MAURICE, J. F.

Operated by VISION NATURAL RESOURCES, LP (P-5 886256) in the COWDEN, SOUTH field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 867District 08Field 21292001Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$921 k
Jan 1993 – May 2026
Value, last 12 filed months
$40 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 102 leases and 1,335 wells, and the rule below applies to all of them.

Discovered
1932-11-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
467 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 10 acres. The field rule took effect on 2005-09-27.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: MAXIMUM 160 ACRES PLUS 16 ACRES TOLERANCE

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition21,357 bbl$910,073
Casinghead gasProduction4,265 Mcf$11,093
Total$921,165

1,508 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.8217, -102.3963. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.3 miles.

31.82169, -102.39632 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
50.0%
1 of 2 wells
With a plug date
50.0%
1 of 2 wells
Median depth
4,514 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
150.0%
A plug date is filed
150.0%
BothOn the schedule and plugged. Neither fact cancels the other.
150.0%
NeitherNo plug date, and not on the schedule.
150.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,514 ft.

Plug dates filed
Sep 1997
1 of 2 wells; 1 filed none

2 wells

42-1350816824,514 ftSep 1997Yes
42-135081671

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 20261767106.413.05$18,749
Apr 20260698.932.87$17
Mar 20260689.753.15$19
Feb 20260763.503.75$26
Jan 20260559.138.00$40
Dec 2025170756.664.41$9,663
Nov 20250658.593.93$24
Oct 20250759.383.30$23
Sep 20250662.743.08$18
Aug 20250763.933.01$21
Jul 20250766.743.32$23
Jun 2025177666.483.13$11,786
May 20250760.553.23$23
Apr 20250862.363.54$28
Mar 20250767.704.27$30
Feb 20250570.884.34$22
Jan 2025174674.324.28$12,957
Dec 20240668.993.12$19
Nov 20241769.052.20$84
Oct 20240671.372.28$14
Sep 20240669.612.36$14
Aug 20240775.632.06$14
Jul 2024157779.932.15$12,564
Jun 20240678.082.63$16
May 20240778.812.20$15
Apr 20240684.451.66$10
Mar 20240780.301.55$11
Feb 2024180776.091.78$13,709
Jan 20241773.023.30$96
Dec 20230671.262.61$16
Nov 20230777.892.81$20
Oct 20230685.443.09$19
Sep 2023174589.042.74$15,507
Aug 20231880.522.67$102
Jul 20230474.852.64$11
Jun 20231768.962.26$85
May 2023311270.622.23$2,216
Apr 20230678.122.24$13
Mar 2023167672.852.39$12,180
Feb 20230475.112.47$10
Jan 20230276.533.39$7
Dec 20220776.415.73$40
Nov 20221185.005.65$91
Oct 202201287.185.86$70
Sep 2022174484.888.16$14,802
Aug 20221394.529.13$122
Jul 202201101.587.54$8
Jun 2022011115.097.98$88
May 2022011109.378.43$93
Apr 20225221104.226.84$5,563
Mar 20221680108.885.08$18,292
Feb 20220891.054.86$39
Jan 20220781.844.54$32
Dec 20210671.323.90$23
Nov 20210777.435.24$37
Oct 2021187779.795.71$14,961
