BRIXEY "A"

Operated by WOLF, GENE L.L.C. (P-5 935575) in the BUCK M. (BRYSON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 158513District 09Field 12887500CondensateGasSaveExport
Value, all time
$78 k
Jan 1996 – Aug 2010
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
176
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 23 leases and 42 wells, and the rule below applies to all of them.

Discovered
1977-05-21
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: FIELD RULES PERMANENT 1/9/84 PER DOCKET #9-80,976

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition41 bbl$778
GasProduction17,420 Mcf$76,955
Total$77,733

2,895 Mcf of this lease's gas, across 12 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.6159, -98.2871. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.61594, -98.28711 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,240 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,240 ft.

Completions filed
Aug 2010
1 of 1 wells

1 well

42-0773397415,240 ftAug 2010Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (176)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

176 months

Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 201008481.694.12$346
Mar 2010012178.394.39$531
Feb 2010015873.585.44$860
Jan 201001574.365.96$89
Dec 2009010071.445.48$548
Nov 200902074.593.75$75
Oct 200907672.544.11$312
Sep 2009011265.543.06$343
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 200904066.163.90$156
May 2009010654.743.93$416
Apr 200909646.773.59$344
Mar 2009010842.144.06$438
Feb 200906432.814.63$297
Jan 20090035.865.37$0
Dec 2008010037.105.98$598
Nov 2008010055.496.86$686
Oct 2008011275.246.92$775
Sep 20080113101.767.88$890
Aug 20080113114.228.48$959
Jul 20080112131.0811.39$1,276
Jun 20080120131.3313.03$1,564
May 20080126123.1711.57$1,458
Apr 20080119110.3110.45$1,244
Mar 20080119101.909.66$1,150
Feb 2008010792.538.77$938
Jan 2008012790.388.21$1,042
Dec 2007012488.337.30$905
Nov 2007012491.677.29$904
Oct 2007012082.856.92$831
Sep 2007012175.846.24$756
Aug 2007012469.066.39$792
Jul 2007012270.906.39$779
Jun 2007012262.007.55$921
May 2007012258.747.85$957
Apr 2007011559.617.81$898
Mar 2007012056.927.30$876
Feb 2007012055.108.22$986
Jan 2007012050.306.73$807
Dec 2006010956.656.92$754
Nov 200604054.207.62$305
Oct 200609554.906.01$571
Sep 200604960.085.04$247
Aug 200602768.717.34$198
Jul 200601269.376.34$76
Jun 200606866.286.38$434
May 200605066.016.42$321
Apr 2006010064.397.36$736
Mar 200605356.707.08$375
Feb 2006010557.597.75$814
Jan 2006011860.598.93$1,054
Dec 2005011054.9413.42$1,476
Nov 2005011054.6910.59$1,165
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 200501661.519.80$157
Jul 2005011055.697.84$863
Jun 2005011252.337.38$827
May 2005011045.226.65$732
Apr 2005010849.207.36$795
Mar 2005011050.377.15$787
Feb 2005010245.226.31$644
Jan 200509943.166.32$626
Dec 200409239.866.75$621
Nov 2004010545.286.33$665
Oct 200409549.706.52$619
Sep 200409343.245.28$491
Aug 2004011042.375.55$611
Jul 2004011038.286.08$669
Jun 2004010036.106.43$643
May 2004011037.486.49$714
Apr 2004010834.475.86$633
Mar 2004011034.365.53$608
Feb 200409032.455.51$496
Jan 200407732.036.30$485
Dec 2003012030.266.30$756
Nov 2003011028.804.60$505
Oct 2003011028.174.76$524
Sep 2003012226.314.75$579
Aug 2003012029.765.13$616
Jul 2003012029.415.17$621
Jun 2003011028.565.98$658
May 2003011226.595.97$669
Apr 2003011026.675.41$595
Mar 2003012031.146.10$732
Feb 2003010033.487.93$793
Jan 2003010530.315.58$586
Dec 2002011026.914.85$534
Nov 2002011424.664.14$472
Oct 2002011226.464.23$474
Sep 2002012027.443.64$436
Aug 2002011225.963.16$354
Jul 2002011024.583.06$337
Jun 2002012023.733.34$401
May 2002011024.663.58$394
Apr 200206723.653.51$235
Mar 2002012422.003.10$385
Feb 2002011218.222.38$266
Jan 2002011917.172.38$283
Dec 2001012016.932.36$284
Nov 2001011218.072.41$269
Oct 2001011819.782.53$298
Sep 2001012024.262.25$270
Aug 2001012024.873.05$366
Jul 2001011823.933.20$377
Jun 2001012324.563.82$470
May 2001012925.524.31$556
Apr 2001012224.685.34$651
Mar 2001011224.545.38$602
Feb 2001011227.755.77$646
Jan 2001012527.478.40$1,050
Dec 2000012426.889.12$1,131
Nov 2000011232.215.66$634
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 1998025514.702.15$549
Dec 1997025016.322.41$603
Nov 1997025018.193.09$772
Oct 1997026119.253.15$822
Sep 1997025017.742.95$739
Aug 1997025017.862.55$639
Jul 1997025017.582.25$562
Jun 1997026617.242.26$600
May 19974127418.972.31$1,410
Apr 1997023417.882.08$487
Mar 1997025218.951.94$489
Feb 1997020520.492.21$452
Jan 1997023723.483.54$839
Dec 1996023823.32$0
Nov 1996022421.97$0
Oct 1996023723.31$0
Sep 1996023722.22$0
Aug 1996022620.26$0
Jul 1996024619.55$0
Jun 1996024718.73$0
May 1996025819.43$0
Apr 1996024921.51$0
Mar 1996027419.38$0
Feb 1996023916.98$0
Jan 1996022017.07$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2010 — as filed, then multipliedworked
Condensate             0 bbl  × $ 81.69 =         $0
Gas                   84 Mcf  × $  4.12 =       $346

────────────────────────────────────────────────────
Month total                                     $346

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/158513 is the state's own key, not one this site invented.