BROWN "A"

Operated by BRAMMER PETROLEUM, INC. (P-5 88600) in the POTTSBORO, SOUTH (V SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 195127District 09Field 72707750CondensateGasSaveExport
Value, all time
$323 k
Apr 2003 – May 2026
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
278
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 9 leases and 9 wells, and the rule below applies to all of them.

Discovered
1954-10-17
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: NET GOR RULE 1500 DGL

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,633 bbl$194,403
GasProduction33,729 Mcf$128,655
Total$323,059

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.7363, -96.6584. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.73629, -96.65842 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,461 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,461 ft.

Completions filed
Feb 1985
1 of 1 wells

1 well

42-18101879113,461 ftFeb 1985

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (278)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

278 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 202601589.753.15$47
Feb 202607263.503.75$270
Jan 202609859.138.00$784
Dec 202501156.664.41$49
Nov 202501158.593.93$43
Oct 20250259.383.30$7
Sep 20250362.743.08$9
Aug 20250463.933.01$12
Jul 20250066.743.32$0
Jun 20250266.483.13$6
May 20250060.553.23$0
Apr 202507262.363.54$255
Mar 202507667.704.27$324
Feb 202508470.884.34$365
Jan 20250074.324.28$0
Dec 2024014768.993.12$459
Nov 2024012269.052.20$268
Oct 202402471.372.28$55
Sep 202402369.612.36$54
Aug 202402475.632.06$50
Jul 202404379.932.15$92
Jun 202407678.082.63$200
May 202409878.812.20$215
Apr 202409984.451.66$164
Mar 2024015480.301.55$238
Feb 2024016276.091.78$289
Jan 202416324873.023.30$12,720
Dec 2023024071.262.61$627
Nov 2023021077.892.81$590
Oct 2023017485.443.09$537
Sep 2023022989.042.74$626
Aug 2023030980.522.67$826
Jul 2023023774.852.64$626
Jun 2023067068.962.26$1,513
May 2023023770.622.23$528
Apr 2023024378.122.24$544
Mar 20230072.852.39$0
Feb 2023014575.112.47$358
Jan 2023019776.533.39$667
Dec 2022024076.415.73$1,375
Nov 2022022385.005.65$1,259
Oct 2022018887.185.86$1,102
Sep 2022024184.888.16$1,967
Aug 2022019694.529.13$1,789
Jul 20220238101.587.54$1,795
Jun 202217045115.097.98$19,924
May 2022083109.378.43$700
Apr 20220200104.226.84$1,368
Mar 20220202108.885.08$1,025
Feb 2022021591.054.86$1,045
Jan 2022024881.844.54$1,125
Dec 2021026071.323.90$1,014
Nov 2021025577.435.24$1,335
Oct 2021028679.795.71$1,634
Sep 2021015269.865.35$813
Aug 2021018066.024.22$760
Jul 2021022470.783.98$892
Jun 2021022769.493.38$767
May 2021027063.483.02$815
Apr 2021028660.362.76$789
Mar 2021030061.302.72$815
Feb 2021018857.805.55$1,043
Jan 2021029350.412.81$823
Dec 2020028844.642.68$771
Nov 202001238.772.71$32
Oct 2020030836.972.48$763
Sep 2020031037.091.99$617
Aug 202015732139.982.39$7,042
Jul 2020028938.371.83$527
Jun 2020031134.901.69$526
May 2020031716.921.81$575
Apr 2020030914.751.80$558
Mar 2020032030.341.86$594
Feb 2020028649.881.98$566
Jan 2020030457.252.09$637
Dec 2019030459.012.30$701
Nov 2019029555.302.75$811
Oct 2019030853.472.42$745
Sep 2019030655.052.66$813
Aug 2019031753.112.30$730
Jul 201915830856.272.46$9,648
Jun 2019029752.782.49$740
May 2019029758.482.74$814
Apr 2019025262.632.75$693
Mar 2019020056.803.06$612
Feb 201902050.852.79$56
Jan 2019028346.033.23$914
Dec 2018028346.594.19$1,184
Nov 2018026952.934.24$1,140
Oct 201817025661.443.40$11,315
Sep 2018020559.543.11$637
Aug 2018017459.403.07$534
Jul 2018020465.142.93$598
Jun 2018021960.183.08$674
May 2018022865.382.90$661
Apr 2018023263.842.90$673
Mar 2018014661.222.79$407
Feb 2018016461.782.77$454
Jan 2018012762.874.01$509
Dec 2017014657.272.92$427
Nov 2017016955.423.12$527
Oct 2017015449.292.98$459
Sep 201704247.523.09$130
Aug 20172407845.373.00$11,123
Jul 2017017943.873.09$553
Jun 201709642.493.09$296
May 2017012745.373.26$414
Apr 201701147.933.21$35
Mar 20170846.772.98$24
Feb 2017012450.452.95$366
Jan 2017016849.413.42$574
Dec 2016020248.763.72$752
Nov 2016019842.492.64$524
Oct 2016017346.193.09$535
Sep 201601741.553.10$53
Aug 2016025441.442.92$743
Jul 201601141.622.92$32
Jun 201601445.352.69$38
May 201601242.521.99$24
Apr 201601436.561.99$28
