DAVIS "A"

Operated by WELLS OILFIELD SERVICES, INC. (P-5 907973) in the DAVIS (CADDO) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 107611District 09Field 23381150CondensateGasSaveExport
Value, all time
$81 k
Jan 1993 – Apr 2001
Value, last 12 filed months
$0
at the published price for each month
Months reported
100
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1 leases and 1 wells, and the rule below applies to all of them.

Discovered
1983-04-22
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,408 bbl$56,994
GasProduction29,395 Mcf$24,127
Total$81,121

19,566 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.0146, -98.7757. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.01462, -98.77572 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,675 ft
1 wells filed one
Completion to plug
18.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,675 ft.

Completions filed
Apr 1983
1 of 1 wells
Plug dates filed
Apr 2001
1 of 1 wells

Last completion to plug: a median of 18.0 years across the 1 well that filed both dates, with the middle half between 18.0 years and 18.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-5033458914,675 ftApr 1983Apr 2001Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (100)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

100 months

Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 200004628.422.86$132
Feb 200005127.622.73$139
Jan 200004925.272.48$122
Dec 199904924.282.42$119
Nov 199905523.192.43$134
Oct 1999011120.982.80$311
Sep 199906921.752.62$181
Aug 199908919.262.88$256
Jul 1999019717.892.37$467
Jun 1999023015.942.36$543
May 1999021715.792.32$504
Apr 199921629315.102.21$3,909
Mar 1999022512.471.84$414
Feb 199903309.981.82$600
Jan 199909910.381.90$188
Dec 19980819.201.77$144
Nov 1998026410.892.19$577
Oct 1998030412.421.97$599
Sep 199817821512.592.08$2,689
Aug 1998018411.301.91$351
Jul 199809811.742.24$219
Jun 1998011911.242.24$266
May 1998031112.622.21$686
Apr 1998031113.042.51$779
Mar 1998037512.802.31$866
Feb 199820330913.952.30$3,542
Jan 1998011614.702.15$250
Dec 1997011516.322.41$277
Nov 1997071118.193.09$2,196
Oct 199718165519.253.15$5,547
Sep 1997068117.742.95$2,012
Aug 199734366017.862.55$7,812
Jul 1997058717.582.25$1,319
Jun 1997036917.242.26$833
May 1997029418.972.31$679
Apr 199718429117.882.08$3,896
Mar 1997017918.951.94$347
Feb 1997020720.492.21$457
Jan 19978028323.483.54$2,880
Dec 1996029823.32$0
Nov 19967535621.97$1,648
Oct 1996041823.31$0
Sep 1996031922.22$0
Aug 199616643320.26$3,363
Jul 1996031019.55$0
Jun 1996014518.73$0
May 1996021319.43$0
Apr 1996012321.51$0
Mar 199617925119.38$3,469
Feb 1996046216.98$0
Jan 1996076317.07$0
Dec 1995065517.19$0
Nov 19959082616.00$1,440
Oct 1995079415.43$0
Sep 19953976916.18$631
Aug 19953878215.92$605
Jul 19953559615.24$533
Jun 19954553616.41$738
May 19954673317.56$808
Apr 19953759617.73$656
Mar 19954454316.44$723
Feb 19956444016.58$1,061
Jan 19956845415.92$1,083
Dec 1994041015.03$0
Nov 19944737215.90$747
Oct 19943732515.58$576
Sep 19944638315.29$703
Aug 19945539316.13$887
Jul 19943723217.56$650
Jun 19947439117.09$1,265
May 1994034315.88$0
Apr 19944435114.14$622
Mar 19945038712.46$623
Feb 19949833812.50$1,225
Jan 19941331912.66$165
Dec 1993040012.33$0
Nov 199313931914.49$2,014
Oct 1993033815.85$0
Sep 1993033615.03$0
Aug 199318933715.66$2,960
Jul 1993026015.46$0
Jun 1993021116.79$0
May 19937329417.68$1,291
Apr 19938320518.05$1,498
Mar 1993029718.14$0
Feb 1993030217.90$0
Jan 199311220816.93$1,896

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2000 — as filed, then multipliedworked
Condensate             0 bbl  × $ 28.42 =         $0
Gas                   46 Mcf  × $  2.86 =       $132

────────────────────────────────────────────────────
Month total                                     $132

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/107611 is the state's own key, not one this site invented.