COWLING, E. P.

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the BRIDGEPORT (TIDWELL) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 203392District 09Field 11887913CondensateGasSaveExport
Value, all time
$252 k
Aug 2004 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
262
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 28 leases and 31 wells, and the rule below applies to all of them.

Discovered
1963-06-20
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA SUSPENDED ADMINISTRATIVELY EFFECTIVE 9/1/94.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition65 bbl$4,509
GasProduction47,267 Mcf$247,216
Total$251,725

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.2136, -97.7796. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.21359, -97.77960 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,000 ft.

Completions filed
Mar 1993
1 of 1 wells

1 well

42-4973377666,000 ftMar 1993

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (262)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

262 months

May 2026063106.413.05$192
Apr 202606298.932.87$178
Mar 202606989.753.15$217
Feb 202604963.503.75$184
Jan 202604759.138.00$376
Dec 202505856.664.41$256
Nov 202506058.593.93$236
Oct 202504359.383.30$142
Sep 202506562.743.08$200
Aug 202506663.933.01$199
Jul 202505666.743.32$186
Jun 202506166.483.13$191
May 202506760.553.23$217
Apr 202506462.363.54$227
Mar 202507067.704.27$299
Feb 202505870.884.34$252
Jan 202505974.324.28$252
Dec 202406268.993.12$194
Nov 202407069.052.20$154
Oct 202407471.372.28$169
Sep 202407169.612.36$168
Aug 202407575.632.06$155
Jul 202406879.932.15$146
Jun 202406378.082.63$166
May 202407278.812.20$158
Apr 202406784.451.66$111
Mar 202407480.301.55$114
Feb 202406076.091.78$107
Jan 202406973.023.30$228
Dec 202306571.262.61$170
Nov 202306977.892.81$194
Oct 202307585.443.09$232
Sep 202307789.042.74$211
Aug 202307180.522.67$190
Jul 202307374.852.64$193
Jun 202307168.962.26$160
May 202308070.622.23$178
Apr 202307978.122.24$177
Mar 202308472.852.39$201
Feb 202307275.112.47$178
Jan 202307576.533.39$254
Dec 202208476.415.73$481
Nov 202209285.005.65$519
Oct 202209387.185.86$545
Sep 202209584.888.16$776
Aug 202208594.529.13$776
Jul 2022084101.587.54$634
Jun 2022079115.097.98$630
May 20220108109.378.43$911
Apr 20220100104.226.84$684
Mar 20220110108.885.08$558
Feb 2022010591.054.86$510
Jan 2022011481.844.54$517
Dec 2021011271.323.90$437
Nov 2021010577.435.24$550
Oct 2021011279.795.71$640
Sep 2021011269.865.35$599
Aug 2021011666.024.22$490
Jul 2021011770.783.98$466
Jun 2021011869.493.38$399
May 2021012263.483.02$368
Apr 2021010860.362.76$298
Mar 2021011861.302.72$321
Feb 2021010057.805.55$555
Jan 2021012450.412.81$348
Dec 2020012144.642.68$324
Nov 2020011638.772.71$314
Oct 2020011936.972.48$295
Sep 2020011237.091.99$223
Aug 2020012339.982.39$293
Jul 2020012538.371.83$228
Jun 2020012434.901.69$210
May 2020012516.921.81$227
Apr 2020011814.751.80$213
Mar 2020012030.341.86$223
Feb 2020010349.881.98$204
Jan 2020011257.252.09$235
Dec 2019012659.012.30$290
Nov 2019011755.302.75$322
Oct 2019012053.472.42$290
Sep 2019012855.052.66$340
Aug 201909253.112.30$212
Jul 2019012256.272.46$300
Jun 2019012152.782.49$301
May 2019012858.482.74$351
Apr 2019012262.632.75$336
Mar 2019012856.803.06$392
Feb 20190050.852.79$0
Jan 2019012446.033.23$400
Dec 2018011546.594.19$481
Nov 2018010052.934.24$424
Oct 201807961.443.40$268
Sep 201807359.543.11$227
Aug 201807359.403.07$224
Jul 201807565.142.93$220
Jun 201809260.183.08$283
May 201809765.382.90$281
Apr 201809463.842.90$273
Mar 201808861.222.79$245
Feb 201805661.782.77$155
Jan 201808662.874.01$345
Dec 201709157.272.92$266
Nov 201709655.423.12$299
Oct 2017011649.292.98$346
Sep 2017011947.523.09$367
Aug 2017013045.373.00$391
Jul 2017013343.873.09$411
Jun 2017013242.493.09$408
May 2017014145.373.26$460
Apr 2017012647.933.21$405
Mar 2017012946.772.98$385
Feb 2017011450.452.95$337
Jan 2017012549.413.42$427
Dec 2016013048.763.72$484
Nov 2016012342.492.64$325
Oct 2016011946.193.09$368
Sep 2016011541.553.10$357
Aug 2016011741.442.92$342
Jul 2016012641.622.92$368
Jun 2016011345.352.69$304
May 2016013242.521.99$263
