Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the BOONSVILLE (BEND CONGL., GAS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 120713District 09Field 105745202 tax incentive programmesCondensateGasSaveExport
Value, all time
$705 k
Jan 1993 – May 2026
Value, last 12 filed months
$11 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3,438 leases and 3,443 wells, and the rule below applies to all of them.

Discovered
1945-05-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1991-06-10.

The Commission's schedule remark for this field reads: AMOUNT HAD BEEN CALCULATED FOR 5/1/97.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112002-05-22147818
NGPA2none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition563 bbl$13,581
GasProduction219,439 Mcf$691,583
Total$705,164

58,896 Mcf of this lease's gas, across 45 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.0560, -97.7310. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.05601, -97.73104 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,224 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,224 ft.

Completions filed
Jan 1986
1 of 1 wells

1 well

42-4973311036,224 ftJan 1986

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 20260270106.413.05$822
Apr 2026026698.932.87$763
Mar 2026026389.753.15$828
Feb 2026026963.503.75$1,009
Jan 2026025059.138.00$1,999
Dec 2025029756.664.41$1,311
Nov 2025028858.593.93$1,131
Oct 2025029359.383.30$968
Sep 2025024762.743.08$760
Aug 2025016563.933.01$497
Jul 2025017866.743.32$590
Jun 2025022166.483.13$691
May 2025026260.553.23$847
Apr 2025025962.363.54$918
Mar 2025027867.704.27$1,187
Feb 2025024170.884.34$1,046
Jan 2025027874.324.28$1,189
Dec 2024026368.993.12$821
Nov 2024025869.052.20$567
Oct 2024026671.372.28$607
Sep 2024019669.612.36$463
Aug 2024011675.632.06$239
Jul 2024019279.932.15$412
Jun 2024016078.082.63$421
May 202404078.812.20$88
Apr 20240884.451.66$13
Mar 2024012980.301.55$199
Feb 2024016076.091.78$285
Jan 2024020273.023.30$666
Dec 2023028571.262.61$744
Nov 2023035577.892.81$997
Oct 2023035585.443.09$1,096
Sep 2023034689.042.74$946
Aug 2023035280.522.67$941
Jul 2023035574.852.64$938
Jun 2023033968.962.26$766
May 2023030970.622.23$688
Apr 2023033478.122.24$747
Mar 2023033872.852.39$809
Feb 2023030475.112.47$750
Jan 2023032876.533.39$1,111
Dec 2022051476.415.73$2,945
Nov 2022039985.005.65$2,253
Oct 2022088687.185.86$5,195
Sep 2022033284.888.16$2,710
Aug 2022024494.529.13$2,227
Jul 20220199101.587.54$1,501
Jun 20220274115.097.98$2,186
May 20220353109.378.43$2,977
Apr 20220238104.226.84$1,627
Mar 20220335108.885.08$1,701
Feb 2022039791.054.86$1,929
Jan 2022026981.844.54$1,221
Dec 2021040271.323.90$1,567
Nov 2021034777.435.24$1,817
Oct 2021033179.795.71$1,891
Sep 2021031569.865.35$1,686
Aug 2021037766.024.22$1,591
Jul 2021044970.783.98$1,788
Jun 2021040469.493.38$1,366
May 2021036563.483.02$1,101
Apr 2021035360.362.76$974
Mar 2021041861.302.72$1,136
Feb 2021031057.805.55$1,720
Jan 2021032750.412.81$919
Dec 2020041544.642.68$1,110
Nov 2020035338.772.71$955
Oct 2020034436.972.48$853
