STOVALL FEE "N"

Operated by STOVALL OPERATING CO. (P-5 824339) in the YOUNG COUNTY REGULAR field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 129679District 09Field 99480001CondensateGasSaveExport
Value, all time
$18 k
Jan 1993 – Mar 2024
Value, last 12 filed months
$0
at the published price for each month
Months reported
375
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,525 leases and 8,014 wells, and the rule below applies to all of them.

Discovered
1917-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition262 bbl$3,458
GasProduction8,219 Mcf$14,831
Total$18,290

4,206 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.9629, -98.5142. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.96291, -98.51422 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,215 ft
1 wells filed one
Completion to plug
42.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,215 ft.

Completions filed
May 1981
1 of 1 wells
Plug dates filed
Mar 2024
1 of 1 wells

Last completion to plug: a median of 42.8 years across the 1 well that filed both dates, with the middle half between 42.8 years and 42.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-5033488634,215 ftMay 1981Mar 2024Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (375)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

375 months

Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220485.005.65$23
Oct 20220287.185.86$12
Sep 20220184.888.16$8
Aug 20220094.529.13$0
Jul 202202101.587.54$15
Jun 202201115.097.98$8
May 202222109.378.43$236
Apr 202200104.226.84$0
Mar 2022013108.885.08$66
Feb 20220291.054.86$10
Jan 20220281.844.54$9
Dec 20210271.323.90$8
Nov 202101977.435.24$100
Oct 202102279.795.71$126
Sep 202101169.865.35$59
Aug 20210866.024.22$34
Jul 20210770.783.98$28
Jun 202101169.493.38$37
May 202101763.483.02$51
Apr 202102560.362.76$69
Mar 202102861.302.72$76
Feb 202101757.805.55$94
Jan 202103150.412.81$87
Dec 202003044.642.68$80
Nov 20200538.772.71$14
Oct 20200536.972.48$12
Sep 20200337.091.99$6
Aug 20200139.982.39$2
Jul 20200638.371.83$11
Jun 202001134.901.69$19
May 202002116.921.81$38
Apr 202001014.751.80$18
Mar 202001030.341.86$19
Feb 20200849.881.98$16
Jan 202001557.252.09$31
Dec 201901259.012.30$28
Nov 20190555.302.75$14
Oct 201902753.472.42$65
Sep 201902655.052.66$69
Aug 201902453.112.30$55
Jul 201902356.272.46$57
Jun 201901452.782.49$35
May 201902458.482.74$66
Apr 201902562.632.75$69
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190146.033.23$3
Dec 20180146.594.19$4
Nov 20180352.934.24$13
Oct 20180861.443.40$27
Sep 20180559.543.11$16
Aug 20180259.403.07$6
Jul 20180165.142.93$3
Jun 20180160.183.08$3
May 20180165.382.90$3
Apr 20180163.842.90$3
Mar 20180061.222.79$0
Feb 20180261.782.77$6
Jan 20180162.874.01$4
Dec 20170157.272.92$3
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170345.373.00$9
Jul 20170043.873.09$0
Jun 20170142.493.09$3
May 20170245.373.26$7
Apr 20170147.933.21$3
Mar 20170046.772.98$0
Feb 20170450.452.95$12
Jan 20170849.413.42$27
Dec 20160148.763.72$4
Nov 201601042.492.64$26
Oct 201601246.193.09$37
Sep 201601641.553.10$50
Aug 201602241.442.92$64
Jul 20160841.622.92$23
Jun 20160245.352.69$5
May 20160642.521.99$12
Apr 20160636.561.99$12
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 201601127.352.36$26
Dec 20150432.362.00$8
Nov 201502538.792.17$54
Oct 201502043.552.43$49
