DEUSSEN-DUNN UNIT

Operated by J-W OPERATING CO. (P-5 427960) in the MONTEATH (ATOKA, UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 103677District 09Field 62580100NGPA filingCondensateGasSaveExport
Value, all time
$247 k
Jan 1993 – Mar 2010
Value, last 12 filed months
$547
at the published price for each month
Months reported
207
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 32 leases and 32 wells, and the rule below applies to all of them.

Discovered
1980-08-22
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 08/01/2005.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition10 bbl$547
GasProduction128,488 Mcf$246,001
Total$246,549

72,977 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.1849, -97.3731. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.18487, -97.37305 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,550 ft
1 wells filed one
Completion to plug
27.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,550 ft.

Completions filed
Dec 1982
1 of 1 wells
Plug dates filed
Mar 2010
1 of 1 wells

Last completion to plug: a median of 27.3 years across the 1 well that filed both dates, with the middle half between 27.3 years and 27.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1213042116,550 ftDec 1982Mar 2010Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (207)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

207 months

Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 200910054.743.93$547
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 2008043101.767.88$339
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 2008066101.909.66$638
Feb 2008027192.538.77$2,377
Jan 2008021490.388.21$1,756
Dec 2007024088.337.30$1,752
Nov 2007034191.677.29$2,486
Oct 2007042182.856.92$2,914
Sep 2007012775.846.24$793
Aug 2007041869.066.39$2,670
Jul 2007043370.906.39$2,766
Jun 2007038062.007.55$2,868
May 2007032258.747.85$2,527
Apr 2007031159.617.81$2,427
Mar 2007077156.927.30$5,630
Feb 2007028455.108.22$2,333
Jan 2007031750.306.73$2,132
Dec 2006031656.656.92$2,186
Nov 2006033454.207.62$2,544
Oct 2006034654.906.01$2,081
Sep 2006031960.085.04$1,607
Aug 2006040868.717.34$2,995
Jul 2006033869.376.34$2,144
Jun 2006034666.286.38$2,209
May 2006031766.016.42$2,037
Apr 2006027164.397.36$1,995
Mar 2006033756.707.08$2,387
Feb 2006030257.597.75$2,341
Jan 2006035160.598.93$3,136
Dec 2005031154.9413.42$4,172
Nov 2005039054.6910.59$4,129
Oct 2005028658.3413.80$3,946
Sep 2005034861.4512.08$4,203
Aug 2005034261.519.80$3,351
Jul 2005034655.697.84$2,714
Jun 2005029052.337.38$2,141
May 2005027445.226.65$1,822
Apr 2005032549.207.36$2,392
Mar 2005028450.377.15$2,032
Feb 2005024045.226.31$1,515
Jan 2005031343.166.32$1,979
Dec 2004027439.866.75$1,850
Nov 2004019345.286.33$1,222
Oct 2004017649.706.52$1,147
Sep 2004023943.245.28$1,263
Aug 2004023042.375.55$1,277
Jul 2004026038.286.08$1,582
Jun 2004026136.106.43$1,679
May 2004024637.486.49$1,598
Apr 2004030234.475.86$1,769
Mar 2004030034.365.53$1,659
Feb 2004027432.455.51$1,510
Jan 2004021232.036.30$1,336
Dec 2003028230.266.30$1,777
Nov 2003023528.804.60$1,080
Oct 2003028128.174.76$1,337
Sep 2003023526.314.75$1,116
Aug 2003038229.765.13$1,960
Jul 2003031729.415.17$1,639
Jun 2003029328.565.98$1,753
May 2003038026.595.97$2,270
Apr 2003029626.675.41$1,601
Mar 2003035831.146.10$2,182
Feb 2003022233.487.93$1,760
Jan 2003030530.315.58$1,703
Dec 2002032526.914.85$1,577
