WADDELL TR 3-D
Operated by BLACKBEARD OPERATING, LLC (P-5 73056) in the DUNE field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.
The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.
These are facts about the field, not about this lease. The field holds 113 leases and 1,569 wells, and the rule below applies to all of them.
A drilling unit in this field needs at least 10 acres.
The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.
The Commission's schedule remark for this field reads: “10 ACRE OPTIONAL 933' DIAGONAL”
What this lease produced, and what it was worth
Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.
| Stream | Basis | Volume | Value |
|---|---|---|---|
| Oil | Disposition | 73,799 bbl | $5,840,260 |
| Casinghead gas | Production | 44,987 Mcf | $193,900 |
| Total | $6,034,160 | ||
Wells on this lease (90)
Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.
These wells centre on 31.5596, -102.4629. A lease has no coordinate of its own — that point is the mean of its wells, and they span 3.2 miles.
What these wells add up to
Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.
What the state filed about each well
A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.
How deep they were drilled
Total depth in feet, 84 of 90 wells. Median 3,550 ft, with the middle half between 3,475 and 3,600 ft; the shallowest is 3,270 ft and the deepest 10,835 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.
When they were last completed
Last completion by decade, 80 of 90 wells, Apr 1952 – Apr 2026. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.
Last completion to plug: a median of 55.3 years across the 17 wells that filed both dates, with the middle half between 27.5 years and 57.1 years. A further 1 well is excluded, because the last completion the Commission holds for it is dated after the plug date. Both dates are the latest of their kind on the wellbore record and they are filed separately, so the two need not run in order. The gap is the distance between two filed dates — it is not a statement of how long the well produced.
90 wells
| 42-10301153 | 296 | 3,600 ft | — | Sep 2025 | Yes |
| 42-10301312 | 468 | 3,270 ft | — | Oct 2023 | Yes |
| 42-10301180 | 323 | — | — | — | — |
| 42-10301211 | 356 | — | — | — | — |
| 42-10301354 | 520 | — | — | — | — |
| 42-10301362 | 528 | — | — | — | — |
| 42-10301516 | 380 | — | — | — | — |
| 42-10301530 | 519 | — | — | — | — |
| 42-10310594 | 907W | 3,630 ft | — | — | — |
| 42-10301154 | 297W | 3,700 ft | Apr 2026 | — | — |
| 42-10301388 | 555W | 3,500 ft | Dec 2025 | — | — |
| 42-10330033 | 1001 | 3,515 ft | Mar 2025 | — | — |
| 42-10301355 | 521W | 3,450 ft | Mar 2025 | — | — |
| 42-10301254 | 410 | 3,600 ft | Jan 2025 | — | — |
