Operated by MCCUTCHIN PETROLEUM CORPORATION (P-5 544550) in the SUNSET (CONGLOMERATE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 155670District 09Field 87223375CondensateGasSaveExport
Value, all time
$116 k
Sep 1995 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
369
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 54 leases and 66 wells, and the rule below applies to all of them.

Discovered
1963-11-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: DGL 1000 MCF

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition178 bbl$10,554
GasProduction28,849 Mcf$105,013
Total$115,567

1,765 Mcf of this lease's gas, across 16 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.4575, -97.7624. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.45750, -97.76243 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,065 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,065 ft.

Completions filed
Oct 1983
1 of 1 wells

1 well

42-3373217816,065 ftOct 1983

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (369)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

369 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 202607559.138.00$600
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 202508259.383.30$271
Sep 202508062.743.08$246
Aug 202506163.933.01$184
Jul 202507466.743.32$245
Jun 202507266.483.13$225
May 202507460.553.23$239
Apr 202507162.363.54$252
Mar 202507567.704.27$320
Feb 202506870.884.34$295
Jan 202507374.324.28$312
Dec 2024012368.993.12$384
Nov 202408169.052.20$178
Oct 2024011571.372.28$262
Sep 202407769.612.36$182
Aug 202408875.632.06$182
Jul 2024011079.932.15$236
Jun 2024015878.082.63$416
May 2024069478.812.20$1,526
Apr 2024084384.451.66$1,399
Mar 202401,04380.301.55$1,612
Feb 2024087676.091.78$1,562
Jan 2024019273.023.30$633
Dec 2023026271.262.61$684
Nov 2023028977.892.81$811
Oct 2023031285.443.09$963
Sep 2023019289.042.74$525
Aug 202308280.522.67$219
Jul 202308174.852.64$214
Jun 2023019068.962.26$429
May 2023030870.622.23$686
Apr 2023019678.122.24$439
Mar 2023021072.852.39$503
Feb 202304275.112.47$104
Jan 202307076.533.39$237
Dec 202212538776.415.73$11,768
Nov 202209685.005.65$542
Oct 2022020087.185.86$1,173
Sep 2022012584.888.16$1,020
Aug 2022013194.529.13$1,196
Jul 20220170101.587.54$1,282
Jun 20220176115.097.98$1,404
May 20220393109.378.43$3,314
Apr 20220358104.226.84$2,448
Mar 20220429108.885.08$2,178
Feb 2022030091.054.86$1,458
Jan 2022024581.844.54$1,112
Dec 202102071.323.90$78
Nov 20210077.435.24$0
Oct 20210979.795.71$51
Sep 20210069.865.35$0
Aug 20210966.024.22$38
Jul 20210870.783.98$32
Jun 202101169.493.38$37
May 202101063.483.02$30
Apr 202101460.362.76$39
Mar 202103761.302.72$101
Feb 202101557.805.55$83
Jan 202101650.412.81$45
Dec 202002344.642.68$62
Nov 202002438.772.71$65
Oct 202002636.972.48$64
Sep 202001537.091.99$30
Aug 202001839.982.39$43
Jul 202001538.371.83$27
Jun 202001834.901.69$30
May 202002116.921.81$38
Apr 202002314.751.80$42
Mar 202002530.341.86$46
Feb 202002749.881.98$53
Jan 202002057.252.09$42
Dec 201902159.012.30$48
Nov 201903055.302.75$83
Oct 201901853.472.42$44
Sep 201901755.052.66$45
Aug 201901853.112.30$41
Jul 201902056.272.46$49
Jun 201901852.782.49$45
May 201902758.482.74$74
Apr 201903662.632.75$99
Mar 20190056.803.06$0
Feb 201902550.852.79$70
Jan 201903046.033.23$97
Dec 201801046.594.19$42
Nov 201804452.934.24$186
Oct 201806861.443.40$231
Sep 201805559.543.11$171
Aug 201801959.403.07$58
Jul 201803465.142.93$100
Jun 201803460.183.08$105
May 201806365.382.90$183
