Operated by J-W OPERATING CO. (P-5 427960) in the MONTEATH (ATOKA, UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 132124District 09Field 62580100NGPA filingCondensateGasSaveExport
Value, all time
$375 k
Jan 1993 – Nov 2010
Value, last 12 filed months
$0
at the published price for each month
Months reported
215
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 32 leases and 32 wells, and the rule below applies to all of them.

Discovered
1980-08-22
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 08/01/2005.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition8 bbl$438
GasProduction148,730 Mcf$374,978
Total$375,416

72,094 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.1819, -97.3671. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.18191, -97.36705 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,520 ft
1 wells filed one
Completion to plug
21.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,520 ft.

Completions filed
Aug 1989
1 of 1 wells
Plug dates filed
Nov 2010
1 of 1 wells

Last completion to plug: a median of 21.3 years across the 1 well that filed both dates, with the middle half between 21.3 years and 21.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1213051626,520 ftAug 1989Nov 2010Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (215)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

215 months

Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20098054.743.93$438
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 2008020131.3313.03$261
May 20080112123.1711.57$1,296
Apr 20080560110.3110.45$5,855
Mar 20080509101.909.66$4,919
Feb 2008046192.538.77$4,043
Jan 2008051890.388.21$4,251
Dec 2007041988.337.30$3,060
Nov 2007037391.677.29$2,720
Oct 2007066482.856.92$4,596
Sep 2007034375.846.24$2,142
Aug 2007069069.066.39$4,408
Jul 2007052970.906.39$3,379
Jun 2007053162.007.55$4,008
May 2007064058.747.85$5,022
Apr 2007061959.617.81$4,831
Mar 2007062356.927.30$4,549
Feb 2007049555.108.22$4,067
Jan 2007056450.306.73$3,794
Dec 2006048856.656.92$3,376
Nov 2006050254.207.62$3,824
Oct 2006055754.906.01$3,350
Sep 2006047960.085.04$2,413
Aug 2006050968.717.34$3,736
Jul 2006051069.376.34$3,235
Jun 2006052366.286.38$3,339
May 2006062666.016.42$4,022
Apr 2006056964.397.36$4,188
Mar 2006059456.707.08$4,207
Feb 2006050657.597.75$3,922
Jan 2006054760.598.93$4,887
Dec 2005055254.9413.42$7,405
Nov 2005068254.6910.59$7,221
Oct 2005039958.3413.80$5,505
Sep 2005062061.4512.08$7,489
Aug 2005065161.519.80$6,378
Jul 2005061755.697.84$4,840
Jun 2005065152.337.38$4,805
May 2005045945.226.65$3,053
Apr 2005062949.207.36$4,630
Mar 2005055750.377.15$3,985
Feb 2005047345.226.31$2,986
Jan 2005053543.166.32$3,382
Dec 2004061139.866.75$4,125
Nov 2004053845.286.33$3,406
Oct 2004040149.706.52$2,613
Sep 2004052043.245.28$2,748
Aug 2004045542.375.55$2,526
Jul 2004046438.286.08$2,823
Jun 2004046236.106.43$2,972
May 2004043337.486.49$2,812
Apr 2004062534.475.86$3,662
Mar 2004073734.365.53$4,076
Feb 2004043132.455.51$2,375
Jan 2004058732.036.30$3,698
Dec 2003059230.266.30$3,731
Nov 2003051428.804.60$2,362
Oct 2003049428.174.76$2,351
Sep 2003049326.314.75$2,341
Aug 2003060229.765.13$3,088
Jul 2003066029.415.17$3,413
Jun 2003052328.565.98$3,129
May 2003063426.595.97$3,787
Apr 2003054526.675.41$2,947
Mar 2003059731.146.10$3,639
Feb 2003048333.487.93$3,828
Jan 2003050930.315.58$2,841
Dec 2002030426.914.85$1,476
Nov 200203324.664.14$137
