RENDEZVOUS NORTH POOLED UNIT

Operated by APACHE CORPORATION (P-5 27200) in the PHANTOM (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 50227District 08Field 71052900OilCasinghead gasSave
Value, all time
$130.0 M
Apr 2018 – May 2026
Value, last 12 filed months
$17.7 M
at the published price for each month
Months reported
98
no gaps in the span
Streams
2
oil, casinghead gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition1,879,564 bbl$122,314,754
Casinghead gasProduction2,360,663 Mcf$7,685,291
Total$130,000,045

Wells on this lease (5)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.5191, -103.1824. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.5 miles.

31.51968, -103.18257 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 5 wells
With a plug date
0.0%
0 of 5 wells
Median depth
11,414 ft
5 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
5100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 10,868 and 11,832 ft, median 11,414 ft, over the 5 wells that filed a depth.

Completions filed
Jan 2019 – Mar 2024
5 of 5 wells

5 wells

42-4753865728SB10,868 ftMar 2024
42-4753865918H11,832 ftMar 2024
42-4753866010UA11,414 ftMar 2024
42-475373361LA11,419 ftJan 2019
42-475373379UA11,256 ftJan 2019

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (98)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

98 months

May 202615,63825,834106.413.05$1,742,726
Apr 202619,73133,86198.932.87$2,049,159
Mar 202622,50134,50289.753.15$2,128,127
Feb 202618,37040,74363.503.75$1,319,294
Jan 202618,19634,66459.138.00$1,353,169
Dec 202516,70630,89456.664.41$1,082,908
Nov 202517,65437,30758.593.93$1,180,832
Oct 202520,76640,67159.383.30$1,367,496
Sep 202522,26541,69062.743.08$1,525,183
Aug 202517,17732,19263.933.01$1,195,177
Jul 202519,00435,04066.743.32$1,384,492
Jun 202519,03331,76866.483.13$1,364,707
May 202521,09135,43560.553.23$1,391,597
Apr 202523,37438,36662.363.54$1,593,538
Mar 202525,41641,94467.704.27$1,899,694
Feb 202523,29542,26370.884.34$1,834,607
Jan 202526,18655,68874.324.28$2,184,415
Dec 202428,24148,07068.993.12$2,098,391
Nov 202427,47047,34569.052.20$2,000,889
Oct 202426,30245,85671.372.28$1,981,790
Sep 202428,31851,63569.612.36$2,093,300
Aug 202437,40662,42375.632.06$2,957,834
Jul 202444,04170,41279.932.15$3,671,343
Jun 202449,94971,51278.082.63$4,088,379
May 202442,27554,73078.812.20$3,452,013
Apr 202444,16056,48984.451.66$3,823,039
Mar 20246,5159,62380.301.55$538,023
Feb 20242,8442,27576.091.78$220,458
Jan 20244,9205,25873.023.30$376,598
Dec 20234,5645,36771.262.61$339,242
Nov 20235,7987,66577.892.81$473,126
Oct 20237,2458,11185.443.09$644,054
Sep 20237,8558,34989.042.74$722,244
Aug 202378257580.522.67$64,504
Jul 20237,49512,52574.852.64$594,089
Jun 20235,26010,92268.962.26$387,397
May 20236,33012,42170.622.23$474,691
Apr 20236,47610,58378.122.24$529,587
Mar 20236,9278,81372.852.39$525,723
Feb 20235,5288,96075.112.47$437,301
Jan 20236,3037,23976.533.39$506,892
Dec 20224,5999,46076.415.73$405,607
Nov 20226,40511,41385.005.65$608,865
Oct 20226,2408,99387.185.86$596,736
Sep 20227,09314,03784.888.16$716,647
Aug 20228,47212,56894.529.13$915,484
Jul 20228,63412,027101.587.54$967,750
Jun 20229,2268,516115.097.98$1,129,754
May 20229,58010,528109.378.43$1,136,548
Apr 20229,96010,876104.226.84$1,112,397
Mar 202211,26113,633108.885.08$1,295,304
Feb 20229,13410,43191.054.86$882,333
Jan 202210,93312,58881.844.54$951,877
Dec 202111,20512,48071.323.90$847,802
Nov 202112,13713,47777.435.24$1,010,345
Oct 202111,68313,76579.795.71$1,010,838
Sep 202111,78913,11669.865.35$893,762
Aug 202111,41415,07166.024.22$817,161
Jul 202112,26613,28970.783.98$921,105
Jun 202112,05414,85569.493.38$887,852
May 202112,14315,07763.483.02$816,335
Apr 202111,46316,21760.362.76$736,640
Mar 202113,88810,66261.302.72$880,302
Feb 20218,9425,89257.805.55$549,536
Jan 202113,29610,93250.412.81$700,973
Dec 202014,2359,81444.642.68$661,707
Nov 202013,9809,19338.772.71$566,886
Oct 202013,2839,38436.972.48$514,330
Sep 202014,46813,09237.091.99$562,685
Aug 202014,84213,52239.982.39$625,634
Jul 202015,02712,76438.371.83$599,882
Jun 202014,90912,53434.901.69$541,510
May 202016,89513,98616.921.81$311,244
Apr 202016,69112,79614.751.80$269,281
Mar 202018,64015,48930.341.86$594,289
Feb 202017,26316,58449.881.98$893,926
Jan 202018,89117,90357.252.09$1,119,012
Dec 201919,03916,25759.012.30$1,160,953
Nov 201915,76015,89755.302.75$915,256
Oct 201919,11515,06453.472.42$1,058,512
Sep 201919,38916,72955.052.66$1,111,818
Aug 201922,81420,15453.112.30$1,258,094
Jul 201924,12320,92156.272.46$1,408,868
Jun 201922,66222,45352.782.49$1,252,035
May 201925,66933,98958.482.74$1,594,264
Apr 201925,47214,61362.632.75$1,635,507
Mar 201926,09620,08056.803.06$1,543,740
Feb 201917,2209,73850.852.79$902,828
Jan 20199,6548,09046.033.23$470,490
Dec 201833,33327,21046.594.19$1,666,870
Nov 201834,40828,22352.934.24$1,940,803
Oct 201837,96733,70261.443.40$2,447,215
Sep 201840,17537,78559.543.11$2,509,455
Aug 201845,62544,13259.403.07$2,845,458
Jul 201854,98456,48965.142.93$3,747,277
Jun 201866,88371,74260.183.08$4,245,763
May 201884,72093,06865.382.90$5,808,965
Apr 201842,10847,34363.842.90$2,825,507

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil               15,638 bbl  × $106.41 = $1,664,040
Casinghead gas    25,834 Mcf  × $  3.05 =    $78,686

────────────────────────────────────────────────────
Month total                               $1,742,726

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/50227 is the state's own key, not one this site invented.