Apr 201808963.842.90$258
Mar 2018010761.222.79$298
Feb 201802161.782.77$58
Jan 201802162.874.01$84
Dec 201701557.272.92$44
Nov 201702755.423.12$84
Oct 201701949.292.98$57
Sep 201706047.523.09$185
Aug 201701345.373.00$39
Jul 201702943.873.09$90
Jun 201704642.493.09$142
May 201709345.373.26$304
Apr 20170947.933.21$29
Mar 201701546.772.98$45
Feb 201701050.452.95$30
Jan 201703049.413.42$103
Dec 201602948.763.72$108
Nov 201604542.492.64$119
Oct 201603646.193.09$111
Sep 201605641.553.10$174
Aug 201603141.442.92$91
Jul 201603341.622.92$97
Jun 201604345.352.69$115
May 201605642.521.99$112
Apr 201603236.561.99$64
Mar 201603833.011.79$68
Feb 201604526.472.06$93
Jan 201603627.352.36$85
Dec 201504332.362.00$86
Nov 201503838.792.17$82
Oct 2015041743.552.43$1,012
Sep 201504342.992.76$119
Aug 201505840.162.87$167
Jul 201504748.152.95$138
Jun 201506956.152.88$199
May 201503555.212.96$103
Apr 201503949.822.71$106
Mar 201505942.892.93$173
Feb 201504544.662.98$134
Jan 201504643.433.10$143
Dec 201401954.693.59$68
Nov 201404370.464.25$183
Oct 201403478.303.90$133
Sep 201403986.164.05$158
Aug 201404789.394.04$190
Jul 201404696.564.18$192
Jun 201405198.164.74$242
May 201404194.734.73$194
Apr 201404695.944.81$221
Mar 201403095.895.06$152
Feb 201403097.406.19$186
Jan 201405990.404.86$287
Dec 201307991.824.35$344
Nov 201304588.853.74$168
Oct 201304997.423.78$185
Sep 2013044104.113.72$164
Aug 2013033104.253.52$116
Jul 2013052102.523.72$193
Jun 201304594.403.93$177
May 201307694.834.15$315
Apr 201301093.964.28$43
Mar 201304893.623.91$188
Feb 201303291.233.42$109
Jan 201305091.603.42$171
Dec 201209986.773.42$339
Nov 201204586.953.62$163
Oct 201205789.383.40$194
Sep 201205494.672.92$158
Aug 201205592.662.91$160
Jul 201204485.133.02$133
Jun 201205879.822.52$146
May 201207191.612.49$177
Apr 2012042101.652.00$84
Mar 2012059105.052.22$131
Feb 2012056101.102.57$144
Jan 201207098.092.73$191
Dec 201105996.873.24$191
Nov 201107395.723.31$242
Oct 2011018984.983.65$690
Sep 201101883.623.99$72
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 201102198.134.40$93
Apr 2011010105.964.33$43
Mar 201103696.364.06$146
Feb 201102985.644.18$121
Jan 201103386.504.59$151
Dec 201002585.734.35$109
Nov 201001580.843.80$57
Oct 20100078.103.51$0
Sep 201002872.633.98$111
Aug 201003973.684.42$172
Jul 201004072.554.74$189
Jun 201003770.364.91$182
May 201003571.124.24$148
Apr 201002981.694.12$120
Mar 201002378.394.39$101
Feb 201002773.585.44$147
Jan 201003074.365.96$179
Dec 200903871.445.48$208
Nov 200903774.593.75$139
Oct 200903972.544.11$160
Sep 200903665.543.06$110
Aug 200903467.423.22$109
Jul 200903561.133.46$121
Jun 200903166.163.90$121
May 200902154.743.93$82
Apr 200901046.773.59$36
Mar 200902842.144.06$114
Feb 200903132.814.63$144
Jan 200903435.865.37$183
Dec 200803437.105.98$203
Nov 200802855.496.86$192
Oct 200802875.246.92$194
Sep 2008024101.767.88$189
Aug 2008026114.228.48$221
Jul 2008028131.0811.39$319
Jun 2008020131.3313.03$261
May 2008023123.1711.57$266
Apr 2008025110.3110.45$261
Mar 2008029101.909.66$280
Feb 200801892.538.77$158
Jan 200802690.388.21$213
Dec 200702388.337.30$168
Nov 200703391.677.29$241
Oct 200705982.856.92$408
Sep 200704575.846.24$281
Aug 200705969.066.39$377
Jul 200706470.906.39$409
Jun 200705962.007.55$445
May 200704958.747.85$384
Apr 200704459.617.81$343
Mar 200704856.927.30$350
Feb 200703955.108.22$320
Jan 200703850.306.73$256
Dec 200603056.656.92$208
Nov 200606254.207.62$472
Oct 200607354.906.01$439
Sep 200606160.085.04$307
Aug 200607268.717.34$528
Jul 200607269.376.34$457