Sep 20150242.992.76$6
Aug 20150040.162.87$0
Jul 20150748.152.95$21
Jun 20150356.152.88$9
May 201501755.212.96$50
Apr 201501549.822.71$41
Mar 201501042.892.93$29
Feb 201501744.662.98$51
Jan 201501743.433.10$53
Dec 201401154.693.59$40
Nov 20140970.464.25$38
Oct 201401678.303.90$62
Sep 201401486.164.05$57
Aug 201401389.394.04$52
Jul 201401796.564.18$71
Jun 201401498.164.74$66
May 201401094.734.73$47
Apr 201401395.944.81$63
Mar 201402495.895.06$121
Feb 201402597.406.19$155
Jan 201401290.404.86$58
Dec 201301391.824.35$57
Nov 201301488.853.74$52
Oct 201301397.423.78$49
Sep 2013012104.113.72$45
Aug 201308104.253.52$28
Jul 2013010102.523.72$37
Jun 201301994.403.93$75
May 201301694.834.15$66
Apr 20130993.964.28$39
Mar 201303193.623.91$121
Feb 20130991.233.42$31
Jan 201301591.603.42$51
Dec 201201686.773.42$55
Nov 201201386.953.62$47
Oct 201202489.383.40$82
Sep 20120894.672.92$23
Aug 20120792.662.91$20
Jul 201201085.133.02$30
Jun 20120079.822.52$0
May 201202291.612.49$55
Apr 2012014101.652.00$28
Mar 2012020105.052.22$44
Feb 2012012101.102.57$31
Jan 20120598.092.73$14
Dec 201101896.873.24$58
Nov 201101395.723.31$43
Oct 201101584.983.65$55
Sep 20110983.623.99$36
Aug 201101083.404.15$41
Jul 201101294.144.52$54
Jun 20110892.904.64$37
May 201101098.134.40$44
Apr 2011022105.964.33$95
Mar 201101596.364.06$61
Feb 20110385.644.18$13
Jan 20110786.504.59$32
Dec 201001585.734.35$65
Nov 20100080.843.80$0
Oct 20100178.103.51$4
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100672.554.74$28
Jun 201001670.364.91$79
May 201001671.124.24$68
Apr 201001781.694.12$70
Mar 201001378.394.39$57
Feb 201002573.585.44$136
Jan 201001574.365.96$89
Dec 200903571.445.48$192
Nov 200902174.593.75$79
Oct 200903372.544.11$136
Sep 200902665.543.06$80
Aug 200903467.423.22$109
Jul 200902461.133.46$83
Jun 20090466.163.90$16
May 200901054.743.93$39
Apr 200901146.773.59$39
Mar 200903042.144.06$122
Feb 200901132.814.63$51
Jan 20090635.865.37$32
Dec 20080337.105.98$18
Nov 20080255.496.86$14
Oct 20080175.246.92$7
Sep 2008014101.767.88$110
Aug 2008014114.228.48$119
Jul 2008010131.0811.39$114
Jun 2008012131.3313.03$156
May 2008015123.1711.57$174
Apr 2008022110.3110.45$230
Mar 2008017101.909.66$164
Feb 200801692.538.77$140
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070191.677.29$7
Oct 20070182.856.92$7
Sep 20070275.846.24$12
Aug 20070069.066.39$0
Jul 20070270.906.39$13
Jun 20070462.007.55$30
May 20070358.747.85$24
Apr 20070559.617.81$39
Mar 20070256.927.30$15
Feb 20070255.108.22$16
Jan 20070050.306.73$0
Dec 20060256.656.92$14
Nov 20060154.207.62$8
Oct 20060154.906.01$6
Sep 20060060.085.04$0
Aug 20060268.717.34$15
Jul 200601469.376.34$89
Jun 20060366.286.38$19
May 20060366.016.42$19
Apr 20060264.397.36$15
Mar 20060356.707.08$21
Feb 20060157.597.75$8
Jan 20060460.598.93$36
Dec 20050054.9413.42$0
Nov 20050154.6910.59$11
Oct 20050258.3413.80$28
Sep 200501961.4512.08$230
Aug 20050161.519.80$10
Jul 20050155.697.84$8
Jun 20050152.337.38$7
May 20050145.226.65$7
Apr 20050049.207.36$0
Mar 20050150.377.15$7
Feb 20050045.226.31$0
Jan 20050143.166.32$6
Dec 20040239.866.75$14
Nov 20040245.286.33$13
Oct 20040149.706.52$7
Sep 20040443.245.28$21
Aug 200401242.375.55$67
Jul 20040238.286.08$12
Jun 20040436.106.43$26
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040734.365.53$39
Feb 20040132.455.51$6
Jan 20040132.036.30$6
