CWI STATE LONG E

Operated by PERMIAN RESOURCES OPERATING, LLC (P-5 100852) in the PHANTOM (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 52816District 08Field 71052900Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$15.4 M
May 2019 – May 2026
Value, last 12 filed months
$730 k
at the published price for each month
Months reported
85
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7,755 leases and 10,539 wells, and the rule below applies to all of them.

Discovered
1983-06-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2017-08-01.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: FOR THE FOLLOWING API 389-37515.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition193,365 bbl$11,442,634
Casinghead gasProduction1,267,654 Mcf$3,991,713
Total$15,434,347

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.3477, -103.4509. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.34773, -103.45089 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,379 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,379 ft.

Completions filed
May 2019
1 of 1 wells

1 well

42-38938041T 45H10,379 ftMay 2019

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (85)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

85 months

May 2026676,635106.413.05$27,339
Apr 202615310,69898.932.87$45,837
Mar 202615811,10289.753.15$49,146
Feb 20269911,54963.503.75$49,599
Jan 202616912,00559.138.00$106,008
Dec 20251089,21956.664.41$46,806
Nov 202510213,15858.593.93$57,640
Oct 2025626,06359.383.30$23,719
Sep 20251839,35362.743.08$40,260
Aug 202541216,32763.933.01$75,561
Jul 202565318,58366.743.32$105,188
Jun 202561319,71866.483.13$102,444
May 202545219,92260.553.23$91,763
Apr 202549219,06562.363.54$98,231
Mar 202565920,60367.704.27$132,555
Feb 202552118,79470.884.34$118,510
Jan 202547521,09174.324.28$125,544
Dec 202450120,51468.993.12$98,596
Nov 202480822,51769.052.20$105,295
Oct 202499323,00371.372.28$123,349
Sep 202485820,30969.612.36$107,743
Aug 202453623,14875.632.06$88,307
Jul 20241,02326,23779.932.15$138,088
Jun 20241,14622,25778.082.63$148,104
May 202461323,75778.812.20$100,539
Apr 202467714,61984.451.66$81,428
Mar 20248218,06980.301.55$78,394
Feb 20248528,80876.091.78$80,539
Jan 20244605,26873.023.30$50,961
Dec 20239408,96071.262.61$90,376
Nov 20239908,68577.892.81$101,495
Oct 20238439,63485.443.09$101,769
Sep 20239259,30989.042.74$107,822
Aug 20239399,84880.522.67$101,931
Jul 20231,0469,10774.852.64$102,352
Jun 20231,0639,87568.962.26$95,607
May 20231,00110,42270.622.23$93,905
Apr 20231,20510,47378.122.24$117,571
Mar 20231,10810,33172.852.39$105,442
Feb 20231,0329,31675.112.47$100,484
Jan 20231,30010,35276.533.39$134,559
Dec 20221,1078,70576.415.73$134,458
Nov 20221,0448,20885.005.65$135,084
Oct 20221,2809,15887.185.86$165,291
Sep 20221,4497,94284.888.16$187,827
Aug 20221,2887,75594.529.13$192,523
Jul 20221,2409,555101.587.54$198,024
Jun 20221,7386,583115.097.98$252,540
May 20221,5938,342109.378.43$244,575
Apr 20221,5868,581104.226.84$223,966
Mar 20221,6369,079108.885.08$224,216
Feb 20221,5327,84591.054.86$177,606
Jan 20221,5829,07081.844.54$170,628
Dec 20211,6328,45871.323.90$149,373
Nov 20211,6128,64177.435.24$170,069
Oct 20213122,58479.795.71$39,659
Sep 20215782,98569.865.35$56,352
Aug 20212,46820,94266.024.22$251,325
Jul 20212,58021,19270.783.98$267,001
Jun 20212,64320,26569.493.38$252,170
May 20212,88818,70763.483.02$239,782
Apr 20212,47818,80160.362.76$201,433
Mar 20213,00619,83561.302.72$238,158
Feb 20212,14614,06457.805.55$202,065
Jan 20213,02418,43350.412.81$204,242
Dec 20202,79312,32844.642.68$157,663
Nov 2020156038.772.71$6,048
Oct 20201,95113,87536.972.48$106,517
Sep 20202,29614,34437.091.99$113,718
Aug 20202,77213,98839.982.39$144,187
Jul 20203,03714,53338.371.83$143,054
Jun 20203,10012,72334.901.69$129,696
May 20202,89410,66716.921.81$68,324
Apr 20203,19715,47314.751.80$75,075
Mar 20204,79418,14730.341.86$179,135
Feb 20205,05117,89549.881.98$287,388
Jan 20206,63620,65357.252.09$423,174
Dec 20197,31422,61859.012.30$483,719
Nov 20195,75517,45155.302.75$366,254
Oct 20199,43737,00453.472.42$594,092
Sep 201911,75845,44255.052.66$768,030
Aug 201916,47851,42153.112.30$993,639
Jul 201917,98843,78256.272.46$1,119,891
Jun 201916,45830,87752.782.49$945,574
May 20190058.482.74$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                   67 bbl  × $106.41 =     $7,129
Casinghead gas     6,635 Mcf  × $  3.05 =    $20,209

────────────────────────────────────────────────────
Month total                                  $27,339

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/52816 is the state's own key, not one this site invented.