LEE-HAZELWOOD, GEORGIA

Operated by CHARTER OAK PRODUCTION CO., LLC (P-5 146669) in the SOUTHMAYD, NORTH (BAKER-VIOLA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 172046District 09Field 84788200CondensateGasSaveExport
Value, all time
$198 k
Oct 1998 – May 2015
Value, last 12 filed months
$9 k
at the published price for each month
Months reported
200
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 95 leases and 108 wells, and the rule below applies to all of them.

Discovered
1977-07-14
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1986-09-01.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 02/01/2021.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition204 bbl$12,734
GasProduction48,518 Mcf$185,323
Total$198,057

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.6682, -96.7614. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.66816, -96.76143 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,412 ft
1 wells filed one
Completion to plug
30.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,412 ft.

Completions filed
Sep 1984
1 of 1 wells
Plug dates filed
Sep 2014
1 of 1 wells

Last completion to plug: a median of 30.0 years across the 1 well that filed both dates, with the middle half between 30.0 years and 30.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1813106818,412 ftSep 1984Sep 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (200)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

200 months

May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 2014125070.464.25$8,808
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110185.644.18$4
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100180.843.80$4
Oct 20100078.103.51$0
Sep 201001572.633.98$60
Aug 20100073.684.42$0
Jul 201001172.554.74$52
Jun 20100170.364.91$5
May 201007471.124.24$313
Apr 2010019281.694.12$792
Mar 201008778.394.39$382
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 200901567.423.22$48
Jul 200908961.133.46$308
Jun 2009010266.163.90$397
May 200909354.743.93$365
Apr 2009012946.773.59$463
Mar 2009012242.144.06$495
Feb 2009010832.814.63$500
Jan 2009011735.865.37$628
Dec 2008011537.105.98$687
Nov 2008010455.496.86$713
Oct 2008010075.246.92$692
Sep 2008018101.767.88$142
Aug 2008030114.228.48$254
Jul 2008044131.0811.39$501
Jun 2008079131.3313.03$1,030
May 2008089123.1711.57$1,030
Apr 2008077110.3110.45$805
Mar 2008073101.909.66$705
Feb 200806892.538.77$596
Jan 200806990.388.21$566
Dec 200708988.337.30$650
Nov 2007010991.677.29$795
Oct 200705582.856.92$381
Sep 200705675.846.24$350
Aug 200708269.066.39$524
Jul 200709770.906.39$620
Jun 2007010962.007.55$823
May 2007010758.747.85$840
Apr 200707959.617.81$617
Mar 200708656.927.30$628
Feb 200705555.108.22$452
Jan 2007010750.306.73$720
Dec 2006011656.656.92$803
Nov 200605754.207.62$434
Oct 200606654.906.01$397
Sep 200607360.085.04$368
Aug 200607568.717.34$550
Jul 2006010169.376.34$641
Jun 2006012166.286.38$772
May 2006013766.016.42$880
Apr 2006012264.397.36$898
Mar 200609956.707.08$701
Feb 200608357.597.75$643
Jan 200609960.598.93$884
Dec 2005010754.9413.42$1,435
Nov 2005011554.6910.59$1,218
Oct 2005013058.3413.80$1,793
Sep 2005014061.4512.08$1,691
Aug 2005014861.519.80$1,450
Jul 2005014955.697.84$1,169
Jun 2005014552.337.38$1,070
May 2005015645.226.65$1,038
Apr 2005015049.207.36$1,104
Mar 2005016450.377.15$1,173
Feb 2005013745.226.31$865
Jan 2005016943.166.32$1,068
Dec 2004017339.866.75$1,168
Nov 2004018345.286.33$1,158
Oct 20047917349.706.52$5,053
Sep 2004016443.245.28$867
Aug 2004017642.375.55$977
Jul 2004018438.286.08$1,119
Jun 2004016336.106.43$1,049
May 2004017537.486.49$1,137
Apr 2004018434.475.86$1,078
Mar 2004013334.365.53$736
Feb 2004018032.455.51$992
Jan 2004019732.036.30$1,241
Dec 2003020330.266.30$1,279
Nov 2003020728.804.60$951
Oct 2003022128.174.76$1,052
Sep 2003019026.314.75$902
Aug 2003019529.765.13$1,000
Jul 2003033429.415.17$1,727
Jun 2003020428.565.98$1,221
May 2003026426.595.97$1,577
Apr 2003038926.675.41$2,103
Mar 2003017331.146.10$1,055
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 200201924.664.14$79
Oct 2002013226.464.23$558
Sep 2002012327.443.64$447
Aug 2002015625.963.16$494
Jul 2002032224.583.06$986
Jun 2002034223.733.34$1,142
May 2002037524.663.58$1,344
Apr 2002039023.653.51$1,370
Mar 2002038122.003.10$1,182
Feb 2002017218.222.38$409
Jan 2002038417.172.38$912
Dec 2001040216.932.36$950
Nov 2001041818.072.41$1,006
Oct 2001044919.782.53$1,135
Sep 2001047324.262.25$1,065
Aug 2001050324.873.05$1,536
Jul 2001052223.933.20$1,669
Jun 2001053624.563.82$2,050
May 2001055925.524.31$2,408
Apr 2001053324.685.34$2,844
Mar 2001069124.545.38$3,715
Feb 2001053427.755.77$3,080
Jan 2001042827.478.40$3,595
Dec 2000053726.889.12$4,899
Nov 2000052532.215.66$2,970
Oct 2000064631.235.15$3,324
Sep 2000067731.875.19$3,511
Aug 2000074529.644.54$3,383
Jul 2000077728.534.09$3,178
Jun 2000077929.304.40$3,425
May 2000080827.263.68$2,973
Apr 2000086924.513.12$2,708
Mar 2000040128.422.86$1,147
Feb 2000083127.622.73$2,266
Jan 2000089725.272.48$2,225
Dec 1999087924.282.42$2,130
Nov 199901,08723.192.43$2,646
Oct 199901,08720.982.80$3,048
Sep 199901,10821.752.62$2,902
Aug 199902,01719.262.88$5,800
Jul 199901,27617.892.37$3,027
Jun 199901,30015.942.36$3,071
May 199901,41015.792.32$3,273
Apr 199901,44215.102.21$3,184
Mar 199901,74712.471.84$3,212
Feb 199907649.981.82$1,389
Jan 1999055410.381.90$1,053
Dec 199802,0229.201.77$3,586
Nov 199801,97010.892.19$4,306
Oct 199802,14112.421.97$4,216

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2014 — as filed, then multipliedworked
Condensate           125 bbl  × $ 70.46 =     $8,808
Gas                    0 Mcf  × $  4.25 =         $0

────────────────────────────────────────────────────
Month total                                   $8,808

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/172046 is the state's own key, not one this site invented.