JACKSON HEIRS "C"

Operated by CENTURY PETROLEUM, INC. (P-5 141763) in the JMG MAG (MISS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 180522District 09Field 450992502 tax incentive programmesCondensateGasSaveExport
Value, all time
$391 k
Aug 2000 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
310
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 180 leases and 205 wells, and the rule below applies to all of them.

Discovered
2000-08-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: DONE THIS TWENTY-FIFTH DAY OF APRIL, 2005

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-03-11155621
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition429 bbl$16,403
GasProduction72,532 Mcf$374,567
Total$390,970

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.1233, -97.9937. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.12326, -97.99373 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,300 ft.

Completions filed
Aug 2000
1 of 1 wells

1 well

42-23738548R 76,300 ftAug 2000

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (310)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

310 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200144.642.68$3
Nov 20200138.772.71$3
Oct 20200136.972.48$2
Sep 20200137.091.99$2
Aug 20200139.982.39$2
Jul 20200138.371.83$2
Jun 20200134.901.69$2
May 20200116.921.81$2
Apr 20200114.751.80$2
Mar 20200130.341.86$2
Feb 20200149.881.98$2
Jan 20200157.252.09$2
Dec 20190159.012.30$2
Nov 20190155.302.75$3
Oct 20190153.472.42$2
Sep 20190155.052.66$3
Aug 20190153.112.30$2
Jul 20190156.272.46$2
Jun 20190152.782.49$2
May 20190158.482.74$3
Apr 20190162.632.75$3
Mar 20190156.803.06$3
Feb 20190150.852.79$3
Jan 20190146.033.23$3
Dec 20180146.594.19$4
Nov 20180152.934.24$4
Oct 20180161.443.40$3
Sep 20180159.543.11$3
Aug 20180159.403.07$3
Jul 20180165.142.93$3
Jun 20180160.183.08$3
May 20180165.382.90$3
Apr 20180163.842.90$3
Mar 20180161.222.79$3
Feb 20180161.782.77$3
Jan 20180162.874.01$4
Dec 20170157.272.92$3
Nov 20170155.423.12$3
Oct 201701849.292.98$54
Sep 20170147.523.09$3
Aug 20170145.373.00$3
Jul 20170143.873.09$3
Jun 20170142.493.09$3
May 20170145.373.26$3
Apr 20170147.933.21$3
Mar 20170146.772.98$3
Feb 20170150.452.95$3
Jan 20170149.413.42$3
Dec 20160148.763.72$4
Nov 20160242.492.64$5
Oct 201601346.193.09$40
Sep 201603141.553.10$96
Aug 201604241.442.92$123
Jul 201604141.622.92$120
Jun 201603445.352.69$91
May 201606742.521.99$133
Apr 201605336.561.99$106
Mar 201604333.011.79$77
Feb 201607026.472.06$144
Jan 2016016327.352.36$385
Dec 201505832.362.00$116
Nov 201509138.792.17$197
Oct 201507943.552.43$192
Sep 201509142.992.76$251
Aug 201505540.162.87$158
Jul 201508248.152.95$242
Jun 201506956.152.88$199
May 201506955.212.96$204
Apr 201506449.822.71$173
Mar 201505642.892.93$164
Feb 201503544.662.98$104
Jan 201506043.433.10$186
Dec 201408354.693.59$298
Nov 201405470.464.25$230
Oct 201405978.303.90$230
Sep 201404786.164.05$190
Aug 201405289.394.04$210
Jul 201405796.564.18$238
Jun 201405598.164.74$261
May 201406094.734.73$284
Apr 201407195.944.81$341
Mar 201408095.895.06$405
Feb 201406797.406.19$415
Jan 201409990.404.86$481
Dec 201308191.824.35$353
Nov 2013011488.853.74$426
Oct 2013013197.423.78$495
Sep 20130166104.113.72$617
Aug 20130109104.253.52$384
Jul 20130176102.523.72$654
Jun 2013012694.403.93$496
May 201307694.834.15$315
Apr 2013011693.964.28$497
Mar 201307193.623.91$278
Feb 201309191.233.42$311
Jan 201306991.603.42$236
Dec 201207286.773.42$246
Nov 2012017786.953.62$642
