GAGE TRUSTEE "A"

Operated by DEVON ENERGY PRODUCTION CO, L.P. (P-5 216378) in the NEWARK, EAST (BARNETT SHALE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 186579District 09Field 652802002 tax incentive programmesCondensateGasSaveExport
Value, all time
$405 k
Oct 2001 – Feb 2007
Value, last 12 filed months
$56 k
at the published price for each month
Months reported
65
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 21,881 leases and 22,468 wells, and the rule below applies to all of them.

Discovered
1981-10-15
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2009-09-29.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112002-03-25146707
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,557 bbl$122,891
GasProduction55,343 Mcf$282,447
Total$405,339

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.2242, -97.4815. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.22420, -97.48147 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,117 ft
1 wells filed one
Completion to plug
11 months
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,117 ft.

Completions filed
Nov 2018
1 of 1 wells
Plug dates filed
Oct 2019
1 of 1 wells

Last completion to plug: a median of 11 months across the 1 well that filed both dates, with the middle half between 11 months and 11 months. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4973467918,117 ftNov 2018Oct 2019Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (65)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

65 months

Feb 2007114055.108.22$6,281
Jan 20070050.306.73$0
Dec 200601456.656.92$97
Nov 2006011154.207.62$846
Oct 200616840554.906.01$11,659
Sep 2006049260.085.04$2,478
Aug 2006058268.717.34$4,272
Jul 2006030869.376.34$1,954
Jun 2006047066.286.38$3,000
May 200617762166.016.42$15,674
Apr 2006071064.397.36$5,226
Mar 2006064556.707.08$4,568
Feb 2006039557.597.75$3,062
Jan 2006068760.598.93$6,137
Dec 2005045154.9413.42$6,050
Nov 2005063054.6910.59$6,671
Oct 20051582058.3413.80$9,494
Sep 2005016261.4512.08$1,957
Aug 200501561.519.80$147
Jul 200501755.697.84$133
Jun 2005012052.337.38$886
May 200501445.226.65$93
Apr 2005070849.207.36$5,211
Mar 2005027050.377.15$1,932
Feb 200517342845.226.31$10,525
Jan 2005057543.166.32$3,635
Dec 2004056439.866.75$3,808
Nov 2004050845.286.33$3,216
Oct 2004053749.706.52$3,499
Sep 200417372043.245.28$11,285
Aug 2004024742.375.55$1,371
Jul 2004024838.286.08$1,509
Jun 2004087336.106.43$5,616
May 20041521,01137.486.49$12,263
Apr 200401,18334.475.86$6,931
Mar 20041751,26234.365.53$12,992
Feb 2004080732.455.51$4,446
Jan 20041461,15132.036.30$11,927
Dec 200301,27530.266.30$8,035
Nov 20031751,03428.804.60$9,791
Oct 2003064528.174.76$3,070
Sep 200301,44326.314.75$6,853
Aug 200313890629.765.13$8,754
Jul 200301,72629.415.17$8,925
Jun 20031541,16428.565.98$11,362
May 2003801,80726.595.97$12,920
Apr 200301,39326.675.41$7,532
Mar 20031641,80331.146.10$16,098
Feb 200301,14033.487.93$9,036
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 200217695024.664.14$8,270
Oct 200201,66426.464.23$7,037
Sep 20021791,82127.443.64$11,531
Aug 20021782,34225.963.16$12,031
Jul 200202,85224.583.06$8,732
Jun 20021753,21923.733.34$14,899
May 20023463,66124.663.58$21,653
Apr 20021794,31323.653.51$19,382
Mar 20020022.003.10$0
Feb 2002177018.222.38$3,225
Jan 200201,32417.172.38$3,145
Dec 20010016.932.36$0
Nov 2001056718.072.41$1,364
Oct 2001033319.782.53$842

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2007 — as filed, then multipliedworked
Condensate           114 bbl  × $ 55.10 =     $6,281
Gas                    0 Mcf  × $  8.22 =         $0

────────────────────────────────────────────────────
Month total                                   $6,281

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/186579 is the state's own key, not one this site invented.