Jun 200607566.286.38$479
May 200608366.016.42$533
Apr 200605764.397.36$420
Mar 200605156.707.08$361
Feb 200603557.597.75$271
Jan 200605460.598.93$482
Dec 200505754.9413.42$765
Nov 200506954.6910.59$731
Oct 200506758.3413.80$924
Sep 200504761.4512.08$568
Aug 200504161.519.80$402
Jul 200504055.697.84$314
Jun 200504252.337.38$310
May 200504545.226.65$299
Apr 200504149.207.36$302
Mar 200504450.377.15$315
Feb 200503945.226.31$246
Jan 200504243.166.32$266
Dec 200403939.866.75$263
Nov 200404145.286.33$260
Oct 200404249.706.52$274
Sep 200403843.245.28$201
Aug 200405142.375.55$283
Jul 200408238.286.08$499
Jun 200409536.106.43$611
May 200408737.486.49$565
Apr 200409434.475.86$551
Mar 200409434.365.53$520
Feb 200407832.455.51$430
Jan 200406632.036.30$416
Dec 200306930.266.30$435
Nov 200306228.804.60$285
Oct 200306928.174.76$328
Sep 200306826.314.75$323
Aug 200306429.765.13$328
Jul 200308029.415.17$414
Jun 200307728.565.98$461
May 2003010026.595.97$597
Apr 200309626.675.41$519
Mar 200307931.146.10$482
Feb 200307433.487.93$587
Jan 200307930.315.58$441
Dec 200206826.914.85$330
Nov 200207524.664.14$310
Oct 200208826.464.23$372
Sep 200207027.443.64$254
Aug 200208325.963.16$263
Jul 200208024.583.06$245
Jun 200209223.733.34$307
May 2002011424.663.58$409
Apr 200206023.653.51$211
Mar 200208322.003.10$258
Feb 200207318.222.38$173
Jan 200208017.172.38$190
Dec 200108516.932.36$201
Nov 200107118.072.41$171
Oct 200104119.782.53$104
Sep 200104024.262.25$90
Aug 200105624.873.05$171
Jul 200106623.933.20$211
Jun 2001010024.563.82$382
May 2001010325.524.31$444
Apr 2001010024.685.34$534
Mar 200109424.545.38$505
Feb 200108227.755.77$473
Jan 200109127.478.40$764
Dec 200008926.889.12$812
Nov 200008632.215.66$487
Oct 200009931.235.15$509
Sep 2000010331.875.19$534
Aug 2000011129.644.54$504
Jul 200009628.534.09$393
Jun 200009829.304.40$431
May 2000010227.263.68$375
Apr 200009624.513.12$299
Mar 200009828.422.86$280
Feb 200009227.622.73$251
Jan 2000010225.272.48$253
Dec 199909024.282.42$218
Nov 199908823.192.43$214
Oct 1999010020.982.80$280
Sep 199909421.752.62$246
Aug 199908819.262.88$253
Jul 1999010117.892.37$240
Jun 199908415.942.36$198
May 199908915.792.32$207
Apr 199909015.102.21$199
Mar 199908912.471.84$164
Feb 19990719.981.82$129
Jan 199905810.381.90$110
Dec 19980699.201.77$122
Nov 199808410.892.19$184
Oct 199808612.421.97$169
Sep 199808912.592.08$185
Aug 199808711.301.91$166
Jul 1998010411.742.24$233
Jun 199809711.242.24$217
May 199809112.622.21$201
Apr 199809913.042.51$248
Mar 199808712.802.31$201
Feb 199806913.952.30$159
Jan 199805614.702.15$121
Dec 199766216.322.41$247
Nov 199706318.193.09$195
Oct 1997477219.253.15$1,132
Sep 199704917.742.95$145
Aug 199708817.862.55$225
Jul 1997016717.582.25$375
Jun 1997020117.242.26$454
May 1997018018.972.31$416
Apr 1997018417.882.08$383
Mar 1997020718.951.94$401
Feb 1997018720.492.21$413
Jan 1997021423.483.54$758
Dec 1996022223.32$0
Nov 1996021121.97$0
Oct 1996021023.31$0
Sep 1996018122.22$0
Aug 1996014620.26$0
Jul 199607019.55$0
Jun 199608018.73$0
May 199607819.43$0
Apr 199607721.51$0
Mar 199607019.38$0
Feb 199606816.98$0
Jan 199607917.07$0
Dec 199507217.19$0
Nov 199507116.00$0
Oct 199507015.43$0
Sep 199506016.18$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 59.13 =         $0
Gas                   75 Mcf  × $  8.00 =       $600

────────────────────────────────────────────────────
Month total                                     $600

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/155670 is the state's own key, not one this site invented.