SHEPPARD "A"

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the MORRIS (CONSOLIDATED CONGL.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 196330District 09Field 62970700CondensateGasSaveExport
Value, all time
$437 k
Jul 2003 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
275
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 432 leases and 514 wells, and the rule below applies to all of them.

Discovered
1974-07-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres.

The Commission's schedule remark for this field reads: SAME.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition522 bbl$19,638
GasProduction86,437 Mcf$417,268
Total$436,906

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.0980, -97.9097. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.09803, -97.90971 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,659 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,659 ft.

Completions filed
Mar 1998
1 of 1 wells

1 well

42-4973422025,659 ftMar 1998

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (275)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

275 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 202303470.622.23$76
Apr 2023026678.122.24$595
Mar 2023029872.852.39$713
Feb 2023025175.112.47$619
Jan 2023028376.533.39$959
Dec 2022026276.415.73$1,501
Nov 2022027485.005.65$1,547
Oct 2022028787.185.86$1,683
Sep 2022027784.888.16$2,261
Aug 2022028694.529.13$2,610
Jul 20220281101.587.54$2,119
Jun 20220276115.097.98$2,202
May 20220288109.378.43$2,429
Apr 20220275104.226.84$1,880
Mar 20220283108.885.08$1,437
Feb 2022025791.054.86$1,249
Jan 2022028881.844.54$1,307
Dec 2021029871.323.90$1,162
Nov 2021028877.435.24$1,508
Oct 2021029079.795.71$1,657
Sep 2021028569.865.35$1,525
Aug 2021029866.024.22$1,258
Jul 2021029070.783.98$1,155
Jun 2021028169.493.38$950
May 2021028563.483.02$860
Apr 2021027860.362.76$767
Mar 2021028861.302.72$782
Feb 2021023857.805.55$1,320
Jan 2021026750.412.81$750
Dec 2020028744.642.68$768
Nov 2020028138.772.71$761
Oct 2020028636.972.48$709
Sep 2020027737.091.99$552
Aug 2020029439.982.39$701
Jul 2020029738.371.83$542
Jun 2020028934.901.69$489
May 2020030216.921.81$548
Apr 2020029314.751.80$529
Mar 2020030330.341.86$562
Feb 2020027449.881.98$543
Jan 2020030457.252.09$637
Dec 2019029959.012.30$689
Nov 2019028955.302.75$795
Oct 2019030253.472.42$730
Sep 2019029355.052.66$779
Aug 2019030253.112.30$696
Jul 2019029956.272.46$736
Jun 2019029252.782.49$727
May 2019029858.482.74$817
Apr 2019028562.632.75$784
Mar 2019028856.803.06$882
Feb 2019026850.852.79$748
Jan 2019029546.033.23$952
Dec 2018029646.594.19$1,239
Nov 2018029552.934.24$1,250
Oct 2018031161.443.40$1,057
Sep 2018029359.543.11$911
Aug 2018030259.403.07$926
Jul 2018029965.142.93$877
Jun 2018023260.183.08$714
May 2018030965.382.90$896
Apr 2018028063.842.90$812
Mar 2018029661.222.79$825
Feb 2018026061.782.77$719
Jan 2018028862.874.01$1,155
Dec 2017029857.272.92$871
Nov 2017030455.423.12$948
Oct 2017031949.292.98$952
Sep 2017031347.523.09$966
Aug 2017032545.373.00$976
Jul 2017031943.873.09$985
Jun 2017031042.493.09$957
May 2017031545.373.26$1,028
Apr 2017030347.933.21$973
Mar 2017030946.772.98$922
Feb 2017028250.452.95$833
Jan 2017031049.413.42$1,060
Dec 2016029948.763.72$1,113
Nov 2016030342.492.64$801
Oct 2016031946.193.09$986
Sep 2016030641.553.10$949
Aug 2016031541.442.92$921
Jul 2016031741.622.92$927
Jun 2016030645.352.69$822
May 2016030442.521.99$605
Apr 2016030536.561.99$607
Mar 2016039933.011.79$716
Feb 2016032326.472.06$667
Jan 2016031527.352.36$745
Dec 2015031832.362.00$636
Nov 2015030938.792.17$670
Oct 2015032843.552.43$796
Sep 2015031042.992.76$855
Aug 2015032140.162.87$922
Jul 2015031448.152.95$925
Jun 2015031156.152.88$897
May 2015030355.212.96$896
Apr 2015030149.822.71$815
Mar 2015031642.892.93$927
Feb 2015025844.662.98$768
Jan 2015029943.433.10$927
Dec 2014030854.693.59$1,106
Nov 2014030570.464.25$1,297
Oct 2014032278.303.90$1,256
Sep 2014030186.164.05$1,218
Aug 2014031289.394.04$1,259
Jul 2014030996.564.18$1,292
Jun 2014029298.164.74$1,383
May 2014031094.734.73$1,465
