SCHARBAUER, C. V

Operated by CHEVRON U. S. A. INC. (P-5 148113) in the PARKS (CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 53701District 08Field 69233125Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$11.0 M
Nov 2014 – May 2026
Value, last 12 filed months
$962 k
at the published price for each month
Months reported
75
64 months not filed
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 263 leases and 1,022 wells, and the rule below applies to all of them.

Discovered
2009-03-11
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2013-11-12.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: PLAT OR A P-15, ACRE LIST, AND LEASE PLAT.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition138,422 bbl$9,523,808
Casinghead gasProduction386,481 Mcf$1,512,435
Total$11,036,243

Wells on this lease (8)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.8791, -102.1614. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.8 miles.

31.87920, -102.16143 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
37.5%
3 of 8 wells
With a plug date
37.5%
3 of 8 wells
Median depth
11,265 ft
8 wells filed one
Completion to plug
8.3 years
median over 3 wells

What the state filed about each well

On the RRC proration schedule
337.5%
A plug date is filed
337.5%
BothOn the schedule and plugged. Neither fact cancels the other.
337.5%
NeitherNo plug date, and not on the schedule.
562.5%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Total depth in feet, 8 of 8 wells. Median 11,265 ft, with the middle half between 11,254 and 11,270 ft; the shallowest is 11,250 ft and the deepest 11,277 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.

When they were last completed

Last completion by decade, 8 of 8 wells, Mar 2014 – Oct 2017. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.

Completions filed
Mar 2014 – Oct 2017
8 of 8 wells
Plug dates filed
Sep 2022 – Feb 2026
3 of 8 wells; 5 filed none

Last completion to plug: a median of 8.3 years across the 3 wells that filed both dates, with the middle half between 8.3 years and 8.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

8 wells

42-329390783408M11,265 ftOct 2017Feb 2026Yes
42-329394553403M11,277 ftNov 2014
42-329393793411M11,250 ftNov 2014
42-329393783404M11,274 ftOct 2014
42-329393773412M11,265 ftSep 2014
42-329390773416M11,252 ftJun 2014
42-329390673407M11,268 ftMay 2014Sep 2022Yes
42-329388093415M11,255 ftMar 2014Feb 2023Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (75)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

75 months

May 20265194,834106.413.05$69,950
Apr 20266254,24198.932.87$74,002
Mar 20268674,80389.753.15$92,940
Feb 20266766,00363.503.75$65,439
Jan 20265984,31659.138.00$69,879
Dec 20251,0446,03156.664.41$85,770
Nov 20251,4156,86458.593.93$109,856
Oct 20251,4744,77059.383.30$103,290
Sep 20257953,97162.743.08$62,097
Aug 20259105,37863.933.01$74,390
Jul 20259755,08966.743.32$81,943
Jun 20258325,51066.483.13$72,551
May 20251,0135,02160.553.23$77,567
Apr 20251,5335,64162.363.54$115,585
Mar 20251,8165,72367.704.27$147,371
Feb 20251,3244,85370.884.34$114,911
Jan 20251,2626,04974.324.28$119,674
Dec 20241,6896,21468.993.12$135,920
Nov 20241,7114,44369.052.20$127,912
Oct 20241,6664,89271.372.28$130,063
Sep 20241,7364,81669.612.36$132,230
Aug 20242,0605,94075.632.06$168,056
Jul 20241,1645,54179.932.15$104,933
Jun 20241,1784,97778.082.63$105,088
May 20241,2214,83878.812.20$106,863
Apr 20241,7466,46184.451.66$158,170
Mar 20242,1556,65280.301.55$183,325
Feb 20249672,80176.091.78$78,575
Jan 20241,0102,94873.023.30$83,472
Dec 20231,1453,79571.262.61$91,500
Nov 20231,1573,54877.892.81$100,080
Oct 20231,3924,62585.443.09$133,211
Sep 20231,2993,66689.042.74$125,690
Aug 20231,7003,54680.522.67$146,362
Jul 20231,7225,29774.852.64$142,885
Jun 20231,5225,49468.962.26$117,365
May 20239625,09570.622.23$79,285
Apr 20231,0694,63378.122.24$93,878
Mar 20231,1965,95372.852.39$101,375
Feb 20239336,06275.112.47$85,025
Jan 20231,1695,74576.533.39$108,926
Dec 20222,3145,94476.415.73$210,866
Nov 20222,2577,19885.005.65$232,486
Oct 20222,5225,99987.185.86$255,045
Sep 20221,7837,30284.888.16$210,952
Aug 20221,7646,36494.529.13$224,819
Jul 20221,9576,902101.587.54$250,848
Jun 20222,0886,326115.097.98$290,772
May 20222,3927,483109.378.43$324,717
Apr 20222,2167,153104.226.84$279,861
Mar 20222,2446,242108.885.08$276,014
Feb 20222,7516,46991.054.86$281,910
Jan 20222,2496,33381.844.54$212,795
Dec 20212,3237,95471.323.90$196,690
Nov 20211,8776,63877.435.24$180,098
Oct 20212,7675,70479.795.71$253,371
Sep 20212,5335,62269.865.35$207,038
Aug 20212,3735,71366.024.22$180,778
Jul 20213,5067,62970.783.98$278,534
Jun 20212,5636,18269.493.38$199,002
May 20212,8715,15763.483.02$197,813
Apr 20212,3843,90760.362.76$154,675
Mar 20212,5702,87161.302.72$165,341
Feb 20211,3321,75457.805.55$86,721
Jan 20212,6325,81050.412.81$149,007
Dec 20202,9215,93744.642.68$146,278
Nov 20202,7964,97738.772.71$121,872
Oct 20203,2884,23236.972.48$132,046
Sep 20204,9384,58237.091.99$192,273
Aug 20204,6253,44239.982.39$193,117
Jul 20203,1472,43238.371.83$125,189
Jun 20202,5921,74734.901.69$93,414
Jan 20152,9562,95743.433.10$137,548
Dec 20143,5663,70354.693.59$208,323
Nov 20147873770.464.25$8,629

Not filed, and not zero: Feb 2015 – May 2020 (64 months). The Railroad Commission holds no report for those months, so this page shows none — a zero would state that the lease produced nothing.

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                  519 bbl  × $106.41 =    $55,227
Casinghead gas     4,834 Mcf  × $  3.05 =    $14,724

────────────────────────────────────────────────────
Month total                                  $69,950

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/53701 is the state's own key, not one this site invented.