Sep 2020041937.091.99$834
Aug 2020044039.982.39$1,049
Jul 2020039338.371.83$717
Jun 2020036534.901.69$617
May 2020042016.921.81$762
Apr 2020035014.751.80$632
Mar 2020037930.341.86$704
Feb 2020033549.881.98$664
Jan 2020041557.252.09$869
Dec 2019043559.012.30$1,002
Nov 2019045355.302.75$1,246
Oct 2019056753.472.42$1,371
Sep 2019032855.052.66$872
Aug 2019046653.112.30$1,074
Jul 2019047156.272.46$1,159
Jun 2019039452.782.49$982
May 2019030758.482.74$841
Apr 2019030962.632.75$850
Mar 2019028456.803.06$870
Feb 2019022850.852.79$637
Jan 2019023246.033.23$749
Dec 2018024846.594.19$1,038
Nov 2018020052.934.24$847
Oct 2018020761.443.40$703
Sep 2018019959.543.11$618
Aug 2018020059.403.07$613
Jul 2018020365.142.93$595
Jun 2018019760.183.08$606
May 2018023365.382.90$676
Apr 2018012663.842.90$366
Mar 2018020661.222.79$574
Feb 2018018061.782.77$498
Jan 2018021862.874.01$874
Dec 2017020757.272.92$605
Nov 2017025555.423.12$795
Oct 2017025749.292.98$767
Sep 2017022647.523.09$698
Aug 2017022245.373.00$667
Jul 2017025543.873.09$787
Jun 2017027442.493.09$846
May 2017023745.373.26$773
Apr 2017021347.933.21$684
Mar 2017024946.772.98$743
Feb 2017026150.452.95$771
Jan 2017031049.413.42$1,060
Dec 2016035148.763.72$1,307
Nov 2016037442.492.64$989
Oct 2016038046.193.09$1,174
Sep 2016036941.553.10$1,144
Aug 2016038041.442.92$1,111
Jul 2016040841.622.92$1,193
Jun 2016041945.352.69$1,125
May 2016048742.521.99$970
Apr 2016049336.561.99$982
Mar 2016043633.011.79$782
Feb 2016038226.472.06$788
Jan 2016041127.352.36$972
Dec 2015042832.362.00$857
Nov 2015050238.792.17$1,088
Oct 2015043343.552.43$1,051
Sep 2015048442.992.76$1,335
Aug 2015049740.162.87$1,428
Jul 2015046048.152.95$1,355
Jun 2015043356.152.88$1,248
May 2015042355.212.96$1,250
Apr 2015035949.822.71$972
Mar 2015032642.892.93$957
Feb 2015025444.662.98$756
Jan 2015021443.433.10$664
Dec 2014018354.693.59$657
Nov 2014021970.464.25$931
Oct 2014023078.303.90$897
Sep 2014021886.164.05$882
Aug 2014023689.394.04$952
Jul 2014021496.564.18$894
Jun 2014019898.164.74$938
May 2014018894.734.73$889
Apr 2014017695.944.81$846
Mar 2014015395.895.06$774
Feb 2014011997.406.19$737
Jan 2014013290.404.86$642
Dec 2013015291.824.35$662
Nov 2013023888.853.74$890
Oct 2013019397.423.78$729
Sep 20130206104.113.72$766
Aug 20130265104.253.52$933
Jul 20130119102.523.72$442
Jun 2013022094.403.93$865
May 2013017294.834.15$714
Apr 2013016393.964.28$698
Mar 2013016893.623.91$657
Feb 2013014591.233.42$496
Jan 2013015191.603.42$516
Dec 2012016986.773.42$578
Nov 2012020986.953.62$758
Oct 2012018289.383.40$619
Sep 2012021594.672.92$627
Aug 2012011692.662.91$337
Jul 2012016685.133.02$501
Jun 2012021279.822.52$534
May 2012030191.612.49$749
Apr 20120422101.652.00$843
Mar 20120435105.052.22$967
Feb 20120417101.102.57$1,072
Jan 2012045298.092.73$1,236
Dec 2011029696.873.24$959
Nov 2011038395.723.31$1,268
Oct 2011049684.983.65$1,810
Sep 2011020483.623.99$813
Aug 2011043183.404.15$1,788
Jul 2011043894.144.52$1,979
Jun 2011041692.904.64$1,930
May 2011044698.134.40$1,965
Apr 20110380105.964.33$1,647
Mar 2011043296.364.06$1,753
