MCRAE-DEUSSEN

Operated by J-W OPERATING CO. (P-5 427960) in the MONTEATH (ATOKA, UPPER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 157278District 09Field 62580100GasSaveExport
Value, all time
$215 k
Nov 1995 – May 2010
Value, last 12 filed months
$40 k
at the published price for each month
Months reported
175
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 32 leases and 32 wells, and the rule below applies to all of them.

Discovered
1980-08-22
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 08/01/2005.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction52,450 Mcf$215,492
Total$215,492

9,747 Mcf of this lease's gas, across 14 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.1934, -97.3694. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.19343, -97.36939 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,698 ft
1 wells filed one
Completion to plug
14.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,698 ft.

Completions filed
Nov 1995
1 of 1 wells
Plug dates filed
May 2010
1 of 1 wells

Last completion to plug: a median of 14.5 years across the 1 well that filed both dates, with the middle half between 14.5 years and 14.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1213060535,698 ftNov 1995May 2010Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (175)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

175 months

May 2010071.124.24$0
Apr 20101,08281.694.12$4,461
Mar 20101,28078.394.39$5,618
Feb 201062073.585.44$3,374
Jan 20101,08674.365.96$6,477
Dec 20091,50971.445.48$8,275
Nov 20091,56574.593.75$5,871
Oct 20091,41972.544.11$5,832
Sep 2009065.543.06$0
Aug 2009467.423.22$13
Jul 2009061.133.46$0
Jun 2009166.163.90$4
May 200914554.743.93$569
Apr 2009046.773.59$0
Mar 2009042.144.06$0
Feb 2009032.814.63$0
Jan 2009035.865.37$0
Dec 2008037.105.98$0
Nov 2008055.496.86$0
Oct 2008075.246.92$0
Sep 20080101.767.88$0
Aug 20080114.228.48$0
Jul 20080131.0811.39$0
Jun 200830131.3313.03$391
May 2008163123.1711.57$1,887
Apr 20080110.3110.45$0
Mar 200848101.909.66$464
Feb 2008092.538.77$0
Jan 2008890.388.21$66
Dec 20074688.337.30$336
Nov 2007091.677.29$0
Oct 20071582.856.92$104
Sep 2007075.846.24$0
Aug 2007069.066.39$0
Jul 2007070.906.39$0
Jun 200795262.007.55$7,186
May 2007658.747.85$47
Apr 2007659.617.81$47
Mar 20078256.927.30$599
Feb 2007055.108.22$0
Jan 20072150.306.73$141
Dec 20065656.656.92$387
Nov 20064554.207.62$343
Oct 2006654.906.01$36
Sep 20064560.085.04$227
Aug 200610368.717.34$756
Jul 200627069.376.34$1,713
Jun 20069866.286.38$626
May 200684366.016.42$5,416
Apr 200625164.397.36$1,847
Mar 200659656.707.08$4,221
Feb 200694457.597.75$7,317
Jan 2006060.598.93$0
Dec 20051,53954.9413.42$20,646
Nov 200585954.6910.59$9,095
Oct 200566058.3413.80$9,105
Sep 200533561.4512.08$4,046
Aug 200541461.519.80$4,056
Jul 200519755.697.84$1,545
Jun 200514952.337.38$1,100
May 200516245.226.65$1,077
Apr 200542549.207.36$3,128
Mar 20059350.377.15$665
Feb 200510745.226.31$675
Jan 200514043.166.32$885
Dec 200420639.866.75$1,391
Nov 200414945.286.33$943
Oct 200439949.706.52$2,600
Sep 200411743.245.28$618
Aug 20048442.375.55$466
Jul 200436138.286.08$2,196
Jun 200453336.106.43$3,429
May 200434537.486.49$2,241
Apr 200452234.475.86$3,058
Mar 200458734.365.53$3,246
Feb 200465632.455.51$3,614
Jan 2004032.036.30$0
Dec 2003030.266.30$0
Nov 2003028.804.60$0
Oct 2003028.174.76$0
Sep 2003026.314.75$0
Aug 2003029.765.13$0
Jul 2003029.415.17$0
Jun 2003028.565.98$0
May 2003026.595.97$0
Apr 2003026.675.41$0
Mar 2003031.146.10$0
Feb 2003033.487.93$0
Jan 2003030.315.58$0
Dec 20025926.914.85$286
Nov 2002024.664.14$0
Oct 2002026.464.23$0
Sep 2002027.443.64$0
Aug 2002025.963.16$0
Jul 2002024.583.06$0
Jun 2002023.733.34$0
May 2002024.663.58$0
Apr 2002023.653.51$0
Mar 2002022.003.10$0
Feb 2002018.222.38$0
Jan 2002017.172.38$0
Dec 2001016.932.36$0
Nov 2001018.072.41$0
Oct 20016819.782.53$172
Sep 200133824.262.25$761
Aug 200134924.873.05$1,066
Jul 200181323.933.20$2,599
Jun 200175424.563.82$2,883
May 200126325.524.31$1,133
Apr 200128624.685.34$1,526
Mar 200130124.545.38$1,618
Feb 200126127.755.77$1,505
Jan 200131627.478.40$2,654
Dec 200017026.889.12$1,551
Nov 200024232.215.66$1,369
Oct 200021031.235.15$1,081
Sep 200034031.875.19$1,763
Aug 200030329.644.54$1,376
Jul 20009528.534.09$389
Jun 200029229.304.40$1,284
May 200029927.263.68$1,100
Apr 200033924.513.12$1,056
Mar 200031428.422.86$898
Feb 200034127.622.73$930
Jan 200040925.272.48$1,015
Dec 199935524.282.42$860
Nov 199932523.192.43$791
Oct 199932820.982.80$920
Sep 199938321.752.62$1,003
Aug 199929419.262.88$845
Jul 199924717.892.37$586
Jun 199928115.942.36$664
May 199933715.792.32$782
Apr 199936815.102.21$813
Mar 199940112.471.84$737
Feb 19992909.981.82$527
Jan 199934410.381.90$654
Dec 19983599.201.77$637
Nov 199838010.892.19$831
Oct 199839012.421.97$768
Sep 199834512.592.08$719
Aug 199834311.301.91$654
Jul 199834911.742.24$781
Jun 199836011.242.24$805
May 199832012.622.21$706
Apr 199831313.042.51$784
Mar 199847212.802.31$1,090
Feb 199830613.952.30$704
Jan 199836414.702.15$784
Dec 199737716.322.41$909
Nov 199738118.193.09$1,177
Oct 199735919.253.15$1,131
Sep 199736017.742.95$1,064
Aug 199738817.862.55$991
Jul 199737317.582.25$838
Jun 199741517.242.26$937
May 199746418.972.31$1,071
Apr 199742617.882.08$887
Mar 199744818.951.94$869
Feb 199741020.492.21$904
Jan 199750223.483.54$1,777
Dec 199655823.32$0
Nov 199648921.97$0
Oct 199648223.31$0
Sep 199639622.22$0
Aug 199645320.26$0
Jul 199642419.55$0
Jun 199641018.73$0
May 199679619.43$0
Apr 199689621.51$0
Mar 199648719.38$0
Feb 19961,06116.98$0
Jan 19961,10717.07$0
Dec 19951,19217.19$0
Nov 199599616.00$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2010 — as filed, then multipliedworked
Gas                1,082 Mcf  × $  4.12 =     $4,461

────────────────────────────────────────────────────
Month total                                   $4,461

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/157278 is the state's own key, not one this site invented.