Sep 20210769.865.35$37
Aug 20210666.024.22$25
Jul 20210670.783.98$24
Jun 20210669.493.38$20
May 2021175863.483.02$11,133
Apr 20210560.362.76$14
Mar 202101061.302.72$27
Feb 20210357.805.55$17
Jan 20210950.412.81$25
Dec 2020173444.642.68$7,733
Nov 20200538.772.71$14
Oct 20200636.972.48$15
Sep 20200637.091.99$12
Aug 20200739.982.39$17
Jul 20200738.371.83$13
Jun 2020176534.901.69$6,151
May 20200716.921.81$13
Apr 20200714.751.80$13
Mar 20200730.341.86$13
Feb 20200649.881.98$12
Jan 20200657.252.09$13
Dec 2019174759.012.30$10,284
Nov 20190755.302.75$19
Oct 20190653.472.42$15
Sep 20190755.052.66$19
Aug 20190753.112.30$16
Jul 2019160656.272.46$9,018
Jun 20190852.782.49$20
May 20190658.482.74$16
Apr 20190762.632.75$19
Mar 2019163856.803.06$9,283
Feb 20190650.852.79$17
Jan 20190746.033.23$23
Dec 20180946.594.19$38
Nov 20180652.934.24$25
Oct 2018175761.443.40$10,776
Sep 20180759.543.11$22
Aug 20180859.403.07$25
Jul 20180865.142.93$23
Jun 20180860.183.08$25
May 20181701265.382.90$11,149
Apr 20180063.842.90$0
Mar 20180561.222.79$14
Feb 20180761.782.77$19
Jan 20181761062.874.01$11,105
Dec 20170857.272.92$23
Nov 20170955.423.12$28
Oct 201701049.292.98$30
Sep 2017178847.523.09$8,483
Aug 201701145.373.00$33
Jul 201701243.873.09$37
Jun 201701242.493.09$37
May 2017170945.373.26$7,742
Apr 201701347.933.21$42
Mar 201701046.772.98$30
Feb 2017174750.452.95$8,799
Jan 20170449.413.42$14
Dec 20160548.763.72$19
Nov 201601142.492.64$29
Oct 20161742346.193.09$8,108
Sep 201602441.553.10$74
Aug 20161731341.442.92$7,207
Jul 201602041.622.92$58
Jun 20167445.352.69$328
May 20161561042.521.99$6,653
Apr 20160836.561.99$16
Mar 20160833.011.79$14
Feb 20160826.472.06$17
Jan 20161611527.352.36$4,439
Dec 20150932.362.00$18
Nov 20150838.792.17$17
Oct 20151671043.552.43$7,297
Sep 20150942.992.76$25
Aug 20150840.162.87$23
Jul 20150948.152.95$27
Jun 2015166556.152.88$9,335
May 201501755.212.96$50
Apr 201501049.822.71$27
Mar 2015120742.892.93$5,167
Feb 20150844.662.98$24
Jan 201501043.433.10$31
Dec 2014171854.693.59$9,381
Nov 20140070.464.25$0
Oct 201401178.303.90$43
Sep 20141521086.164.05$13,137
Aug 201401389.394.04$52
Jul 201401096.564.18$42
Jun 2014162998.164.74$15,945
May 201401094.734.73$47
Apr 20140995.944.81$43
Mar 2014135995.895.06$12,991
Feb 20140997.406.19$56
Jan 20140090.404.86$0
Dec 2013123991.824.35$11,333
Nov 20130988.853.74$34
Oct 201301197.423.78$42
Sep 201313710104.113.72$14,300
Aug 2013011104.253.52$39
Jul 201309102.523.72$33
Jun 2013152994.403.93$14,384
May 201301094.834.15$41
Apr 201301093.964.28$43
Mar 20131371293.623.91$12,873
Feb 20130891.233.42$27
Jan 20130991.603.42$31
Dec 20121331186.773.42$11,578
Nov 20120086.953.62$0
Oct 20121541089.383.40$13,799
Sep 201201194.672.92$32
Aug 20120992.662.91$26
Jul 20120085.133.02$0
Jun 2012139979.822.52$11,118
May 20120991.612.49$22
Apr 201215011101.652.00$15,269
Mar 201208105.052.22$18
Feb 201209101.102.57$23
Jan 2012165498.092.73$16,196
Dec 20110996.873.24$29
