KOMODO DRAGON 30-29

Operated by NOBLE ENERGY INC (P-5 611665) in the HOEFS T-K (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 53139District 08Field 41911500OilCasinghead gasSave
Value, all time
$86.1 M
Oct 2019 – May 2026
Value, last 12 filed months
$6.6 M
at the published price for each month
Months reported
80
no gaps in the span
Streams
2
oil, casinghead gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition1,293,579 bbl$79,903,814
Casinghead gasProduction1,890,317 Mcf$6,167,031
Total$86,070,846

Wells on this lease (4)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.1120, -103.4692. A lease has no coordinate of its own — that point is the mean of its wells, and they span 1.0 miles.

31.11210, -103.46802 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 4 wells
With a plug date
0.0%
0 of 4 wells
Median depth
10,489 ft
4 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
4100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 10,482 and 10,495 ft, median 10,489 ft, over the 4 wells that filed a depth.

Completions filed
Oct 2019 – Mar 2025
4 of 4 wells

4 wells

42-3893872610HL10,482 ftMar 2025
42-389384064HL10,491 ftOct 2019
42-389384076HL10,495 ftOct 2019
42-389384052HL10,486 ftOct 2019

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (80)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

80 months

May 202600106.413.05$0
Apr 202612,56114,88798.932.87$1,285,381
Mar 202614,65315,70289.753.15$1,364,559
Feb 202613,30415,32463.503.75$902,274
Jan 20265,0454,93559.138.00$337,781
Dec 20254,9335,43156.664.41$303,473
Nov 20255,8596,39658.593.93$368,392
Oct 20257,2729,06459.383.30$461,766
Sep 20254,7414,34762.743.08$310,826
Aug 20256,3524,02863.933.01$418,227
Jul 20256,5263,61966.743.32$447,543
Jun 20255,7035,72366.483.13$397,041
May 20258,3938,00460.553.23$534,068
Apr 20257,9626,74062.363.54$520,391
Mar 20257,8215,04767.704.27$551,024
Feb 20256,4846,16570.884.34$486,347
Jan 20257,6239,63474.324.28$607,762
Dec 20248,24510,23768.993.12$600,776
Nov 20248,69011,65469.052.20$625,665
Oct 20247,9419,06271.372.28$587,423
Sep 20249,30111,26369.612.36$674,072
Aug 20249,55511,71275.632.06$746,814
Jul 202410,00310,63179.932.15$822,360
Jun 20247,2676,40878.082.63$584,286
May 20249,9899,54078.812.20$808,206
Apr 202410,48510,08984.451.66$902,198
Mar 202410,55013,38080.301.55$867,839
Feb 20247,97410,25176.091.78$625,026
Jan 20247,8469,14873.023.30$603,082
Dec 202311,20111,53571.262.61$828,298
Nov 202311,13912,00877.892.81$901,330
Oct 20239,28510,50585.443.09$825,742
Sep 20238,6858,93189.042.74$797,739
Aug 20238,8926,41380.522.67$733,125
Jul 202312,31210,41774.852.64$949,073
Jun 20238,4656,36868.962.26$598,128
May 202311,88713,86970.622.23$870,352
Apr 20237,5787,81378.122.24$609,477
Mar 202312,21010,93872.852.39$915,675
Feb 20237,73511,11975.112.47$608,392
Jan 202313,43911,88676.533.39$1,068,753
Dec 202215,14123,37576.415.73$1,290,841
Nov 202214,80121,33085.005.65$1,378,518
Oct 202217,35219,47687.185.86$1,626,950
Sep 202210,25911,99784.888.16$968,724
Aug 202211,01216,99794.529.13$1,195,989
Jul 202215,31421,053101.587.54$1,714,380
Jun 202213,98418,271115.097.98$1,755,170
May 202217,15121,717109.378.43$2,058,945
Apr 202218,63526,464104.226.84$2,123,090
Mar 202216,09519,799108.885.08$1,852,931
Feb 202214,98821,28091.054.86$1,468,054
Jan 202217,48925,89781.844.54$1,548,812
Dec 202120,12536,82671.323.90$1,578,904
Nov 202119,57127,43677.435.24$1,659,061
Oct 202116,77732,39779.795.71$1,523,749
Sep 202114,89422,80869.865.35$1,162,539
Aug 202119,83228,80566.024.22$1,430,883
Jul 202121,54154,16870.783.98$1,740,373
Jun 202125,76639,87869.493.38$1,925,292
May 202126,61342,66563.483.02$1,818,142
Apr 202121,77527,16760.362.76$1,389,277
Mar 202127,43542,85661.302.72$1,798,203
Feb 202123,19332,73357.805.55$1,522,156
Jan 202129,98950,01050.412.81$1,652,287
Dec 202033,81558,99344.642.68$1,667,335
Nov 202035,91358,72638.772.71$1,551,293
Oct 202030,92047,11136.972.48$1,259,874
Sep 202032,64550,10937.091.99$1,310,572
Aug 202042,41568,23939.982.39$1,858,509
Jul 202046,15672,05338.371.83$1,902,511
Jun 202047,69768,98634.901.69$1,781,233
May 202046,40263,51616.921.81$900,388
Apr 202040,89553,10914.751.80$699,030
Mar 202014,52060,52130.341.86$552,878
Feb 202015,95563,25849.881.98$921,129
Jan 202021,25379,97857.252.09$1,384,267
Dec 201922,77927,55859.012.30$1,407,692
Nov 201928,86333,13755.302.75$1,687,274
Oct 201927,71329,39553.472.42$1,552,907

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Oil               12,561 bbl  × $ 98.93 = $1,242,660
Casinghead gas    14,887 Mcf  × $  2.87 =    $42,722

────────────────────────────────────────────────────
Month total                               $1,285,381

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/53139 is the state's own key, not one this site invented.