Mar 201601133.011.79$20
Feb 201601126.472.06$23
Jan 201604227.352.36$99
Dec 201504132.362.00$82
Nov 20150738.792.17$15
Oct 201503843.552.43$92
Sep 201502442.992.76$66
Aug 201507240.162.87$207
Jul 20151839048.152.95$9,077
Jun 201507756.152.88$222
May 2015018855.212.96$556
Apr 2015021949.822.71$593
Mar 2015023642.892.93$693
Feb 2015018644.662.98$554
Jan 2015022443.433.10$695
Dec 2014022954.693.59$822
Nov 2014014270.464.25$604
Oct 20140778.303.90$27
Sep 2014022586.164.05$910
Aug 2014023589.394.04$948
Jul 2014014796.564.18$614
Jun 2014020298.164.74$957
May 201401194.734.73$52
Apr 20140995.944.81$43
Mar 2014016195.895.06$814
Feb 201401097.406.19$62
Jan 201401290.404.86$58
Dec 201301491.824.35$61
Nov 201301188.853.74$41
Oct 201301197.423.78$42
Sep 20130206104.113.72$766
Aug 20130150104.253.52$528
Jul 20130190102.523.72$706
Jun 201301794.403.93$67
May 20131633294.834.15$15,590
Apr 2013021093.964.28$899
Mar 201301093.623.91$39
Feb 201301091.233.42$34
Jan 201301091.603.42$34
Dec 201201286.773.42$41
Nov 201201086.953.62$36
Oct 201201389.383.40$44
Sep 2012025394.672.92$738
Aug 201201792.662.91$49
Jul 201201885.133.02$54
Jun 2012022379.822.52$562
May 201201391.612.49$32
Apr 201209101.652.00$18
Mar 20120267105.052.22$593
Feb 20120252101.102.57$648
Jan 20120098.092.73$0
Dec 20111702296.873.24$16,539
Nov 201102095.723.31$66
Oct 2011027684.983.65$1,007
Sep 201101783.623.99$68
Aug 201101583.404.15$62
Jul 201101394.144.52$59
Jun 201102392.904.64$107
May 201102598.134.40$110
Apr 20110250105.964.33$1,083
Mar 201118526296.364.06$18,890
Feb 201118021885.644.18$16,326
Jan 2011025286.504.59$1,156
Dec 2010024785.734.35$1,074
Nov 201002380.843.80$87
Oct 201002178.103.51$74
Sep 201002972.633.98$115
Aug 2010023273.684.42$1,025
Jul 201001972.554.74$90
Jun 201003170.364.91$152
May 20101771471.124.24$12,648
Apr 20100081.694.12$0
Mar 201001378.394.39$57
Feb 2010018973.585.44$1,029
Jan 201001474.365.96$84
Dec 200902171.445.48$115
Nov 2009022874.593.75$855
Oct 2009019372.544.11$793
Sep 2009019265.543.06$588
Aug 2009023867.423.22$766
Jul 200901961.133.46$66
Jun 20091805366.163.90$12,115
May 20090054.743.93$0
Apr 20090446.773.59$14
Mar 200902242.144.06$89
Feb 200901832.814.63$83
Jan 200902235.865.37$118
Dec 200801437.105.98$84
Nov 200801455.496.86$96
Oct 200802575.246.92$173
Sep 2008029101.767.88$228
Aug 200817554114.228.48$20,447
Jul 2008046131.0811.39$524
Jun 200801131.3313.03$13
May 2008017123.1711.57$197
Apr 2008033110.3110.45$345
Mar 200809101.909.66$87
Feb 200804692.538.77$403
Jan 200803990.388.21$320
Dec 200702488.337.30$175
Nov 200702191.677.29$153
Oct 200705582.856.92$381
Sep 200704475.846.24$275
Aug 200703369.066.39$211
Jul 200702870.906.39$179
Jun 200703962.007.55$294
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060256.656.92$14
Nov 200601254.207.62$91
Oct 200604154.906.01$247
Sep 200607760.085.04$388
Aug 200608668.717.34$631
Jul 20060069.376.34$0
Jun 20060366.286.38$19
May 200604366.016.42$276
Apr 2006016564.397.36$1,214
Mar 20060956.707.08$64
Feb 200601457.597.75$109
Jan 200601760.598.93$152
Dec 200501454.9413.42$188
Nov 200501954.6910.59$201
Oct 200503658.3413.80$497
Sep 200504961.4512.08$592
Aug 200509661.519.80$941
Jul 200512215355.697.84$7,994
Jun 20050852.337.38$59
May 20050845.226.65$53
Apr 20050849.207.36$59
Mar 20050850.377.15$57
Feb 200502045.226.31$126
Jan 200503743.166.32$234
Dec 200407939.866.75$533
Nov 2004010545.286.33$665
Oct 2004013749.706.52$893
Sep 2004017643.245.28$930
Aug 2004019742.375.55$1,093
Jul 2004013038.286.08$791
Jun 2004021836.106.43$1,402
May 2004013037.486.49$844
Apr 200405134.475.86$299
Mar 200407034.365.53$387
Feb 200409932.455.51$545
Jan 2004014832.036.30$932
Dec 2003017630.266.30$1,109
Nov 2003019828.804.60$910
Oct 2003019028.174.76$904
Sep 2003018126.314.75$860
Aug 2003020629.765.13$1,057
Jul 20034021029.415.17$2,262
Jun 2003017928.565.98$1,071
May 2003023726.595.97$1,416
Apr 20030026.675.41$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 89.75 =         $0
Gas                   15 Mcf  × $  3.15 =        $47

────────────────────────────────────────────────────
Month total                                      $47

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/195127 is the state's own key, not one this site invented.