PHILLIPS, MARY

Operated by HILL, R.M. OPERATING INC. (P-5 387991) in the BAYEX (CONGL.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 128264District 09Field 06317333GasSaveExport
Value, all time
$40 k
Jan 1993 – Jun 2002
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
114
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 9 leases and 11 wells, and the rule below applies to all of them.

Discovered
1960-01-13
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 11/01/88.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction48,029 Mcf$40,351
Total$40,351

33,389 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.9703, -98.4445. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.97028, -98.44448 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,777 ft
1 wells filed one
Completion to plug
12.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,777 ft.

Completions filed
Jun 2002
1 of 1 wells
Plug dates filed
Mar 2015
1 of 1 wells

Last completion to plug: a median of 12.8 years across the 1 well that filed both dates, with the middle half between 12.8 years and 12.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-503398351A4,777 ftJun 2002Mar 2015Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (114)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

114 months

Jun 2002023.733.34$0
May 200219624.663.58$702
Apr 2002023.653.51$0
Mar 2002022.003.10$0
Feb 2002018.222.38$0
Jan 2002617.172.38$14
Dec 2001916.932.36$21
Nov 20012318.072.41$55
Oct 20013219.782.53$81
Sep 20012124.262.25$47
Aug 20017424.873.05$226
Jul 200131623.933.20$1,010
Jun 200142724.563.82$1,633
May 200147125.524.31$2,029
Apr 200117424.685.34$928
Mar 20017524.545.38$403
Feb 20011027.755.77$58
Jan 20014527.478.40$378
Dec 20006326.889.12$575
Nov 20007232.215.66$407
Oct 200010531.235.15$540
Sep 20008531.875.19$441
Aug 20005529.644.54$250
Jul 20009828.534.09$401
Jun 20008829.304.40$387
May 200012127.263.68$445
Apr 200012624.513.12$393
Mar 200013128.422.86$375
Feb 200014527.622.73$395
Jan 200015125.272.48$375
Dec 199917824.282.42$431
Nov 199918723.192.43$455
Oct 199920620.982.80$578
Sep 199921521.752.62$563
Aug 199923619.262.88$679
Jul 199926817.892.37$636
Jun 199925715.942.36$607
May 199919815.792.32$460
Apr 199933115.102.21$731
Mar 199946212.471.84$849
Feb 1999839.981.82$151
Jan 199912910.381.90$245
Dec 19981439.201.77$254
Nov 199814610.892.19$319
Oct 199818812.421.97$370
Sep 199817212.592.08$358
Aug 199819811.301.91$378
Jul 199821411.742.24$479
Jun 199821211.242.24$474
May 199821812.622.21$481
Apr 199822313.042.51$559
Mar 199833912.802.31$783
Feb 199840013.952.30$920
Jan 199852114.702.15$1,123
Dec 199755016.322.41$1,326
Nov 199750018.193.09$1,544
Oct 199742419.253.15$1,336
Sep 199741617.742.95$1,229
Aug 199750017.862.55$1,277
Jul 199752017.582.25$1,168
Jun 199741317.242.26$932
May 199743018.972.31$993
Apr 199747017.882.08$979
Mar 199750218.951.94$973
Feb 199748920.492.21$1,079
Jan 199758323.483.54$2,064
Dec 199653423.32$0
Nov 199654221.97$0
Oct 199662023.31$0
Sep 199647722.22$0
Aug 199666120.26$0
Jul 199660219.55$0
Jun 199654918.73$0
May 199670519.43$0
Apr 199659021.51$0
Mar 199666519.38$0
Feb 199636216.98$0
Jan 199633717.07$0
Dec 199533517.19$0
Nov 199546416.00$0
Oct 199536815.43$0
Sep 199540416.18$0
Aug 199553815.92$0
Jul 199555615.24$0
Jun 199568216.41$0
May 199566717.56$0
Apr 199566817.73$0
Mar 199571616.44$0
Feb 199565416.58$0
Jan 199563015.92$0
Dec 199467015.03$0
Nov 199471815.90$0
Oct 199468715.58$0
Sep 199461515.29$0
Aug 199481316.13$0
Jul 199473517.56$0
Jun 199488317.09$0
May 199479815.88$0
Apr 199480014.14$0
Mar 199499012.46$0
Feb 199460712.50$0
Jan 199464812.66$0
Dec 19931,00712.33$0
Nov 199381214.49$0
Oct 199389715.85$0
Sep 199385415.03$0
Aug 19931,05715.66$0
Jul 19931,00515.46$0
Jun 199391016.79$0
May 199373717.68$0
Apr 19931,01218.05$0
Mar 199389218.14$0
Feb 199393017.90$0
Jan 199398616.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2002 — as filed, then multipliedworked
Gas                  196 Mcf  × $  3.58 =       $702

────────────────────────────────────────────────────
Month total                                     $702

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/128264 is the state's own key, not one this site invented.