| 42-10301614 | 760 | 9,420 ft | Sep 2023 | — | — |
| 42-10301163 | 306W | 3,600 ft | Jun 2018 | — | — |
| 42-10301421 | 589 | 3,540 ft | May 2016 | — | — |
| 42-10301316 | 472 | 3,500 ft | May 2016 | — | — |
| 42-10330254 | 1074 | 3,500 ft | Apr 2016 | — | — |
| 42-10334586 | 1247 | 3,707 ft | Jan 2016 | Sep 2025 | Yes |
| 42-10330112 | 1027 | 3,403 ft | May 2014 | — | — |
| 42-10333082 | 1175 | 9,288 ft | Oct 2013 | Jan 2025 | Yes |
| 42-10311167 | 932 | 3,400 ft | Jun 2013 | — | — |
| 42-10311128 | 929 | 3,400 ft | May 2013 | Aug 2023 | Yes |
| 42-10335990 | 1408H | 3,360 ft | Apr 2013 | Apr 2025 | Yes |
| 42-10301255 | 411 | 3,552 ft | Aug 2009 | — | — |
| 42-10301420 | 588W | 3,560 ft | Nov 2008 | — | — |
| 42-10301303 | 459 | 3,550 ft | Dec 2004 | — | — |
| 42-10301364 | 530 | 3,600 ft | Jan 1998 | Jul 2025 | Yes |
| 42-10334566 | 1230 | 3,709 ft | Oct 1997 | — | — |
| 42-10300909 | 101 | 10,835 ft | Sep 1996 | Sep 1988 | — |
| 42-10301394 | 561 | 3,510 ft | Mar 1996 | — | — |
| 42-10301161 | 304W | 3,625 ft | Apr 1994 | — | — |
| 42-10311171 | 938 | 3,550 ft | Sep 1993 | Sep 2025 | Yes |
| 42-10301512 | 577 | 3,455 ft | Sep 1993 | — | — |
| 42-10330263 | 1079 | 3,550 ft | Sep 1990 | — | — |
| 42-10332388 | 1138 | 3,600 ft | Jan 1990 | — | — |
| 42-10332660 | 1152 | 3,500 ft | Dec 1981 | — | — |
| 42-10332150 | 1116 | 3,560 ft | Feb 1980 | Aug 2025 | Yes |
| 42-10332160 | 1115 | 3,580 ft | Jan 1980 | — | — |
| 42-10301224 | 370 | 6,060 ft | 1974 | — | — |
| 42-10301229 | 376W | 3,585 ft | Sep 1970 | — | — |
| 42-10330275 | 1082 | 3,391 ft | Aug 1970 | Sep 2025 | Yes |
| 42-10330274 | 1081 | 3,450 ft | Aug 1970 | — | — |
| 42-10330208 | 1060 | 3,380 ft | May 1970 | — | — |
| 42-10330171 | 1048 | 3,525 ft | Dec 1969 | — | — |
| 42-10301338 | 495W | 3,475 ft | Oct 1969 | — | — |
| 42-10330107 | 1010 | 3,475 ft | Sep 1969 | Jan 2025 | Yes |
| 42-10301342 | 499W | 3,510 ft | Sep 1969 | — | — |
| 42-10330104 | 990 | 3,430 ft | Aug 1969 | — | — |
| 42-10330092 | 1021 | 3,400 ft | Jul 1969 | — | — |
| 42-10330056 | 1009 | 3,390 ft | Jul 1969 | — | — |
| 42-10301195 | 338W | 3,625 ft | Jun 1969 | — | — |
| 42-10301636 | 785 | 9,311 ft | Nov 1968 | Dec 2025 | Yes |
| 42-10311129 | 930 | 3,395 ft | Mar 1968 | Feb 2025 | Yes |
| 42-10301152 | 295W | 3,600 ft | Nov 1967 | — | — |
| 42-10301513 | 377W | 3,570 ft | Nov 1967 | — | — |
| 42-10301275 | 431W | 3,525 ft | Nov 1967 | — | — |
| 42-10301315 | 471W | 3,550 ft | Nov 1967 | — | — |
| 42-10301276 | 432W | 3,550 ft | Nov 1967 | — | — |
| 42-10301424 | 592W | 3,550 ft | Oct 1967 | Jan 2024 | Yes |
| 42-10301302 | 458W | 3,550 ft | Oct 1967 | Sep 2025 | Yes |
| 42-10301304 | 460W | 3,550 ft | Oct 1967 | — | — |
| 42-10301213 | 359W | 3,625 ft | Oct 1967 | — | — |
