VINCE EVERETT 13-12

Operated by CRESCENT ENERGY OPERATING, LLC (P-5 103575) in the SPRABERRY (TREND AREA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 52637District 08Field 85280300OilCasinghead gasSave
Value, all time
$183.5 M
Jun 2019 – May 2026
Value, last 12 filed months
$13.1 M
at the published price for each month
Months reported
84
no gaps in the span
Streams
2
oil, casinghead gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition2,224,513 bbl$163,220,753
Casinghead gasProduction4,594,524 Mcf$20,241,391
Total$183,462,144

Wells on this lease (7)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4743, -101.4522. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.4 miles.

32.47439, -101.45222 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 7 wells
With a plug date
0.0%
0 of 7 wells
Median depth
7,316 ft
7 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
7100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 7,006 and 7,399 ft, median 7,316 ft, over the 7 wells that filed a depth.

Completions filed
Jun 2019 – Apr 2021
7 of 7 wells

7 wells

42-227404493SH7,045 ftApr 2021
42-227404514SH7,006 ftApr 2021
42-227404504AH7,327 ftMar 2021
42-227404483AH7,316 ftMar 2021
42-227404462SH7,041 ftMar 2021
42-227404452AH7,322 ftMar 2021
42-227399201AH7,399 ftJun 2019

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (84)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

84 months

May 20264,29743,755106.413.05$590,515
Apr 20266,77249,95798.932.87$813,317
Mar 20268,52361,43589.753.15$958,425
Feb 20267,90653,84063.503.75$703,948
Jan 202610,74168,98159.138.00$1,186,820
Dec 202513,58677,27356.664.41$1,110,816
Nov 202513,62177,49258.593.93$1,102,322
Oct 202515,16380,04859.383.30$1,164,925
Sep 202515,44578,15162.743.08$1,209,484
Aug 202517,90081,28363.933.01$1,389,396
Jul 202516,36673,38566.743.32$1,335,553
Jun 202518,88698,39766.483.13$1,563,398
May 202520,54680,18860.553.23$1,503,254
Apr 202519,14471,02362.363.54$1,445,463
Mar 202520,10369,87367.704.27$1,659,213
Feb 202518,37761,15770.884.34$1,568,035
Jan 202522,17870,23174.324.28$1,948,765
Dec 202423,66668,32168.993.12$1,845,972
Nov 202423,84566,94469.052.20$1,793,670
Oct 202424,11462,26671.372.28$1,863,070
Sep 202420,59751,84769.612.36$1,556,342
Aug 202422,85554,51875.632.06$1,841,029
Jul 202422,87146,36679.932.15$1,927,608
Jun 202419,79523,03578.082.63$1,606,267
May 202414,6409,23078.812.20$1,174,070
Apr 20241,8871,27184.451.66$161,466
Mar 20244,63914,01680.301.55$394,168
Feb 202424,08267,73676.091.78$1,953,216
Jan 202427,48678,53673.023.30$2,266,013
Dec 202328,72777,22271.262.61$2,248,691
Nov 202329,15571,35277.892.81$2,471,208
Oct 202323,84059,28685.443.09$2,219,922
Sep 202319,42646,58289.042.74$1,857,095
Aug 202318,88150,06880.522.67$1,654,124
Jul 202313,68129,54374.852.64$1,102,070
Jun 20236,0435,90868.962.26$430,068
May 20239801,06770.622.23$71,584
Apr 20231078.122.24$78
Mar 20231,4933972.852.39$108,858
Feb 202317,99866,78475.112.47$1,516,498
Jan 202328,098101,43476.533.39$2,493,970
Dec 202228,465104,14276.415.73$2,771,649
Nov 202230,58995,03985.005.65$3,136,674
Oct 202222,51287,59087.185.86$2,476,203
Sep 202232,687110,32584.888.16$3,675,131
Aug 202233,086109,16794.529.13$4,123,673
Jul 202235,624119,766101.587.54$4,521,971
Jun 202237,774119,039115.097.98$5,297,008
May 202242,077116,256109.378.43$5,582,353
Apr 202242,005112,419104.226.84$5,146,437
Mar 202247,908117,117108.885.08$5,810,756
Feb 202246,553100,52091.054.86$4,727,061
Jan 202256,814115,53881.844.54$5,173,932
Dec 202133,12795,82371.323.90$2,736,243
Nov 202162,114115,16977.435.24$5,412,610
Oct 202169,837113,75879.795.71$6,222,293
Sep 202171,323100,89769.865.35$5,522,517
Aug 202191,49196,75566.024.22$6,448,599
Jul 2021115,462100,47970.783.98$8,572,516
Jun 2021141,647116,24769.493.38$10,236,037
May 2021208,653127,35163.483.02$13,629,596
Apr 2021122,89459,15660.362.76$7,581,059
Mar 2021252061.302.72$15,448
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20204,8191,76044.642.68$219,829
Nov 20207,8623,27138.772.71$313,663
Oct 20205,6191,68636.972.48$211,913
Sep 20207,0101,89037.091.99$263,764
Aug 20207,2702,15139.982.39$295,785
Jul 20208,0834,80938.371.83$318,922
Jun 202012,3204,04134.901.69$436,799
May 20201,1081,84016.921.81$22,087
Apr 20209,2635,57214.751.80$146,683
Mar 20207,5063,42930.341.86$234,097
Feb 20209,1097,63349.881.98$469,475
Jan 202010,3549,79157.252.09$613,276
Dec 201911,6809,15459.012.30$710,331
Nov 201911,06311,26255.302.75$642,762
Oct 201913,44311,26253.472.42$746,035
Sep 201915,81811,83655.052.66$902,232
Aug 201921,72112,52453.112.30$1,182,462
Jul 201919,2178,22056.272.46$1,101,562
Jun 20190052.782.49$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                4,297 bbl  × $106.41 =   $457,244
Casinghead gas    43,755 Mcf  × $  3.05 =   $133,271

────────────────────────────────────────────────────
Month total                                 $590,515

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/52637 is the state's own key, not one this site invented.