SMITH, C. P. GAS UNIT

Operated by EAGLERIDGE OPERATING, LLC (P-5 238462) in the BOONSVILLE (BEND CONGL., GAS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 185070District 09Field 105745202 tax incentive programmesCondensateGasSaveExport
Value, all time
$55 k
Aug 2001 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
298
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3,438 leases and 3,443 wells, and the rule below applies to all of them.

Discovered
1945-05-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1991-06-10.

The Commission's schedule remark for this field reads: AMOUNT HAD BEEN CALCULATED FOR 5/1/97.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-04-27191169
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3 bbl$160
GasProduction11,954 Mcf$54,874
Total$55,035

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.1520, -97.8291. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.15198, -97.82909 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,240 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,240 ft.

Completions filed
Aug 2001
1 of 1 wells

1 well

42-4973469646,240 ftAug 2001

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (298)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

298 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 202501667.704.27$68
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230685.443.09$19
Sep 20230989.042.74$25
Aug 20230080.522.67$0
Jul 202304074.852.64$106
Jun 20230668.962.26$14
May 202308170.622.23$180
Apr 20230078.122.24$0
Mar 202308172.852.39$194
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 202202787.185.86$158
Sep 202203484.888.16$278
Aug 202203794.529.13$338
Jul 20220172101.587.54$1,297
Jun 20220189115.097.98$1,508
May 20220364109.378.43$3,070
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220581.844.54$23
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 202102279.795.71$126
Sep 20210769.865.35$37
Aug 20210266.024.22$8
Jul 202102970.783.98$115
Jun 20210369.493.38$10
May 202101363.483.02$39
Apr 202104960.362.76$135
Mar 202107861.302.72$212
Feb 202105657.805.55$311
Jan 202103050.412.81$84
Dec 202001544.642.68$40
Nov 20200738.772.71$19
Oct 202001536.972.48$37
Sep 202001637.091.99$32
Aug 202002839.982.39$67
Jul 202002138.371.83$38
Jun 202001234.901.69$20
May 20200616.921.81$11
Apr 202002014.751.80$36
Mar 202005030.341.86$93
Feb 2020012649.881.98$250
Jan 2020013857.252.09$289
Dec 2019013559.012.30$311
Nov 2019015555.302.75$426
Oct 20193053.472.42$160
Sep 201903755.052.66$98
Aug 201904553.112.30$104
Jul 201905256.272.46$128
Jun 201903752.782.49$92
May 201908258.482.74$225
Apr 201905562.632.75$151
Mar 201901656.803.06$49
Feb 201901450.852.79$39
Jan 201902646.033.23$84
Dec 20180046.594.19$0
Nov 201802752.934.24$114
Oct 201802061.443.40$68
Sep 20180059.543.11$0
Aug 201802359.403.07$71
Jul 201802865.142.93$82
Jun 201804360.183.08$132
May 201802265.382.90$64
Apr 201801863.842.90$52
Mar 201804361.222.79$120
Feb 201801661.782.77$44
Jan 20180562.874.01$20
Dec 201703157.272.92$91
Nov 201701055.423.12$31
Oct 2017013849.292.98$412
Sep 20170047.523.09$0
Aug 201701445.373.00$42
Jul 201701743.873.09$52
Jun 201705642.493.09$173
May 201702145.373.26$69
Apr 201703847.933.21$122
Mar 20170846.772.98$24
Feb 201702850.452.95$83
Jan 201703249.413.42$109
Dec 201604348.763.72$160
Nov 201603842.492.64$100
Oct 201602046.193.09$62
Sep 201601241.553.10$37
Aug 201602441.442.92$70
Jul 201601841.622.92$53
Jun 201602045.352.69$54
May 201603042.521.99$60
Apr 201605336.561.99$106
Mar 201602333.011.79$41
Feb 201602626.472.06$54
Jan 201602827.352.36$66
Dec 201501332.362.00$26
Nov 20150438.792.17$9
Oct 20150743.552.43$17
Sep 201504642.992.76$127
Aug 201504340.162.87$124
Jul 201506948.152.95$203
Jun 201509856.152.88$283
May 201503055.212.96$89
Apr 201509049.822.71$244
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 201403554.693.59$126
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 201401486.164.05$57
Aug 20140089.394.04$0
Jul 201401396.564.18$54
Jun 20140098.164.74$0
May 20140994.734.73$43
Apr 201401395.944.81$63
Mar 201402995.895.06$147
Feb 201401297.406.19$74