Feb 2011040885.644.18$1,705
Jan 2011033186.504.59$1,519
Dec 2010036685.734.35$1,591
Nov 2010037980.843.80$1,438
Oct 2010039678.103.51$1,390
Sep 2010040872.633.98$1,624
Aug 2010040673.684.42$1,794
Jul 2010038272.554.74$1,809
Jun 2010039270.364.91$1,925
May 2010039171.124.24$1,656
Apr 2010037581.694.12$1,546
Mar 2010041978.394.39$1,839
Feb 2010039273.585.44$2,133
Jan 2010036974.365.96$2,201
Dec 2009039471.445.48$2,161
Nov 2009037574.593.75$1,407
Oct 2009041072.544.11$1,685
Sep 2009042065.543.06$1,287
Aug 2009042667.423.22$1,371
Jul 2009042661.133.46$1,476
Jun 2009041466.163.90$1,613
May 2009046054.743.93$1,806
Apr 2009043446.773.59$1,557
Mar 2009044442.144.06$1,802
Feb 2009037432.814.63$1,733
Jan 2009038835.865.37$2,084
Dec 2008042737.105.98$2,552
Nov 2008039255.496.86$2,689
Oct 2008050675.246.92$3,503
Sep 20081418101.767.88$3,394
Aug 20081473114.228.48$4,127
Jul 20082452131.0811.39$5,410
Jun 20087410131.3313.03$6,263
May 200816438123.1711.57$7,040
Apr 200825423110.3110.45$7,180
Mar 20080420101.909.66$4,059
Feb 2008039092.538.77$3,421
Jan 2008042890.388.21$3,512
Dec 2007044688.337.30$3,257
Nov 2007048991.677.29$3,566
Oct 2007056082.856.92$3,876
Sep 2007044675.846.24$2,785
Aug 2007047669.066.39$3,041
Jul 2007048570.906.39$3,098
Jun 2007045562.007.55$3,435
May 2007044658.747.85$3,499
Apr 2007046359.617.81$3,614
Mar 2007043556.927.30$3,176
Feb 2007043655.108.22$3,582
Jan 2007043550.306.73$2,926
Dec 2006046356.656.92$3,203
Nov 2006043854.207.62$3,336
Oct 2006046954.906.01$2,820
Sep 2006044060.085.04$2,216
Aug 2006047768.717.34$3,501
Jul 2006047569.376.34$3,013
Jun 2006044366.286.38$2,828
May 2006045166.016.42$2,898
Apr 2006044964.397.36$3,305
Mar 2006046956.707.08$3,322
Feb 2006042957.597.75$3,325
Jan 2006054460.598.93$4,860
Dec 2005078254.9413.42$10,491
Nov 2005078154.6910.59$8,270
Oct 2005073158.3413.80$10,085
Sep 2005037761.4512.08$4,554
Aug 2005051461.519.80$5,036
Jul 2005058555.697.84$4,589
Jun 2005053652.337.38$3,956
May 2005064745.226.65$4,303
Apr 200501,05949.207.36$7,795
Mar 2005077550.377.15$5,545
Feb 2005058745.226.31$3,705
Jan 2005062943.166.32$3,977
Dec 2004063239.866.75$4,267
Nov 2004058245.286.33$3,684
Oct 2004071749.706.52$4,671
Sep 2004068443.245.28$3,614
Aug 2004062142.375.55$3,447
Jul 2004052338.286.08$3,182
Jun 2004058936.106.43$3,789
May 2004081037.486.49$5,261
Apr 2004071934.475.86$4,212
Mar 2004075434.365.53$4,170
Feb 2004069232.455.51$3,813
Jan 2004066732.036.30$4,202
Dec 2003060830.266.30$3,831
Nov 2003073828.804.60$3,391
Oct 2003058428.174.76$2,780
Sep 2003052626.314.75$2,498
Aug 2003070529.765.13$3,616
Jul 2003077829.415.17$4,023
Jun 2003075828.565.98$4,535
May 2003067926.595.97$4,055
Apr 2003070726.675.41$3,823
Mar 2003084131.146.10$5,127
Feb 2003073633.487.93$5,833
Jan 2003070530.315.58$3,935
Dec 2002082426.914.85$4,000
Nov 2002091324.664.14$3,777
Oct 2002065226.464.23$2,757
Sep 2002064127.443.64$2,330
Aug 2002063625.963.16$2,012
Jul 2002063124.583.06$1,932
Jun 2002065923.733.34$2,200
May 2002078024.663.58$2,796
Apr 2002072923.653.51$2,560
Mar 2002078722.003.10$2,442
Feb 2002082018.222.38$1,948
