,19360737.091.99$45,457
Aug 20201,53278239.982.39$63,115
Jul 20201,03927338.371.83$40,365
Jun 2020650134.901.69$22,687
May 20201957716.921.81$3,439
Apr 20201,85274214.751.80$28,656
Mar 202069233930.341.86$21,625
Feb 202086944749.881.98$44,231
Jan 202035328557.252.09$20,806
Dec 20196884959.012.30$40,712
Nov 20198362055.302.75$46,286
Oct 20191,031153.472.42$55,130
Sep 20191,205155.052.66$66,338
Aug 20191,354653.112.30$71,925
Jul 20191,703156.272.46$95,830
Jun 20191,326152.782.49$69,989
May 20191,5791,21158.482.74$95,658
Apr 20191,0351,92762.632.75$70,123
Mar 20191,7053,23956.803.06$106,762
Feb 20191,0271,82850.852.79$57,327
Jan 20191,8651,93946.033.23$92,105
Dec 20181,8281,26946.594.19$90,478
Nov 20181,6801,50752.934.24$95,308
Oct 20185266,06861.443.40$52,937
Sep 20183,6081,21859.543.11$218,606
Aug 20183,7241,45659.403.07$225,671
Jul 20182,9141,04665.142.93$192,885
Jun 20183,5971,16460.183.08$220,049
May 20184,0391,42465.382.90$268,201
Apr 20183,6851,77163.842.90$240,388
Mar 201832625161.222.79$20,657
Feb 201808161.782.77$224

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                  895 bbl  × $106.41 =    $95,237
Casinghead gas     1,197 Mcf  × $  3.05 =     $3,646

────────────────────────────────────────────────────
Month total                                  $98,883

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/50191 is the state's own key, not one this site invented.