UL 20 STRIPES 38-47

Operated by CRESCENT ENERGY OPERATING, LLC (P-5 103575) in the PHANTOM (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 51736District 08Field 71052900OilCasinghead gasSave
Value, all time
$180.1 M
Sep 2018 – May 2026
Value, last 12 filed months
$12.2 M
at the published price for each month
Months reported
93
no gaps in the span
Streams
2
oil, casinghead gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition2,682,492 bbl$170,407,192
Casinghead gasProduction2,753,444 Mcf$9,742,600
Total$180,149,792

Wells on this lease (6)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.6457, -103.2695. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.8 miles.

31.64563, -103.26944 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 6 wells
With a plug date
0.0%
0 of 6 wells
Median depth
11,651 ft
6 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
6100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 11,611 and 11,745 ft, median 11,651 ft, over the 6 wells that filed a depth.

Completions filed
Sep 2018 – Oct 2018
6 of 6 wells

6 wells

42-49533806603H11,730 ftOct 2018
42-49533808604H11,611 ftSep 2018
42-49533805602H11,632 ftSep 2018
42-49533792601H11,628 ftSep 2018
42-49533809605H11,745 ftSep 2018
42-49533807606H11,670 ftSep 2018

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (93)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

93 months

May 202613,97320,573106.413.05$1,549,529
Apr 202613,41919,14298.932.87$1,382,474
Mar 202613,50619,14789.753.15$1,272,466
Feb 202612,32417,27863.503.75$847,372
Jan 202610,66914,25559.138.00$744,868
Dec 202513,04820,00056.664.41$827,567
Nov 202515,07620,45358.593.93$963,610
Oct 202513,29919,06959.383.30$852,715
Sep 202514,29719,40662.743.08$956,704
Aug 202514,06820,60563.933.01$961,486
Jul 202514,22518,44166.743.32$1,010,512
Jun 202512,11514,17366.483.13$849,749
May 202513,12018,25860.553.23$853,432
Apr 202513,30218,62962.363.54$895,518
Mar 202514,13220,20667.704.27$1,042,982
Feb 202514,35218,48470.884.34$1,097,506
Jan 20259,07912,60574.324.28$728,684
Dec 202410,97115,57268.993.12$805,495
Nov 202412,45219,26269.052.20$902,157
Oct 202415,75423,42771.372.28$1,177,809
Sep 202410,92915,89069.612.36$798,337
Aug 20247,84613,17175.632.06$620,573
Jul 202411,66013,17079.932.15$960,254
Jun 202419,28917,86978.082.63$1,553,152
May 202417,30914,24678.812.20$1,395,441
Apr 202419,73720,01984.451.66$1,700,005
Mar 202421,75120,73080.301.55$1,778,636
Feb 202420,58720,43876.091.78$1,602,919
Jan 202416,64917,18173.023.30$1,272,367
Dec 202322,76217,72871.262.61$1,668,303
Nov 202320,44417,72777.892.81$1,642,153
Oct 202321,29616,85285.443.09$1,871,557
Sep 202321,26317,41189.042.74$1,940,877
Aug 202319,73818,10680.522.67$1,637,699
Jul 202320,87217,32574.852.64$1,608,038
Jun 202318,51717,32568.962.26$1,316,060
May 202322,216070.622.23$1,568,894
Apr 202316,982078.122.24$1,326,634
Mar 202324,93426,77972.852.39$1,880,528
Feb 202320,27323,01575.112.47$1,579,453
Jan 202323,05625,96376.533.39$1,852,431
Dec 202223,81728,39576.415.73$1,982,534
Nov 202224,26228,53085.005.65$2,223,356
Oct 202226,46832,06387.185.86$2,495,490
Sep 202226,35230,77984.888.16$2,488,028
Aug 202225,61728,92294.529.13$2,685,295
Jul 202226,49430,602101.587.54$2,922,063
Jun 202226,13029,774115.097.98$3,244,815
May 202228,59233,696109.378.43$3,411,267
Apr 202225,30527,471104.226.84$2,825,123
Mar 202229,28929,571108.885.08$3,339,101
Feb 202226,61128,08791.054.86$2,559,402
Jan 202230,17426,24981.844.54$2,588,550
Dec 202129,29531,32571.323.90$2,211,459
Nov 202129,19531,01377.435.24$2,422,979
Oct 202131,70432,93779.795.71$2,717,860
Sep 202130,51230,93069.865.35$2,297,072
Aug 202127,11027,99666.024.22$1,907,962
Jul 202134,58035,32370.783.98$2,588,231
Jun 202132,28635,76469.493.38$2,364,459
May 202131,93230,80163.483.02$2,119,991
Apr 202127,83627,41060.362.76$1,755,789
Mar 202123,54723,37261.302.72$1,506,931
Feb 202123,32525,29557.805.55$1,488,520
Jan 202129,92631,90850.412.81$1,598,240
Dec 202032,67332,46244.642.68$1,545,374
Nov 202031,36333,85338.772.71$1,307,569
Oct 202031,66031,45236.972.48$1,248,422
Sep 202031,56133,63137.091.99$1,237,558
Aug 202031,47533,38039.982.39$1,337,985
Jul 202031,33830,92638.371.83$1,258,883
Jun 202031,71233,44434.901.69$1,163,280
May 202031,90731,36916.921.81$596,793
Apr 202033,05333,25814.751.80$547,542
Mar 202035,14033,88030.341.86$1,129,037
Feb 202033,20333,64249.881.98$1,722,799
Jan 202037,19840,37357.252.09$2,214,156
Dec 201938,97739,91259.012.30$2,392,004
Nov 201937,89241,91055.302.75$2,210,709
Oct 201940,14245,84753.472.42$2,257,276
Sep 201943,73346,50455.052.66$2,531,076
Aug 201939,40638,79753.112.30$2,182,255
Jul 201939,81940,55156.272.46$2,340,373
Jun 201939,08637,98752.782.49$2,157,592
May 201946,18444,23158.482.74$2,822,047
Apr 201951,40351,44062.632.75$3,360,866
Mar 201960,88859,95956.803.06$3,642,039
Feb 201938,67836,48150.852.79$2,068,639
Jan 201965,08760,30746.033.23$3,190,636
Dec 201892,43087,07146.594.19$4,670,744
Nov 2018115,787100,62152.934.24$6,554,961
Oct 2018189,814154,13261.443.40$12,185,925
Sep 201819,23327,88159.543.11$1,231,787

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil               13,973 bbl  × $106.41 = $1,486,867
Casinghead gas    20,573 Mcf  × $  3.05 =    $62,662

────────────────────────────────────────────────────
Month total                               $1,549,529

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/51736 is the state's own key, not one this site invented.