| 42-10301515 | 379W | 3,650 ft | Jun 1967 | — | — |
| 42-10301318 | 474W | 3,550 ft | Jan 1967 | — | — |
| 42-10301314 | 470W | 3,600 ft | Dec 1966 | — | — |
| 42-10301268 | 424W | 3,560 ft | Dec 1966 | Oct 2023 | Yes |
| 42-10301324 | 480W | 3,525 ft | Dec 1966 | — | — |
| 42-10301418 | 586W | 3,540 ft | Dec 1966 | — | — |
| 42-10301408 | 574 | 3,550 ft | Aug 1959 | — | — |
| 42-10301407 | 573 | 3,500 ft | Aug 1959 | — | — |
| 42-10301425 | 593 | 3,650 ft | Apr 1959 | — | — |
| 42-10301423 | 591 | 3,550 ft | Apr 1959 | — | — |
| 42-10301427 | 595 | 3,570 ft | Mar 1959 | Apr 2025 | Yes |
| 42-10301416 | 583 | 3,520 ft | Mar 1959 | — | — |
| 42-10301422 | 590 | 3,540 ft | Mar 1959 | Jan 2025 | Yes |
| 42-10301400 | 567 | 3,560 ft | Mar 1959 | — | — |
| 42-10301170 | 313 | 3,385 ft | Mar 1959 | — | — |
| 42-10301398 | 565 | 3,405 ft | Feb 1959 | — | — |
| 42-10301391 | 558 | 3,400 ft | Feb 1959 | — | — |
| 42-10301390 | 557 | 3,400 ft | Feb 1959 | — | — |
| 42-10301392 | 559 | 3,470 ft | Feb 1959 | — | — |
| 42-10301397 | 564 | 3,540 ft | Feb 1959 | Jul 2025 | Yes |
| 42-10301368 | 534 | 3,580 ft | Jan 1959 | — | — |
| 42-10301227 | 374 | 3,550 ft | Dec 1958 | — | — |
| 42-10301363 | 529 | 3,600 ft | Dec 1958 | — | — |
| 42-10301269 | 425 | 3,575 ft | Sep 1958 | — | — |
| 42-10301178 | 321 | 3,650 ft | Feb 1958 | — | — |
| 42-10300963 | 159 | 3,420 ft | Apr 1952 | — | — |
The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.
Every month this lease reported (59)
Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.
59 months
| May 2026 | 1,021 | 645 | 106.41 | 3.05 | $110,609 |
| Apr 2026 | 1,055 | 604 | 98.93 | 2.87 | $106,104 |
| Mar 2026 | 1,104 | 619 | 89.75 | 3.15 | $101,034 |
| Feb 2026 | 1,030 | 555 | 63.50 | 3.75 | $67,486 |
| Jan 2026 | 1,102 | 616 | 59.13 | 8.00 | $70,088 |
| Dec 2025 | 1,360 | 537 | 56.66 | 4.41 | $79,428 |
| Nov 2025 | 1,078 | 524 | 58.59 | 3.93 | $65,217 |
| Oct 2025 | 1,175 | 565 | 59.38 | 3.30 | $71,639 |
| Sep 2025 | 1,159 | 595 | 62.74 | 3.08 | $74,546 |
| Aug 2025 | 1,095 | 609 | 63.93 | 3.01 | $71,839 |
| Jul 2025 | 1,213 | 668 | 66.74 | 3.32 | $83,170 |
| Jun 2025 | 1,164 | 771 | 66.48 | 3.13 | $79,795 |
| May 2025 | 1,283 | 771 | 60.55 | 3.23 | $80,178 |
| Apr 2025 | 1,278 | 829 | 62.36 | 3.54 | $82,633 |
| Mar 2025 | 1,308 | 980 | 67.70 | 4.27 | $92,735 |
| Feb 2025 | 1,148 | 761 | 70.88 | 4.34 | $84,674 |
| Jan 2025 | 947 | 674 | 74.32 | 4.28 | $73,265 |
| Dec 2024 | 1,173 | 694 | 68.99 | 3.12 | $83,092 |
| Nov 2024 | 1,205 | 640 | 69.05 | 2.20 | $84,612 |
| Oct 2024 | 1,359 | 651 | 71.37 | 2.28 | $98,477 |
| Sep 2024 | 1,191 | 618 | 69.61 | 2.36 | $84,367 |
| Aug 2024 | 1,090 | 649 | 75.63 | 2.06 | $83,776 |