Apr 2016015336.561.99$305
Mar 2016016133.011.79$289
Feb 2016015126.472.06$312
Jan 2016015727.352.36$371
Dec 2015014932.362.00$298
Nov 2015014938.792.17$323
Oct 2015015443.552.43$374
Sep 2015014542.992.76$400
Aug 2015014140.162.87$405
Jul 2015015648.152.95$459
Jun 2015014956.152.88$430
May 2015015555.212.96$458
Apr 2015015749.822.71$425
Mar 2015016842.892.93$493
Feb 2015014544.662.98$432
Jan 2015016843.433.10$521
Dec 2014013754.693.59$492
Nov 2014014770.464.25$625
Oct 2014014578.303.90$566
Sep 2014014686.164.05$591
Aug 2014014889.394.04$597
Jul 2014016096.564.18$669
Jun 2014013998.164.74$658
May 2014015594.734.73$733
Apr 2014015195.944.81$726
Mar 2014018495.895.06$930
Feb 2014015697.406.19$966
Jan 2014019390.404.86$938
Dec 2013018291.824.35$793
Nov 2013016688.853.74$621
Oct 2013016797.423.78$631
Sep 20130188104.113.72$699
Aug 20130219104.253.52$771
Jul 20130211102.523.72$784
Jun 2013020894.403.93$818
May 2013021094.834.15$871
Apr 2013020693.964.28$882
Mar 2013021593.623.91$841
Feb 2013019191.233.42$653
Jan 2013021591.603.42$735
Dec 2012021186.773.42$722
Nov 2012019786.953.62$714
Oct 2012020189.383.40$683
Sep 2012020294.672.92$590
Aug 2012021292.662.91$617
Jul 2012021385.133.02$643
Jun 2012020279.822.52$509
May 2012020091.612.49$498
Apr 20120210101.652.00$419
Mar 20120218105.052.22$484
Feb 20120206101.102.57$529
Jan 2012022298.092.73$607
Dec 2011022796.873.24$735
Nov 2011020495.723.31$676
Oct 2011021984.983.65$799
Sep 2011023283.623.99$925
Aug 2011022883.404.15$946
Jul 2011022894.144.52$1,030
Jun 2011022192.904.64$1,025
May 2011024898.134.40$1,092
Apr 20110234105.964.33$1,014
Mar 2011024096.364.06$974
Feb 2011021485.644.18$895
Jan 2011025186.504.59$1,152
Dec 2010025285.734.35$1,096
Nov 2010025080.843.80$949
Oct 2010026278.103.51$919
Sep 2010021872.633.98$868
Aug 2010026173.684.42$1,153
Jul 2010031472.554.74$1,487
Jun 2010015470.364.91$756
May 2010016771.124.24$707
Apr 2010023981.694.12$985
Mar 2010028578.394.39$1,251
Feb 2010024273.585.44$1,317
Jan 2010026874.365.96$1,598
Dec 2009022771.445.48$1,245
Nov 2009025274.593.75$945
Oct 2009024872.544.11$1,019
Sep 2009023065.543.06$705
Aug 2009024267.423.22$779
Jul 2009029161.133.46$1,008
Jun 2009021566.163.90$837
May 2009026954.743.93$1,056
Apr 2009027046.773.59$969
Mar 2009025242.144.06$1,023
Feb 2009020832.814.63$964
Jan 2009031335.865.37$1,681
Dec 2008030237.105.98$1,805
Nov 2008028955.496.86$1,983
Oct 2008029075.246.92$2,007
Sep 20080261101.767.88$2,056
Aug 20080296114.228.48$2,511
Jul 20080260131.0811.39$2,961
Jun 20080292131.3313.03$3,806
May 20080271123.1711.57$3,137
Apr 20080288110.3110.45$3,011
Mar 20080310101.909.66$2,996
Feb 2008029692.538.77$2,596
Jan 2008031490.388.21$2,577
Dec 2007032388.337.30$2,359
Nov 2007031591.677.29$2,297
Oct 2007031882.856.92$2,201
Sep 2007028375.846.24$1,767
Aug 2007030669.066.39$1,955
Jul 2007018370.906.39$1,169
Jun 2007031462.007.55$2,370
May 2007031158.747.85$2,440
Apr 2007024259.617.81$1,889
Mar 2007024956.927.30$1,818
Feb 2007021055.108.22$1,725
Jan 2007027550.306.73$1,850
Dec 2006027056.656.92$1,868
Nov 2006030154.207.62$2,293
Oct 2006030954.906.01$1,858
Sep 2006031160.085.04$1,567
Aug 2006033468.717.34$2,452
Jul 20066534069.376.34$6,666
Jun 2006030366.286.38$1,934
May 2006035466.016.42$2,274
Apr 2006034864.397.36$2,561
Mar 2006037256.707.08$2,635
Feb 2006036557.597.75$2,829
Jan 2006043460.598.93$3,877
Dec 2005038854.9413.42$5,205
Nov 2005039754.6910.59$4,204
Oct 2005047058.3413.80$6,484
Sep 2005032961.4512.08$3,974
Aug 2005043461.519.80$4,252
Jul 2005044555.697.84$3,490
Jun 2005043852.337.38$3,233
May 2005045045.226.65$2,993
Apr 2005043749.207.36$3,217
Mar 2005039650.377.15$2,833
Feb 2005037945.226.31$2,392
Jan 2005040243.166.32$2,542
Dec 2004040739.866.75$2,748
Nov 2004040445.286.33$2,557
Oct 2004044349.706.52$2,886
Sep 2004044443.245.28$2,346
Aug 2004045242.375.55$2,509

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   63 Mcf  × $  3.05 =       $192

────────────────────────────────────────────────────
Month total                                     $192

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/203392 is the state's own key, not one this site invented.