LANN

Operated by GO OIL CORP. (P-5 ) in the PEARL MOSLEY (CONGL., UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 107849District 09Field 00000000CondensateGasSaveExport
Value, all time
$407 k
Jan 1993 – Feb 2015
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
266
no gaps in the span
Streams
2
condensate, gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition773 bbl$18,415
GasProduction149,070 Mcf$388,678
Total$407,092

62,783 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.1721, -98.2194. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.17212, -98.21937 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,175 ft
1 wells filed one
Completion to plug
31.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,175 ft.

Completions filed
Oct 1983
1 of 1 wells
Plug dates filed
Dec 2014
1 of 1 wells

Last completion to plug: a median of 31.2 years across the 1 well that filed both dates, with the middle half between 31.2 years and 31.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2373485715,175 ftOct 1983Dec 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (266)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

266 months

Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 2014101054.693.59$5,524
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 2013010294.834.15$423
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 201301791.233.42$58
Jan 201301191.603.42$38
Dec 201201186.773.42$38
Nov 20120686.953.62$22
Oct 201201489.383.40$48
Sep 20120494.672.92$12
Aug 20120292.662.91$6
Jul 201201685.133.02$48
Jun 201201379.822.52$33
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 2012026105.052.22$58
Feb 20120127101.102.57$326
Jan 2012014598.092.73$396
Dec 2011017096.873.24$551
Nov 2011014095.723.31$464
Oct 2011019184.983.65$697
Sep 2011019983.623.99$793
Aug 2011031783.404.15$1,315
Jul 2011032794.144.52$1,477
Jun 2011018892.904.64$872
May 2011020498.134.40$899
Apr 20110251105.964.33$1,088
Mar 2011031096.364.06$1,258
Feb 2011026785.644.18$1,116
Jan 2011029786.504.59$1,363
Dec 2010032685.734.35$1,417
Nov 2010038780.843.80$1,469
Oct 2010038678.103.51$1,354
Sep 2010032572.633.98$1,293
Aug 2010047773.684.42$2,108
Jul 2010029072.554.74$1,374
Jun 2010027470.364.91$1,345
May 2010026371.124.24$1,114
Apr 2010019881.694.12$816
Mar 2010024478.394.39$1,071
Feb 201001673.585.44$87
Jan 201001974.365.96$113
Dec 2009010771.445.48$587
Nov 2009022274.593.75$833
Oct 2009028872.544.11$1,184
Sep 2009016965.543.06$518
Aug 2009028167.423.22$904
Jul 2009023861.133.46$825
Jun 2009026966.163.90$1,048
May 2009031554.743.93$1,237
Apr 2009011746.773.59$420
Mar 2009015442.144.06$625
Feb 2009018332.814.63$848
Jan 2009034135.865.37$1,832
Dec 2008030137.105.98$1,799
Nov 2008030155.496.86$2,065
Oct 2008038075.246.92$2,630
Sep 20080261101.767.88$2,056
Aug 20080317114.228.48$2,689
Jul 20080163131.0811.39$1,856
Jun 20080204131.3313.03$2,659
May 20080198123.1711.57$2,292
Apr 20080213110.3110.45$2,227
Mar 20080227101.909.66$2,194
Feb 2008027292.538.77$2,386
Jan 2008020590.388.21$1,682
Dec 2007025588.337.30$1,862
Nov 2007029891.677.29$2,173
Oct 2007026182.856.92$1,807
Sep 2007037675.846.24$2,348
Aug 2007027169.066.39$1,731
Jul 2007032270.906.39$2,057
Jun 2007035662.007.55$2,687
May 2007037458.747.85$2,935
Apr 2007039759.617.81$3,099
Mar 2007032056.927.30$2,337
Feb 2007047155.108.22$3,870
Jan 2007040050.306.73$2,691
Dec 200608756.656.92$602
Nov 2006014054.207.62$1,066
Oct 2006030054.906.01$1,804
Sep 2006025360.085.04$1,274
Aug 2006024668.717.34$1,806
Jul 2006036569.376.34$2,315
Jun 2006036766.286.38$2,343
May 2006051966.016.42$3,335
Apr 2006029964.397.36$2,201
Mar 2006045056.707.08$3,187
Feb 2006038257.597.75$2,961
Jan 2006042560.598.93$3,797
Dec 2005041554.9413.42$5,567
Nov 2005040254.6910.59$4,257
Oct 2005043858.3413.80$6,043
Sep 2005032761.4512.08$3,950
Aug 2005044961.519.80$4,399
Jul 2005030255.697.84$2,369
Jun 2005039152.337.38$2,886
May 2005022845.226.65$1,516
Apr 2005035749.207.36$2,628
Mar 2005047550.377.15$3,399
Feb 2005036845.226.31$2,323
Jan 2005035343.166.32$2,232
Dec 2004068039.866.75$4,591
Nov 2004022945.286.33$1,450
