EDWARDS-MOORE

Operated by CD CONSULTING & OPERATING CO. (P-5 120043) in the BOEDEKER (CONGLOMERATE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 197875District 09Field 10105666CondensateGasSaveExport
Value, all time
$1.2 M
Aug 2003 – Jan 2019
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
186
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7 leases and 11 wells, and the rule below applies to all of them.

Discovered
1953-02-18
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,639 bbl$111,445
GasProduction167,629 Mcf$1,126,560
Total$1,238,004

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.5488, -97.8768. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.54882, -97.87678 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,900 ft
1 wells filed one
Completion to plug
32.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,900 ft.

Completions filed
May 1985
1 of 1 wells
Plug dates filed
Jan 2018
1 of 1 wells

Last completion to plug: a median of 32.7 years across the 1 well that filed both dates, with the middle half between 32.7 years and 32.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3373223926,900 ftMay 1985Jan 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (186)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

186 months

Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 201863061.443.40$3,871
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 201704850.452.95$142
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 2015018942.992.76$521
Aug 2015013240.162.87$379
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 201401,40795.895.06$7,115
Feb 20141731,95697.406.19$28,962
Jan 201402,15490.404.86$10,470
Dec 201302,10091.824.35$9,144
Nov 201301,91288.853.74$7,148
Oct 201301,64897.423.78$6,228
Sep 201301,291104.113.72$4,800
Aug 201301,154104.253.52$4,065
Jul 20130679102.523.72$2,524
Jun 2013033394.403.93$1,310
May 2013038094.834.15$1,577
Apr 2013031393.964.28$1,340
Mar 2013010393.623.91$403
Feb 201309391.233.42$318
Jan 2013036891.603.42$1,259
Dec 2012063286.773.42$2,162
Nov 2012035386.953.62$1,280
Oct 201216755189.383.40$16,800
Sep 2012045594.672.92$1,328
Aug 2012050892.662.91$1,477
Jul 2012077085.133.02$2,326
Jun 2012072579.822.52$1,826
May 2012085691.612.49$2,130
Apr 20120957101.652.00$1,911
Mar 201201,136105.052.22$2,524
Feb 20120687101.102.57$1,766
Jan 201201,62698.092.73$4,446
Dec 201101,08696.873.24$3,518
Nov 201101,16695.723.31$3,861
Oct 2011078184.983.65$2,850
Sep 2011093683.623.99$3,731
Aug 2011066783.404.15$2,768
Jul 2011062594.144.52$2,823
Jun 2011086392.904.64$4,004
May 201101,87698.134.40$8,263
Apr 201102,568105.964.33$11,128
Mar 201101,34496.364.06$5,453
Feb 2011032585.644.18$1,358
Jan 2011019086.504.59$872
Dec 2010034485.734.35$1,496
Nov 2010064380.843.80$2,440
Oct 2010010678.103.51$372
Sep 2010032372.633.98$1,285
Aug 2010031573.684.42$1,392
Jul 2010061772.554.74$2,922
Jun 201001170.364.91$54
May 2010025771.124.24$1,088
Apr 2010034081.694.12$1,402
Mar 2010051678.394.39$2,265
Feb 2010048073.585.44$2,612
Jan 2010069174.365.96$4,121
Dec 2009068971.445.48$3,778
Nov 20091611,25374.593.75$16,710
Oct 2009099872.544.11$4,102
Sep 200901,48365.543.06$4,545
Aug 200902,82367.423.22$9,086
Jul 2009092461.133.46$3,201
Jun 2009056566.163.90$2,201
May 2009098054.743.93$3,847
Apr 200901,59246.773.59$5,711
Mar 200902,75542.144.06$11,183
Feb 200902,53332.814.63$11,735
Jan 200902,75635.865.37$14,802
Dec 200802,71837.105.98$16,246
Nov 200802,80955.496.86$19,271
Oct 20081551,94075.246.92$25,091
Sep 200802,245101.767.88$17,684
Aug 200803,140114.228.48$26,637
Jul 200803,168131.0811.39$36,082
Jun 200802,846131.3313.03$37,091
May 200802,055123.1711.57$23,785
Apr 20080688110.3110.45$7,193
Mar 20080420101.909.66$4,059
Feb 200802292.538.77$193
Jan 2008015790.388.21$1,288
Dec 2007023288.337.30$1,694
Nov 2007023191.677.29$1,684
Oct 2007051682.856.92$3,572
Sep 2007034875.846.24$2,173
Aug 2007026569.066.39$1,693
Jul 2007041570.906.39$2,651
Jun 2007052462.007.55$3,955
May 2007092758.747.85$7,274
Apr 200714147059.617.81$12,073
Mar 2007061056.927.30$4,454
Feb 2007083055.108.22$6,819
Jan 2007081750.306.73$5,496
Dec 200601,06756.656.92$7,382
Nov 200601,58254.207.62$12,051
Oct 200603,17254.906.01$19,076
Sep 200603,16260.085.04$15,928
Aug 200602,12968.717.34$15,627
Jul 200602,12969.376.34$13,504
Jun 200603,41266.286.38$21,782
May 200605,18766.016.42$33,326
Apr 20061572,09564.397.36$25,529
Mar 200602,79456.707.08$19,790
Feb 200602,05957.597.75$15,960
Jan 200604,55160.598.93$40,656
Dec 200502,24754.9413.42$30,144
Nov 200504,07754.6910.59$43,169
Oct 200503,93158.3413.80$54,231
Sep 20051564,65661.4512.08$65,826
Aug 200505,20161.519.80$50,953
Jul 20051705,97455.697.84$56,325
Jun 20051655,73352.337.38$50,950
May 20051311,31545.226.65$14,670
Apr 2005044649.207.36$3,283
Mar 200501,47750.377.15$10,568
Feb 200501,24345.226.31$7,846
Jan 2005063443.166.32$4,008
Dec 200401,70339.866.75$11,497
Nov 200401,36745.286.33$8,654
Oct 200401,05349.706.52$6,860
Sep 2004084743.245.28$4,475
Aug 200401,28642.375.55$7,138
Jul 200402138.286.08$128
Jun 20040236.106.43$13
May 200401737.486.49$110
Apr 200402034.475.86$117
Mar 20040834.365.53$44
Feb 2004012732.455.51$700
Jan 200409932.036.30$624
Dec 200305130.266.30$321
Nov 200308728.804.60$400
Oct 200308628.174.76$409
Sep 2003013626.314.75$646
Aug 2003011629.765.13$595

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2018 — as filed, then multipliedworked
Condensate            63 bbl  × $ 61.44 =     $3,871
Gas                    0 Mcf  × $  3.40 =         $0

────────────────────────────────────────────────────
Month total                                   $3,871

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/197875 is the state's own key, not one this site invented.