Oct 2002042926.464.23$1,814
Sep 2002011727.443.64$425
Aug 2002033525.963.16$1,060
Jul 2002035824.583.06$1,096
Jun 2002033623.733.34$1,122
May 2002033624.663.58$1,204
Apr 2002054223.653.51$1,904
Mar 2002052122.003.10$1,617
Feb 2002051318.222.38$1,219
Jan 2002056717.172.38$1,347
Dec 2001047416.932.36$1,121
Nov 2001054418.072.41$1,309
Oct 2001034819.782.53$880
Sep 2001048424.262.25$1,090
Aug 2001035824.873.05$1,093
Jul 2001013823.933.20$441
Jun 2001037924.563.82$1,449
May 2001048825.524.31$2,102
Apr 2001051724.685.34$2,758
Mar 2001058124.545.38$3,124
Feb 2001048327.755.77$2,786
Jan 2001061127.478.40$5,132
Dec 2000042426.889.12$3,868
Nov 2000067732.215.66$3,830
Oct 2000052231.235.15$2,686
Sep 2000061731.875.19$3,200
Aug 2000058929.644.54$2,675
Jul 2000042728.534.09$1,746
Jun 2000057129.304.40$2,511
May 2000056927.263.68$2,094
Apr 2000050424.513.12$1,570
Mar 2000062228.422.86$1,779
Feb 2000075527.622.73$2,059
Jan 2000089425.272.48$2,218
Dec 1999082824.282.42$2,007
Nov 1999071723.192.43$1,745
Oct 1999075820.982.80$2,125
Sep 1999075621.752.62$1,980
Aug 1999055019.262.88$1,582
Jul 1999064217.892.37$1,523
Jun 1999054515.942.36$1,287
May 1999064315.792.32$1,492
Apr 1999063615.102.21$1,404
Mar 1999056712.471.84$1,042
Feb 199904819.981.82$874
Jan 1999070510.381.90$1,339
Dec 199806919.201.77$1,225
Nov 1998073610.892.19$1,609
Oct 1998072512.421.97$1,428
Sep 1998064612.592.08$1,345
Aug 1998067611.301.91$1,289
Jul 1998072011.742.24$1,611
Jun 1998073911.242.24$1,653
May 1998069212.622.21$1,527
Apr 1998069313.042.51$1,736
Mar 1998098012.802.31$2,263
Feb 1998058313.952.30$1,340
Jan 1998063314.702.15$1,364
Dec 1997071616.322.41$1,726
Nov 1997066218.193.09$2,044
Oct 1997066919.253.15$2,107
Sep 1997068317.742.95$2,018
Aug 1997075317.862.55$1,924
Jul 1997070017.582.25$1,573
Jun 1997071917.242.26$1,623
May 1997079918.972.31$1,844
Apr 1997069817.882.08$1,454
Mar 1997078118.951.94$1,514
Feb 1997072320.492.21$1,595
Jan 1997060923.483.54$2,156
Dec 1996082623.32$0
Nov 1996087121.97$0
Oct 1996076323.31$0
Sep 1996068722.22$0
Aug 1996061820.26$0
Jul 1996040419.55$0
Jun 1996056918.73$0
May 199602,35819.43$0
Apr 199602,38321.51$0
Mar 199602,31319.38$0
Feb 199602,21216.98$0
Jan 199602,03117.07$0
Dec 199502,18417.19$0
Nov 199502,16616.00$0
Oct 199502,34415.43$0
Sep 199502,13716.18$0
Aug 199501,55215.92$0
Jul 1995095215.24$0
Jun 1995097016.41$0
May 1995099117.56$0
Apr 199501,04617.73$0
Mar 199501,04716.44$0
Feb 1995097516.58$0
Jan 199501,07315.92$0
Dec 199401,12015.03$0
Nov 199401,08615.90$0
Oct 199401,16415.58$0
Sep 199401,12415.29$0
Aug 199401,15216.13$0
Jul 199401,27417.56$0
Jun 199402,11817.09$0
May 199402,05615.88$0
Apr 199402,15414.14$0
Mar 199401,47512.46$0
Feb 199401,36212.50$0
Jan 199401,61712.66$0
Dec 199301,64612.33$0
Nov 199301,70514.49$0
Oct 199302,04515.85$0
Sep 199301,55815.03$0
Aug 199301,62015.66$0
Jul 199301,77515.46$0
Jun 199301,77516.79$0
May 199301,87317.68$0
Apr 199301,73818.05$0
Mar 199301,73718.14$0
Feb 199301,62717.90$0
Jan 199301,82116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2009 — as filed, then multipliedworked
Condensate             8 bbl  × $ 54.74 =       $438
Gas                    0 Mcf  × $  3.93 =         $0

────────────────────────────────────────────────────
Month total                                     $438

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/132124 is the state's own key, not one this site invented.