Oct 2012014189.383.40$479
Sep 2012017694.672.92$514
Aug 2012024292.662.91$704
Jul 2012013485.133.02$405
Jun 201205879.822.52$146
May 2012013091.612.49$323
Apr 20120351101.652.00$701
Mar 20120365105.052.22$811
Feb 20120625101.102.57$1,606
Jan 2012049798.092.73$1,359
Dec 2011049296.873.24$1,594
Nov 2011019095.723.31$629
Oct 201102384.983.65$84
Sep 201101583.623.99$60
Aug 201102683.404.15$108
Jul 201103494.144.52$154
Jun 201103592.904.64$162
May 201105098.134.40$220
Apr 201101105.964.33$4
Mar 20110196.364.06$4
Feb 20110185.644.18$4
Jan 20110186.504.59$5
Dec 20100085.734.35$0
Nov 20100380.843.80$11
Oct 20100678.103.51$21
Sep 20100072.633.98$0
Aug 20100173.684.42$4
Jul 20100072.554.74$0
Jun 20100170.364.91$5
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 200948042.144.06$2,023
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 200702050.306.73$135
Dec 2006017356.656.92$1,197
Nov 2006053154.207.62$4,045
Oct 2006026354.906.01$1,582
Sep 2006034460.085.04$1,733
Aug 2006028668.717.34$2,099
Jul 2006035669.376.34$2,258
Jun 20068428866.286.38$7,406
May 2006032666.016.42$2,095
Apr 2006052164.397.36$3,835
Mar 2006033056.707.08$2,337
Feb 2006033557.597.75$2,597
Jan 2006027160.598.93$2,421
Dec 2005014054.9413.42$1,878
Nov 2005052654.6910.59$5,570
Oct 2005065558.3413.80$9,036
Sep 2005051561.4512.08$6,221
Aug 2005057261.519.80$5,604
Jul 2005048655.697.84$3,812
Jun 200509852.337.38$723
May 200508945.226.65$592
Apr 200508749.207.36$640
Mar 200509350.377.15$665
Feb 200508545.226.31$537
Jan 2005010543.166.32$664
Dec 2004030639.866.75$2,066
Nov 20041883745.286.33$6,114
Oct 200401,00749.706.52$6,561
Sep 200401,03143.245.28$5,448
Aug 200401,10242.375.55$6,117
Jul 200401,16438.286.08$7,082
Jun 200401,21536.106.43$7,816
May 200401,36137.486.49$8,839
Apr 200401,37534.475.86$8,055
Mar 200401,44234.365.53$7,974
Feb 200401,28432.455.51$7,074
Jan 200401,00732.036.30$6,344
Dec 200301,42430.266.30$8,974
Nov 200301,41628.804.60$6,507
Oct 200301,31128.174.76$6,240
Sep 200301,30426.314.75$6,193
Aug 200301,38529.765.13$7,105
Jul 2003043629.415.17$2,254
Jun 2003056528.565.98$3,380
May 200301,23126.595.97$7,352
Apr 200301,24526.675.41$6,732
Mar 200301,27631.146.10$7,779
Feb 200301,31533.487.93$10,423
Jan 2003022430.315.58$1,250
Dec 2002027026.914.85$1,311
Nov 20021311,03724.664.14$7,520
Oct 200201,22126.464.23$5,164
Sep 2002098727.443.64$3,588
Aug 200201,18225.963.16$3,740
Jul 200201,16024.583.06$3,552
Jun 200201,21823.733.34$4,066
May 2002050424.663.58$1,806
Apr 200201,06523.653.51$3,741
Mar 200201,14122.003.10$3,540
Feb 200201,00318.222.38$2,383
Jan 2002058017.172.38$1,378
Dec 200101,22216.932.36$2,889
Nov 2001085018.072.41$2,045
Oct 200101,19719.782.53$3,027
Sep 200101,21124.262.25$2,726
Aug 200101,27124.873.05$3,881
Jul 200101,28023.933.20$4,092
Jun 200101,23624.563.82$4,727
May 200101,41325.524.31$6,086
Apr 200101,48924.685.34$7,944
Mar 200101,28624.545.38$6,914
Feb 200101,30227.755.77$7,509
Jan 200101,38927.478.40$11,666
Dec 200001,58326.889.12$14,441
Nov 20001481,63132.215.66$13,995
Oct 200001,62431.235.15$8,356
Sep 200003031.875.19$156
Aug 20000029.644.54$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2020 — as filed, then multipliedworked
Condensate             0 bbl  × $ 44.64 =         $0
Gas                    1 Mcf  × $  2.68 =         $3

────────────────────────────────────────────────────
Month total                                       $3

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/180522 is the state's own key, not one this site invented.