Nov 2002031024.664.14$1,282
Oct 200207626.464.23$321
Sep 200207727.443.64$280
Aug 2002022425.963.16$709
Jul 2002028124.583.06$860
Jun 2002021923.733.34$731
May 2002016024.663.58$573
Apr 2002023823.653.51$836
Mar 2002035122.003.10$1,089
Feb 2002031318.222.38$744
Jan 2002030817.172.38$732
Dec 2001033816.932.36$799
Nov 2001032818.072.41$789
Oct 2001027619.782.53$698
Sep 2001035824.262.25$806
Aug 2001041424.873.05$1,264
Jul 2001036923.933.20$1,180
Jun 2001036924.563.82$1,411
May 2001040825.524.31$1,757
Apr 2001041724.685.34$2,225
Mar 2001042024.545.38$2,258
Feb 2001041427.755.77$2,388
Jan 2001044627.478.40$3,746
Dec 2000033126.889.12$3,020
Nov 2000080332.215.66$4,543
Oct 200001,19531.235.15$6,149
Sep 2000050331.875.19$2,609
Aug 2000027929.644.54$1,267
Jul 2000024428.534.09$998
Jun 2000023529.304.40$1,033
May 2000039027.263.68$1,435
Apr 2000019424.513.12$605
Mar 2000032728.422.86$935
Feb 2000039727.622.73$1,082
Jan 2000045025.272.48$1,116
Dec 1999050524.282.42$1,224
Nov 1999022923.192.43$557
Oct 199907420.982.80$207
Sep 1999031821.752.62$833
Aug 1999011119.262.88$319
Jul 199904717.892.37$112
Jun 199902315.942.36$54
May 1999027015.792.32$627
Apr 1999059015.102.21$1,303
Mar 1999058312.471.84$1,072
Feb 199904979.981.82$903
Jan 1999038110.381.90$724
Dec 199803789.201.77$670
Nov 1998047410.892.19$1,036
Oct 1998016312.421.97$321
Sep 1998039712.592.08$827
Aug 199801,42611.301.91$2,720
Jul 1998058511.742.24$1,309
Jun 1998049311.242.24$1,103
May 1998065112.622.21$1,436
Apr 1998079713.042.51$1,997
Mar 199801,18012.802.31$2,725
Feb 1998088413.952.30$2,032
Jan 1998084414.702.15$1,819
Dec 1997098316.322.41$2,370
Nov 1997093918.193.09$2,900
Oct 1997090119.253.15$2,838
Sep 1997087517.742.95$2,586
Aug 1997094517.862.55$2,414
Jul 1997090517.582.25$2,033
Jun 1997068617.242.26$1,548
May 199701,17218.972.31$2,706
Apr 199701,00317.882.08$2,089
Mar 199701,09718.951.94$2,127
Feb 1997094120.492.21$2,076
Jan 199701,13123.483.54$4,003
Dec 1996080023.32$0
Nov 199601,09221.97$0
Oct 199601,23623.31$0
Sep 199601,18022.22$0
Aug 1996079620.26$0
Jul 1996087119.55$0
Jun 1996071118.73$0
May 199601,37219.43$0
Apr 1996092221.51$0
Mar 199601,34719.38$0
Feb 199601,27616.98$0
Jan 199601,15117.07$0
Dec 199501,26817.19$0
Nov 199501,22616.00$0
Oct 199501,52715.43$0
Sep 199501,49916.18$0
Aug 199501,57015.92$0
Jul 199501,48515.24$0
Jun 199501,56416.41$0
May 199501,68417.56$0
Apr 199501,57417.73$0
Mar 199501,52416.44$0
Feb 199501,50516.58$0
Jan 199501,74315.92$0
Dec 199401,76615.03$0
Nov 199401,70315.90$0
Oct 199401,78615.58$0
Sep 199401,82115.29$0
Aug 199402,00016.13$0
Jul 199402,05317.56$0
Jun 199402,07717.09$0
May 199401,92715.88$0
Apr 199402,01014.14$0
Mar 199401,34512.46$0
Feb 199401,24412.50$0
Jan 199401,45212.66$0
Dec 199301,47912.33$0
Nov 199301,24914.49$0
Oct 199301,45015.85$0
Sep 199301,70915.03$0
Aug 199301,79915.66$0
Jul 199301,85815.46$0
Jun 199301,66116.79$0
May 199301,96817.68$0
Apr 199301,97218.05$0
Mar 199301,92818.14$0
Feb 199301,73217.90$0
Jan 199302,06516.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2009 — as filed, then multipliedworked
Condensate            10 bbl  × $ 54.74 =       $547
Gas                    0 Mcf  × $  3.93 =         $0

────────────────────────────────────────────────────
Month total                                     $547

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/103677 is the state's own key, not one this site invented.