Jan 2002034117.172.38$810
Dec 2001057616.932.36$1,362
Nov 2001060918.072.41$1,465
Oct 2001056319.782.53$1,424
Sep 2001061124.262.25$1,376
Aug 2001064624.873.05$1,972
Jul 2001066623.933.20$2,129
Jun 2001074424.563.82$2,845
May 2001069925.524.31$3,011
Apr 2001070624.685.34$3,767
Mar 2001065424.545.38$3,516
Feb 2001062527.755.77$3,604
Jan 2001060527.478.40$5,081
Dec 2000073726.889.12$6,723
Nov 2000039432.215.66$2,229
Oct 2000075331.235.15$3,875
Sep 2000067231.875.19$3,485
Aug 2000068729.644.54$3,120
Jul 2000079628.534.09$3,255
Jun 2000068329.304.40$3,003
May 2000066527.263.68$2,447
Apr 2000080224.513.12$2,499
Mar 2000056828.422.86$1,624
Feb 2000039027.622.73$1,063
Jan 2000048625.272.48$1,206
Dec 1999058824.282.42$1,425
Nov 1999060723.192.43$1,477
Oct 1999062520.982.80$1,752
Sep 1999063521.752.62$1,663
Aug 1999370419.262.88$2,082
Jul 1999073117.892.37$1,734
Jun 1999072115.942.36$1,703
May 1999077315.792.32$1,794
Apr 1999070315.102.21$1,552
Mar 1999083212.471.84$1,529
Feb 199901,1029.981.82$2,003
Jan 199913767510.381.90$2,705
Dec 199807659.201.77$1,357
Nov 199801,04110.892.19$2,275
Oct 1998096512.421.97$1,900
Sep 1998062612.592.08$1,304
Aug 199801,07111.301.91$2,043
Jul 1998082611.742.24$1,848
Jun 1998082111.242.24$1,837
May 1998057612.622.21$1,271
Apr 1998064913.042.51$1,626
Mar 199801,03512.802.31$2,390
Feb 1998090013.952.30$2,069
Jan 199801,05914.702.15$2,282
Dec 199701,10616.322.41$2,667
Nov 199701,16018.193.09$3,582
Oct 199701,13519.253.15$3,575
Sep 199701,35417.742.95$4,001
Aug 199701,53317.862.55$3,916
Jul 1997063717.582.25$1,431
Jun 1997061017.242.26$1,377
May 1997082618.972.31$1,907
Apr 1997095017.882.08$1,979
Mar 1997056318.951.94$1,092
Feb 1997084520.492.21$1,864
Jan 1997099423.483.54$3,518
Dec 1996091223.32$0
Nov 199641,21721.97$88
Oct 199601,14423.31$0
Sep 1996088322.22$0
Aug 199601,00420.26$0
Jul 1996082019.55$0
Jun 199601,04618.73$0
May 1996019319.43$0
Apr 1996062921.51$0
Mar 199601,42919.38$0
Feb 199601,06816.98$0
Jan 199610852917.07$1,844
Dec 199501,51217.19$0
Nov 199501,73216.00$0
Oct 1995040315.43$0
Sep 1995097516.18$0
Aug 199501,47415.92$0
Jul 199501,25215.24$0
Jun 199572,12816.41$115
May 1995012617.56$0
Apr 199511,52617.73$18
Mar 199501,42516.44$0
Feb 199501,59216.58$0
Jan 199501,23115.92$0
Dec 1994052815.03$0
Nov 1994088915.90$0
Oct 1994020615.58$0
Sep 199421,21315.29$31
Aug 199401,71716.13$0
Jul 199401,67917.56$0
Jun 1994095417.09$0
May 199401,97515.88$0
Apr 199401,50514.14$0
Mar 199402,27412.46$0
Feb 199402,02112.50$0
Jan 1994671,56112.66$848
Dec 199302,85912.33$0
Nov 1993201,73314.49$290
Oct 1993092615.85$0
Sep 19930015.03$0
Aug 19930015.66$0
Jul 19930015.46$0
Jun 1993015216.79$0
May 199302,81017.68$0
Apr 1993044618.05$0
Mar 199301,71218.14$0
Feb 199302,48917.90$0
Jan 19931622,99716.93$2,743

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  270 Mcf  × $  3.05 =       $822

────────────────────────────────────────────────────
Month total                                     $822

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/120713 is the state's own key, not one this site invented.