Jan 201403790.404.86$180
Dec 201303791.824.35$161
Nov 201304488.853.74$164
Oct 201301797.423.78$64
Sep 2013033104.113.72$123
Aug 2013013104.253.52$46
Jul 201302102.523.72$7
Jun 20130494.403.93$16
May 201304294.834.15$174
Apr 201301993.964.28$81
Mar 201304493.623.91$172
Feb 20130891.233.42$27
Jan 20130791.603.42$24
Dec 201203086.773.42$103
Nov 201201686.953.62$58
Oct 201201789.383.40$58
Sep 20120294.672.92$6
Aug 201201692.662.91$47
Jul 201202285.133.02$66
Jun 201201079.822.52$25
May 20120791.612.49$17
Apr 2012018101.652.00$36
Mar 201205105.052.22$11
Feb 201205101.102.57$13
Jan 20120798.092.73$19
Dec 201101596.873.24$49
Nov 20110895.723.31$26
Oct 201101884.983.65$66
Sep 201101383.623.99$52
Aug 201101083.404.15$41
Jul 201102394.144.52$104
Jun 201101592.904.64$70
May 201101198.134.40$48
Apr 201107105.964.33$30
Mar 20110696.364.06$24
Feb 201101385.644.18$54
Jan 201102086.504.59$92
Dec 201001285.734.35$52
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100172.633.98$4
Aug 201002273.684.42$97
Jul 201002272.554.74$104
Jun 201001970.364.91$93
May 201003571.124.24$148
Apr 201003581.694.12$144
Mar 201003078.394.39$132
Feb 201007773.585.44$419
Jan 201001774.365.96$101
Dec 200901971.445.48$104
Nov 200903074.593.75$113
Oct 20090072.544.11$0
Sep 200903065.543.06$92
Aug 200902367.423.22$74
Jul 200903861.133.46$132
Jun 200904166.163.90$160
May 200901054.743.93$39
Apr 200902946.773.59$104
Mar 200901942.144.06$77
Feb 200901832.814.63$83
Jan 200903235.865.37$172
Dec 200803637.105.98$215
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 2008020101.767.88$158
Aug 2008028114.228.48$238
Jul 2008025131.0811.39$285
Jun 2008034131.3313.03$443
May 2008038123.1711.57$440
Apr 2008046110.3110.45$481
Mar 200806101.909.66$58
Feb 200803792.538.77$325
Jan 200805190.388.21$418
Dec 200704888.337.30$350
Nov 20070091.677.29$0
Oct 200704882.856.92$332
Sep 200704175.846.24$256
Aug 200701969.066.39$121
Jul 200705070.906.39$319
Jun 200706862.007.55$513
May 200702658.747.85$204
Apr 200706159.617.81$476
Mar 200706856.927.30$497
Feb 200703755.108.22$304
Jan 200704750.306.73$316
Dec 200603556.656.92$242
Nov 200604254.207.62$320
Oct 200604554.906.01$271
Sep 200606060.085.04$302
Aug 200605368.717.34$389
Jul 200605569.376.34$349
Jun 200605266.286.38$332
May 20060066.016.42$0
Apr 200606964.397.36$508
Mar 200605556.707.08$390
Feb 200602157.597.75$163
Jan 200603560.598.93$313
Dec 200502654.9413.42$349
Nov 200504154.6910.59$434
Oct 200504758.3413.80$648
Sep 200505661.4512.08$676
Aug 200502361.519.80$225
Jul 200503755.697.84$290
Jun 200505052.337.38$369
May 200506745.226.65$446
Apr 200507149.207.36$523
Mar 200507450.377.15$529
Feb 200506445.226.31$404
Jan 200506043.166.32$379
Dec 200407639.866.75$513
Nov 200408845.286.33$557
Oct 200408549.706.52$554
Sep 200408143.245.28$428
Aug 200408742.375.55$483
Jul 20040038.286.08$0
Jun 200409036.106.43$579
May 2004011137.486.49$721
Apr 2004011434.475.86$668
Mar 2004010534.365.53$581
Feb 2004010632.455.51$584
Jan 2004012132.036.30$762
Dec 2003010930.266.30$687
Nov 200305628.804.60$257
Oct 200305428.174.76$257
Sep 200304226.314.75$199
Aug 200305329.765.13$272
Jul 200304829.415.17$248
Jun 200304828.565.98$287
May 200306526.595.97$388
Apr 200306526.675.41$351
Mar 200306031.146.10$366
Feb 200305833.487.93$460
Jan 200306730.315.58$374
Dec 200204226.914.85$204
Nov 200206524.664.14$269
Oct 200207726.464.23$326
Sep 200206527.443.64$236
Aug 200205525.963.16$174
Jul 200204224.583.06$129
Jun 200207723.733.34$257
May 200206724.663.58$240
Apr 200207723.653.51$270
Mar 2002013522.003.10$419
Feb 2002027618.222.38$656
Jan 2002030817.172.38$732
Dec 2001038316.932.36$906
Nov 2001016518.072.41$397
Oct 2001034819.782.53$880
Sep 2001045524.262.25$1,024
Aug 2001041424.873.05$1,264

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2025 — as filed, then multipliedworked
Condensate             0 bbl  × $ 67.70 =         $0
Gas                   16 Mcf  × $  4.27 =        $68

────────────────────────────────────────────────────
Month total                                      $68

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/185070 is the state's own key, not one this site invented.