| Jul 2024 | 1,355 | 671 | 79.93 | 2.15 | $109,746 |
| Jun 2024 | 1,088 | 624 | 78.08 | 2.63 | $86,595 |
| May 2024 | 1,119 | 629 | 78.81 | 2.20 | $89,571 |
| Apr 2024 | 1,253 | 650 | 84.45 | 1.66 | $106,894 |
| Mar 2024 | 1,221 | 723 | 80.30 | 1.55 | $99,163 |
| Feb 2024 | 1,164 | 628 | 76.09 | 1.78 | $89,689 |
| Jan 2024 | 1,265 | 706 | 73.02 | 3.30 | $94,698 |
| Dec 2023 | 1,342 | 686 | 71.26 | 2.61 | $97,422 |
| Nov 2023 | 1,177 | 597 | 77.89 | 2.81 | $93,353 |
| Oct 2023 | 1,033 | 615 | 85.44 | 3.09 | $90,158 |
| Sep 2023 | 1,094 | 681 | 89.04 | 2.74 | $99,272 |
| Aug 2023 | 1,379 | 649 | 80.52 | 2.67 | $112,772 |
| Jul 2023 | 1,338 | 525 | 74.85 | 2.64 | $101,536 |
| Jun 2023 | 1,241 | 524 | 68.96 | 2.26 | $86,763 |
| May 2023 | 1,368 | 722 | 70.62 | 2.23 | $98,216 |
| Apr 2023 | 1,048 | 701 | 78.12 | 2.24 | $83,438 |
| Mar 2023 | 1,066 | 654 | 72.85 | 2.39 | $79,223 |
| Feb 2023 | 1,059 | 533 | 75.11 | 2.47 | $80,856 |
| Jan 2023 | 1,178 | 695 | 76.53 | 3.39 | $92,507 |
| Dec 2022 | 1,260 | 686 | 76.41 | 5.73 | $100,207 |
| Nov 2022 | 1,130 | 718 | 85.00 | 5.65 | $100,104 |
| Oct 2022 | 1,167 | 477 | 87.18 | 5.86 | $104,536 |
| Sep 2022 | 1,191 | 699 | 84.88 | 8.16 | $106,798 |
| Aug 2022 | 1,617 | 1,173 | 94.52 | 9.13 | $163,545 |
| Jul 2022 | 1,870 | 612 | 101.58 | 7.54 | $194,570 |
| Jun 2022 | 1,641 | 1,200 | 115.09 | 7.98 | $198,435 |
| May 2022 | 1,557 | 1,493 | 109.37 | 8.43 | $182,880 |
| Apr 2022 | 1,843 | 1,393 | 104.22 | 6.84 | $201,602 |
| Mar 2022 | 2,018 | 1,557 | 108.88 | 5.08 | $227,624 |
| Feb 2022 | 2,060 | 1,905 | 91.05 | 4.86 | $196,819 |
| Dec 2021 | 2,322 | 1,351 | 71.32 | 3.90 | $170,873 |
| Nov 2021 | 1,864 | 1,377 | 77.43 | 5.24 | $151,541 |
| Oct 2021 | 1,956 | 2,117 | 79.79 | 5.71 | $168,166 |
| Sep 2021 | 1,977 | 1,441 | 69.86 | 5.35 | $145,824 |
| Aug 2021 | 0 | 0 | 66.02 | 4.22 | $0 |
| Jul 2021 | 0 | 0 | 70.78 | 3.98 | $0 |
| Jun 2021 | 0 | 0 | 69.49 | 3.38 | $0 |
Not filed, and not zero: Jan 2022. The Railroad Commission holds no report for those months, so this page shows none — a zero would state that the lease produced nothing.
How to read this page
The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.
Oil 1,021 bbl × $106.41 = $108,645 Casinghead gas 645 Mcf × $ 3.05 = $1,965 ──────────────────────────────────────────────────── Month total $110,609
The volumes are the state's, unchanged
Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.
The dollars are a multiplication, not a valuation
Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.
Oil and gas are priced differently
Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.
A lease is not a well
The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/59128 is the state's own key, not one this site invented.