Apr 2014029695.944.81$1,424
Mar 2014031095.895.06$1,568
Feb 2014026597.406.19$1,641
Jan 2014031390.404.86$1,521
Dec 2013030391.824.35$1,319
Nov 2013030488.853.74$1,136
Oct 2013031997.423.78$1,206
Sep 20130304104.113.72$1,130
Aug 20130321104.253.52$1,131
Jul 20130317102.523.72$1,179
Jun 2013031894.403.93$1,251
May 2013031994.834.15$1,324
Apr 2013030393.964.28$1,298
Mar 2013030393.623.91$1,186
Feb 2013028691.233.42$978
Jan 2013031191.603.42$1,064
Dec 2012032686.773.42$1,115
Nov 2012031086.953.62$1,124
Oct 2012033089.383.40$1,122
Sep 2012032694.672.92$951
Aug 2012034192.662.91$992
Jul 2012032085.133.02$967
Jun 2012031179.822.52$783
May 2012031591.612.49$784
Apr 20120315101.652.00$629
Mar 20120314105.052.22$698
Feb 20120303101.102.57$779
Jan 2012029998.092.73$817
Dec 2011030996.873.24$1,001
Nov 2011028595.723.31$944
Oct 2011031684.983.65$1,153
Sep 2011030383.623.99$1,208
Aug 2011032183.404.15$1,332
Jul 2011031994.144.52$1,441
Jun 2011031392.904.64$1,452
May 2011032398.134.40$1,423
Apr 20110307105.964.33$1,330
Mar 2011030196.364.06$1,221
Feb 2011027385.644.18$1,141
Jan 2011030186.504.59$1,381
Dec 2010030385.734.35$1,317
Nov 2010029080.843.80$1,101
Oct 2010032178.103.51$1,126
Sep 2010030272.633.98$1,202
Aug 2010032773.684.42$1,445
Jul 2010032472.554.74$1,535
Jun 2010031670.364.91$1,552
May 2010032771.124.24$1,385
Apr 2010030081.694.12$1,237
Mar 2010031878.394.39$1,396
Feb 2010026073.585.44$1,415
Jan 2010032674.365.96$1,944
Dec 2009025771.445.48$1,409
Nov 2009027874.593.75$1,043
Oct 2009030072.544.11$1,233
Sep 2009030365.543.06$929
Aug 2009031267.423.22$1,004
Jul 2009030661.133.46$1,060
Jun 2009030066.163.90$1,169
May 2009031454.743.93$1,233
Apr 2009029446.773.59$1,055
Mar 2009030742.144.06$1,246
Feb 2009027832.814.63$1,288
Jan 2009032335.865.37$1,735
Dec 2008031937.105.98$1,907
Nov 2008032655.496.86$2,236
Oct 2008040875.246.92$2,824
Sep 20080298101.767.88$2,347
Aug 20080316114.228.48$2,681
Jul 20080330131.0811.39$3,759
Jun 20080317131.3313.03$4,131
May 20080335123.1711.57$3,877
Apr 20080326110.3110.45$3,408
Mar 20080337101.909.66$3,257
Feb 2008030792.538.77$2,693
Jan 2008031190.388.21$2,552
Dec 2007033188.337.30$2,417
Nov 200701891.677.29$131
Oct 2007035882.856.92$2,478
Sep 2007033475.846.24$2,086
Aug 2007036069.066.39$2,300
Jul 2007031270.906.39$1,993
Jun 2007034562.007.55$2,604
May 2007033858.747.85$2,652
Apr 2007027259.617.81$2,123
Mar 2007031456.927.30$2,293
Feb 2007027655.108.22$2,268
Jan 2007026350.306.73$1,769
Dec 2006032156.656.92$2,221
Nov 2006033154.207.62$2,521
Oct 2006031654.906.01$1,900
Sep 2006030160.085.04$1,516
Aug 2006033368.717.34$2,444
Jul 20066037269.376.34$6,522
Jun 2006035366.286.38$2,254
May 2006036166.016.42$2,319
Apr 2006034964.397.36$2,569
Mar 2006035456.707.08$2,507
Feb 2006031957.597.75$2,473
Jan 2006036060.598.93$3,216
Dec 2005035254.9413.42$4,722
Nov 2005034654.6910.59$3,664
Oct 2005039458.3413.80$5,436
Sep 2005026961.4512.08$3,249
Aug 2005035161.519.80$3,439
Jul 2005036955.697.84$2,894
Jun 2005035752.337.38$2,635
May 2005037445.226.65$2,488
Apr 20059936349.207.36$7,543
Mar 2005037750.377.15$2,697
Feb 2005035445.226.31$2,234
Jan 2005037443.166.32$2,365
Dec 2004029139.866.75$1,965
Nov 2004040045.286.33$2,532
Oct 2004044649.706.52$2,906
Sep 2004043443.245.28$2,293
Aug 2004046842.375.55$2,598
Jul 2004046238.286.08$2,811
Jun 2004049036.106.43$3,152
May 2004055837.486.49$3,624
Apr 2004049934.475.86$2,923
Mar 2004076034.365.53$4,203
Feb 200401,44232.455.51$7,945
Jan 200401,63832.036.30$10,319
Dec 20031571,83730.266.30$16,327
Nov 200301,81728.804.60$8,349
Oct 20031742,08828.174.76$14,840
Sep 200302,14226.314.75$10,173
Aug 2003322,28029.765.13$12,648
Jul 2003095029.415.17$4,912

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2023 — as filed, then multipliedworked
Condensate             0 bbl  × $ 70.62 =         $0
Gas                   34 Mcf  × $  2.23 =        $76

────────────────────────────────────────────────────
Month total                                      $76

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/196330 is the state's own key, not one this site invented.