Dec 20030830.266.30$50
Nov 20030828.804.60$37
Oct 20030428.174.76$19
Sep 20030026.314.75$0
Aug 20030629.765.13$31
Jul 20030629.415.17$31
Jun 200301028.565.98$60
May 200304526.595.97$269
Apr 200303926.675.41$211
Mar 200301731.146.10$104
Feb 20030633.487.93$48
Jan 20030530.315.58$28
Dec 20020826.914.85$39
Nov 20020924.664.14$37
Oct 20020726.464.23$30
Sep 20020727.443.64$25
Aug 20020725.963.16$22
Jul 20020824.583.06$24
Jun 20020923.733.34$30
May 20020824.663.58$29
Apr 20020923.653.51$32
Mar 200201122.003.10$34
Feb 20020718.222.38$17
Jan 20020617.172.38$14
Dec 20010916.932.36$21
Nov 200101218.072.41$29
Oct 200101419.782.53$35
Sep 200101324.262.25$29
Aug 200101524.873.05$46
Jul 200101523.933.20$48
Jun 200103624.563.82$138
May 20010825.524.31$34
Apr 20010824.685.34$43
Mar 200101224.545.38$65
Feb 200101227.755.77$69
Jan 200101327.478.40$109
Dec 200001926.889.12$173
Nov 200004932.215.66$277
Oct 200005431.235.15$278
Sep 200002731.875.19$140
Aug 200002829.644.54$127
Jul 200002128.534.09$86
Jun 200001829.304.40$79
May 200001227.263.68$44
Apr 200001524.513.12$47
Mar 200001528.422.86$43
Feb 200001727.622.73$46
Jan 200001625.272.48$40
Dec 199902224.282.42$53
Nov 199902723.192.43$66
Oct 199903020.982.80$84
Sep 199903821.752.62$100
Aug 199904419.262.88$127
Jul 199904317.892.37$102
Jun 199903915.942.36$92
May 199903915.792.32$91
Apr 199904815.102.21$106
Mar 199904212.471.84$77
Feb 19990459.981.82$82
Jan 199905710.381.90$108
Dec 19980189.201.77$32
Nov 199801910.892.19$42
Oct 199801312.421.97$26
Sep 199801012.592.08$21
Aug 199801411.301.91$27
Jul 199802411.742.24$54
Jun 199802611.242.24$58
May 199802812.622.21$62
Apr 199802413.042.51$60
Mar 199802212.802.31$51
Feb 199802213.952.30$51
Jan 199802314.702.15$50
Dec 199701816.322.41$43
Nov 199702318.193.09$71
Oct 199703819.253.15$120
Sep 199705617.742.95$165
Aug 199706717.862.55$171
Jul 1997020217.582.25$454
Jun 199702417.242.26$54
May 199701418.972.31$32
Apr 199702217.882.08$46
Mar 199705318.951.94$103
Feb 19970320.492.21$7
Jan 19970123.483.54$4
Dec 199601823.32$0
Nov 19960921.97$0
Oct 199602223.31$0
Sep 199604222.22$0
Aug 199604520.26$0
Jul 199607419.55$0
Jun 199606018.73$0
May 199607519.43$0
Apr 199601821.51$0
Mar 19960119.38$0
Feb 199601416.98$0
Jan 199603517.07$0
Dec 19950017.19$0
Nov 199502016.00$0
Oct 199502815.43$0
Sep 199501216.18$0
Aug 199502715.92$0
Jul 199506215.24$0
Jun 199507916.41$0
May 1995011517.56$0
Apr 1995012017.73$0
Mar 1995032516.44$0
Feb 1995026516.58$0
Jan 1995011015.92$0
Dec 1994012515.03$0
Nov 199409515.90$0
Oct 1994010215.58$0
Sep 1994010715.29$0
Aug 1994013016.13$0
Jul 1994011617.56$0
Jun 199409517.09$0
May 199408615.88$0
Apr 199408214.14$0
Mar 19942608012.46$3,240
Feb 199407512.50$0
Jan 1994011212.66$0
Dec 1993011812.33$0
Nov 1993017314.49$0
Oct 1993018415.85$0
Sep 1993014015.03$0
Aug 1993012215.66$0
Jul 1993010015.46$0
Jun 199308316.79$0
May 199308517.68$0
Apr 199308618.05$0
Mar 199309318.14$0
Feb 199309117.90$0
Jan 1993015016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2022 — as filed, then multipliedworked
Condensate             0 bbl  × $ 85.00 =         $0
Gas                    4 Mcf  × $  5.65 =        $23

────────────────────────────────────────────────────
Month total                                      $23

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/129679 is the state's own key, not one this site invented.