Nov 20110995.723.31$30
Oct 20110784.983.65$26
Sep 20110883.623.99$32
Aug 20111701183.404.15$14,224
Jul 20110994.144.52$41
Jun 20110792.904.64$32
May 20110698.134.40$26
Apr 20111307105.964.33$13,805
Mar 201101096.364.06$41
Feb 20110785.644.18$29
Jan 20111621086.504.59$14,059
Dec 20100985.734.35$39
Nov 20100780.843.80$27
Oct 20100778.103.51$25
Sep 2010168672.633.98$12,226
Aug 20100873.684.42$35
Jul 20100872.554.74$38
Jun 20100770.364.91$34
May 2010146971.124.24$10,422
Apr 20100881.694.12$33
Mar 20100778.394.39$31
Feb 20100673.585.44$33
Jan 2010157774.365.96$11,716
Dec 20090871.445.48$44
Nov 20090774.593.75$26
Oct 20090072.544.11$0
Sep 20090765.543.06$21
Aug 2009163967.423.22$11,018
Jul 20090861.133.46$28
Jun 20090766.163.90$27
May 20090754.743.93$27
Apr 200901146.773.59$39
Mar 20091791342.144.06$7,596
Feb 20091732.814.63$65
Jan 20090735.865.37$38
Dec 20080637.105.98$36
Nov 2008153555.496.86$8,524
Oct 20080675.246.92$42
Sep 200806101.767.88$47
Aug 200807114.228.48$59
Jul 200806131.0811.39$68
Jun 200806131.3313.03$78
May 20081546123.1711.57$19,038
Apr 200806110.3110.45$63
Mar 200806101.909.66$58
Feb 20080592.538.77$44
Jan 20080790.388.21$57
Dec 2007164488.337.30$14,515
Nov 20070591.677.29$36
Oct 20070682.856.92$42
Sep 20070675.846.24$37
Aug 20070669.066.39$38
Jul 20070670.906.39$38
Jun 20070662.007.55$45
May 2007178558.747.85$10,495
Apr 20070459.617.81$31
Mar 20070556.927.30$37
Feb 20070655.108.22$49
Jan 20070650.306.73$40
Dec 20060556.656.92$35
Nov 20060654.207.62$46
Oct 2006160454.906.01$8,808
Sep 20060660.085.04$30
Aug 20060568.717.34$37
Jul 20060769.376.34$44
Jun 20060566.286.38$32
May 20060666.016.42$39
Apr 2006153564.397.36$9,888
Mar 20060656.707.08$43
Feb 20060657.597.75$47
Jan 20060660.598.93$54
Dec 2005151854.9413.42$8,403
Nov 20050554.6910.59$53
Oct 20050758.3413.80$97
Sep 20050661.4512.08$72
Aug 20050061.519.80$0
Jul 2005165855.697.84$9,252
Jun 20050852.337.38$59
May 20050745.226.65$47
Apr 20050849.207.36$59
Mar 2005166750.377.15$8,412
Feb 20050745.226.31$44
Jan 20050843.166.32$51
Dec 20040939.866.75$61
Nov 20040945.286.33$57
Oct 2004164249.706.52$8,164
Sep 20040843.245.28$42
Aug 20040042.375.55$0
Jul 20040938.286.08$55
Jun 2004164936.106.43$5,978
May 20040937.486.49$58
Apr 20049834.475.86$357
Mar 20040834.365.53$44
Feb 20041821032.455.51$5,961
Jan 20040932.036.30$57
Dec 200301030.266.30$63
Nov 20030528.804.60$23
Oct 2003142228.174.76$4,010
Sep 20030926.314.75$43
Aug 20030929.765.13$46
Jul 200301029.415.17$52
Jun 20031781028.565.98$5,144
May 20030626.595.97$36
Apr 200301026.675.41$54
Mar 20030931.146.10$55
Feb 20031691133.487.93$5,745
Jan 200301030.315.58$56
Dec 200201226.914.85$58
Nov 20021671424.664.14$4,176
Oct 200201526.464.23$63
Sep 200201127.443.64$40
Aug 20020025.963.16$0
Jul 2002158924.583.06$3,911
Jun 20020623.733.34$20
May 20020824.663.58$29
Apr 20020423.653.51$14
Mar 20020722.003.10$22
Feb 20020218.222.38$5
Jan 20020717.172.38$17
Dec 2001171116.932.36$2,897
