MUELLER

Operated by STAMPER OPERATING CO., INC. (P-5 812133) in the BARFIELD (CONGLOMERATE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 202433District 09Field 05668500CondensateGasSaveExport
Value, all time
$128 k
Jun 2004 – Aug 2012
Value, last 12 filed months
$19
at the published price for each month
Months reported
99
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 43 leases and 47 wells, and the rule below applies to all of them.

Discovered
1982-03-20
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 08/01/85.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition288 bbl$14,008
GasProduction15,154 Mcf$113,873
Total$127,880

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.4124, -98.0814. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.41237, -98.08139 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,843 ft
1 wells filed one
Completion to plug
27.9 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,843 ft.

Completions filed
Sep 1984
1 of 1 wells
Plug dates filed
Aug 2012
1 of 1 wells

Last completion to plug: a median of 27.9 years across the 1 well that filed both dates, with the middle half between 27.9 years and 27.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2373618415,843 ftSep 1984Aug 2012Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (99)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

99 months

Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110696.873.24$19
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20091189971.445.48$8,973
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 2009027965.543.06$855
Aug 2009029567.423.22$949
Jul 200906661.133.46$229
Jun 2009021366.163.90$830
May 2009039254.743.93$1,539
Apr 2009039746.773.59$1,424
Mar 2009040342.144.06$1,636
Feb 200917040332.814.63$7,445
Jan 2009046735.865.37$2,508
Dec 2008032337.105.98$1,931
Nov 2008050055.496.86$3,430
Oct 2008056475.246.92$3,904
Sep 20080594101.767.88$4,679
Aug 20080846114.228.48$7,177
Jul 200801,035131.0811.39$11,788
Jun 20080179131.3313.03$2,333
May 20080110123.1711.57$1,273
Apr 20080112110.3110.45$1,171
Mar 20080120101.909.66$1,160
Feb 2008012292.538.77$1,070
Jan 2008013190.388.21$1,075
Dec 2007013688.337.30$993
Nov 2007013791.677.29$999
Oct 2007011982.856.92$824
Sep 200709775.846.24$606
Aug 200708269.066.39$524
Jul 2007010070.906.39$639
Jun 2007010662.007.55$800
May 2007011658.747.85$910
Apr 2007012659.617.81$983
Mar 2007013156.927.30$957
Feb 2007013855.108.22$1,134
Jan 2007014350.306.73$962
Dec 2006014656.656.92$1,010
Nov 2006014654.207.62$1,112
Oct 2006011954.906.01$716
Sep 2006012760.085.04$640
Aug 200609068.717.34$661
Jul 200607469.376.34$469
Jun 2006013166.286.38$836
May 2006020066.016.42$1,285
Apr 2006023064.397.36$1,693
Mar 2006030456.707.08$2,153
Feb 2006030257.597.75$2,341
Jan 2006044360.598.93$3,957
Dec 2005041754.9413.42$5,594
Nov 2005061054.6910.59$6,459
Oct 2005039358.3413.80$5,422
Sep 200506261.4512.08$749
Aug 200506561.519.80$637
Jul 200508355.697.84$651
Jun 2005013252.337.38$974
May 2005017645.226.65$1,171
Apr 2005016449.207.36$1,207
Mar 2005017250.377.15$1,231
Feb 2005015145.226.31$953
Jan 2005018443.166.32$1,163
Dec 2004018239.866.75$1,229
Nov 2004017945.286.33$1,133
Oct 2004018249.706.52$1,186
Sep 2004014943.245.28$787
Aug 2004015242.375.55$844
Jul 2004015038.286.08$913
Jun 2004015236.106.43$978

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2011 — as filed, then multipliedworked
Condensate             0 bbl  × $ 96.87 =         $0
Gas                    6 Mcf  × $  3.24 =        $19

────────────────────────────────────────────────────
Month total                                      $19

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/202433 is the state's own key, not one this site invented.