Oct 2004032949.706.52$2,143
Sep 2004030543.245.28$1,612
Aug 2004044042.375.55$2,442
Jul 2004050138.286.08$3,048
Jun 2004052136.106.43$3,352
May 2004056237.486.49$3,650
Apr 2004047134.475.86$2,759
Mar 2004051334.365.53$2,837
Feb 2004061632.455.51$3,394
Jan 2004055532.036.30$3,496
Dec 2003088730.266.30$5,590
Nov 2003067628.804.60$3,106
Oct 2003054128.174.76$2,575
Sep 2003053926.314.75$2,560
Aug 2003054129.765.13$2,775
Jul 2003060729.415.17$3,139
Jun 2003061628.565.98$3,686
May 2003057726.595.97$3,446
Apr 2003035326.675.41$1,909
Mar 200311472731.146.10$7,982
Feb 2003059533.487.93$4,716
Jan 2003062130.315.58$3,466
Dec 2002066126.914.85$3,208
Nov 2002066124.664.14$2,735
Oct 2002054926.464.23$2,322
Sep 2002058727.443.64$2,134
Aug 2002068825.963.16$2,177
Jul 2002065424.583.06$2,002
Jun 2002054323.733.34$1,813
May 2002063324.663.58$2,269
Apr 2002052123.653.51$1,830
Mar 2002075522.003.10$2,343
Feb 2002066218.222.38$1,573
Jan 2002064317.172.38$1,528
Dec 2001060616.932.36$1,433
Nov 2001069718.072.41$1,677
Oct 2001050119.782.53$1,267
Sep 2001058824.262.25$1,324
Aug 2001064024.873.05$1,954
Jul 2001069623.933.20$2,225
Jun 2001067724.563.82$2,589
May 2001048025.524.31$2,068
Apr 2001062324.685.34$3,324
Mar 2001060724.545.38$3,264
Feb 2001061627.755.77$3,553
Jan 2001056627.478.40$4,754
Dec 2000064526.889.12$5,884
Nov 2000060432.215.66$3,417
Oct 2000067031.235.15$3,447
Sep 2000061431.875.19$3,185
Aug 2000062229.644.54$2,824
Jul 2000066028.534.09$2,699
Jun 2000066229.304.40$2,911
May 2000072627.263.68$2,672
Apr 2000053324.513.12$1,661
Mar 2000065728.422.86$1,879
Feb 2000063327.622.73$1,726
Jan 2000068925.272.48$1,709
Dec 1999066824.282.42$1,619
Nov 1999062523.192.43$1,521
Oct 1999049520.982.80$1,388
Sep 1999061221.752.62$1,603
Aug 1999069519.262.88$1,999
Jul 1999060817.892.37$1,442
Jun 1999065115.942.36$1,538
May 1999076615.792.32$1,778
Apr 1999067715.102.21$1,495
Mar 1999060612.471.84$1,114
Feb 199907549.981.82$1,371
Jan 1999058210.381.90$1,106
Dec 199806569.201.77$1,163
Nov 1998070910.892.19$1,550
Oct 1998082412.421.97$1,623
Sep 1998065012.592.08$1,354
Aug 1998078511.301.91$1,497
Jul 1998079111.742.24$1,770
Jun 1998076711.242.24$1,716
May 1998083412.622.21$1,840
Apr 1998083713.042.51$2,097
Mar 1998075512.802.31$1,744
Feb 1998070913.952.30$1,630
Jan 1998069714.702.15$1,502
Dec 1997074816.322.41$1,804
Nov 1997077918.193.09$2,406
Oct 1997074419.253.15$2,343
Sep 199711871717.742.95$4,212
Aug 1997081817.862.55$2,090
Jul 1997086717.582.25$1,948
Jun 1997081017.242.26$1,828
May 1997080218.972.31$1,851
Apr 1997077917.882.08$1,622
Mar 1997080818.951.94$1,567
Feb 1997071120.492.21$1,568
Jan 1997065523.483.54$2,319
Dec 1996069223.32$0
Nov 1996065721.97$0
Oct 1996078423.31$0
Sep 1996070422.22$0
Aug 1996077420.26$0
Jul 1996082719.55$0
Jun 1996082818.73$0
May 1996079819.43$0
Apr 1996077121.51$0
Mar 1996087819.38$0
Feb 1996078616.98$0
Jan 1996071617.07$0
Dec 1995072217.19$0
Nov 1995088516.00$0
Oct 199501,00115.43$0
Sep 1995092216.18$0
Aug 1995098415.92$0
Jul 19951371,04215.24$2,088
Jun 199501,02016.41$0
May 199501,13917.56$0
Apr 199501,09817.73$0
Mar 1995097916.44$0
Feb 199501,02016.58$0
Jan 199501,09815.92$0
Dec 199401,14715.03$0
Nov 199401,22015.90$0
Oct 199401,28315.58$0
Sep 199401,24215.29$0
Aug 199401,30716.13$0
Jul 199401,46817.56$0
Jun 199401,46317.09$0
May 19941491,64115.88$2,366
Apr 199401,62914.14$0
Mar 199401,36712.46$0
Feb 199401,27112.50$0
Jan 199401,61212.66$0
Dec 199301,49612.33$0
Nov 199301,79314.49$0
Oct 199301,73415.85$0
Sep 199301,75815.03$0
Aug 1993083915.66$0
Jul 199301,00515.46$0
Jun 199301,54616.79$0
May 199303,01417.68$0
Apr 199302,96918.05$0
Mar 19931542,91318.14$2,794
Feb 199302,65417.90$0
Jan 199303,28716.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2014 — as filed, then multipliedworked
Condensate           101 bbl  × $ 54.69 =     $5,524
Gas                    0 Mcf  × $  3.59 =         $0

────────────────────────────────────────────────────
Month total                                   $5,524

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/107849 is the state's own key, not one this site invented.