Nov 20010618.072.41$14
Oct 20010619.782.53$15
Sep 20010724.262.25$16
Aug 20010724.873.05$21
Jul 20010723.933.20$22
Jun 2001164224.563.82$4,035
May 20010625.524.31$26
Apr 20010624.685.34$32
Mar 20010724.545.38$38
Feb 20010627.755.77$35
Jan 2001186627.478.40$5,160
Dec 20000626.889.12$55
Nov 20000732.215.66$40
Oct 20000431.235.15$21
Sep 20000631.875.19$31
Aug 20000729.644.54$32
Jul 2000173928.534.09$4,973
Jun 200001729.304.40$75
May 20000727.263.68$26
Apr 20000624.513.12$19
Mar 2000175728.422.86$4,994
Feb 20000627.622.73$16
Jan 20000625.272.48$15
Dec 19990724.282.42$17
Nov 19990623.192.43$15
Oct 19991721020.982.80$3,637
Sep 19990621.752.62$16
Aug 19990619.262.88$17
Jul 19990817.892.37$19
Jun 19990615.942.36$14
May 19990615.792.32$14
Apr 1999213115.102.21$3,219
Mar 19990712.471.84$13
Feb 1999089.981.82$15
Jan 19990910.381.90$17
Dec 1998099.201.77$16
Nov 1998186910.892.19$2,045
Oct 19980012.421.97$0
Sep 19980612.592.08$13
Aug 19980511.301.91$10
Jul 19980911.742.24$20
Jun 19980911.242.24$20
May 1998185612.622.21$2,348
Apr 199801113.042.51$28
Mar 199801212.802.31$28
Feb 19980613.952.30$14
Jan 19981841014.702.15$2,726
Dec 19970516.322.41$12
Nov 199701318.193.09$40
Oct 19970819.253.15$25
Sep 199701017.742.95$30
Aug 19971821017.862.55$3,276
Jul 199701517.582.25$34
Jun 19971893217.242.26$3,331
May 19971542718.972.31$2,984
Apr 19971822717.882.08$3,310
Mar 199702818.951.94$54
Feb 19971972820.492.21$4,098
Jan 19971823023.483.54$4,380
Dec 19961883223.32$4,384
Nov 199602521.97$0
Oct 19961982923.31$4,615
Sep 19961712522.22$3,800
Aug 19961703120.26$3,444
Jul 19961922719.55$3,754
Jun 199602818.73$0
May 19961962919.43$3,808
Apr 19961772821.51$3,807
Mar 19961983019.38$3,837
Feb 199602916.98$0
Jan 19961893117.07$3,226
Dec 19951843117.19$3,163
Nov 19951932916.00$3,088
Oct 19951953015.43$3,009
Sep 199503016.18$0
Aug 19951962915.92$3,120
Jul 19951793315.24$2,728
Jun 19951833316.41$3,003
May 19951882917.56$3,301
Apr 199501417.73$0
Mar 19953407216.44$5,590
Feb 199502616.58$0
Jan 19951803215.92$2,866
Dec 19941773115.03$2,660
Nov 19941913115.90$3,037
Oct 19941852915.58$2,882
Sep 199404515.29$0
Aug 19941983016.13$3,194
Jul 19941902917.56$3,336
Jun 19941913117.09$3,264
May 19941983015.88$3,144
Apr 199403114.14$0
Mar 19943833412.46$4,772
Feb 199403112.50$0
Jan 19943853912.66$4,874
Dec 199302812.33$0
Nov 19931842614.49$2,666
Oct 19931853715.85$2,932
Sep 199302715.03$0
Aug 19932193215.66$3,430
Jul 19932223315.46$3,432
Jun 199303216.79$0
May 19932223417.68$3,925
Apr 19932233518.05$4,025
Mar 19932243318.14$4,063
Feb 199303117.90$0
Jan 19932243716.93$3,792

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                  176 bbl  × $106.41 =    $18,728
Casinghead gas         7 Mcf  × $  3.05 =        $21

────────────────────────────────────────────────────
Month total                                  $18,749

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/867 is the state's own key, not one this site invented.