CITY OF BRIDGEPORT

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the MORRIS (CONSOLIDATED CONGL.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 205671District 09Field 62970700CondensateGasSaveExport
Value, all time
$625 k
Jan 2004 – May 2026
Value, last 12 filed months
$13 k
at the published price for each month
Months reported
269
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 432 leases and 514 wells, and the rule below applies to all of them.

Discovered
1974-07-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres.

The Commission's schedule remark for this field reads: SAME.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition628 bbl$50,178
GasProduction121,679 Mcf$574,468
Total$624,645

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.2001, -97.7506. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.20012, -97.75061 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,090 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,090 ft.

Completions filed
Mar 1994
1 of 1 wells

1 well

42-4973388236,090 ftMar 1994

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (269)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

269 months

May 20260243106.413.05$740
Apr 2026029298.932.87$838
Mar 2026025989.753.15$816
Feb 2026024663.503.75$923
Jan 2026032459.138.00$2,591
Dec 2025031456.664.41$1,386
Nov 2025025558.593.93$1,001
Oct 2025027159.383.30$896
Sep 2025029462.743.08$905
Aug 2025032363.933.01$974
Jul 2025033466.743.32$1,107
Jun 2025030566.483.13$954
May 2025033760.553.23$1,089
Apr 2025032562.363.54$1,152
Mar 2025026267.704.27$1,118
Feb 2025029370.884.34$1,272
Jan 2025031974.324.28$1,365
Dec 2024034568.993.12$1,077
Nov 2024032869.052.20$721
Oct 2024034771.372.28$792
Sep 2024033369.612.36$787
Aug 2024030675.632.06$631
Jul 2024029079.932.15$623
Jun 2024032278.082.63$848
May 2024035578.812.20$780
Apr 2024032984.451.66$546
Mar 2024034380.301.55$530
Feb 2024031476.091.78$560
Jan 2024027873.023.30$917
Dec 2023031671.262.61$825
Nov 2023031277.892.81$876
Oct 2023033985.443.09$1,047
Sep 2023033389.042.74$911
Aug 2023033380.522.67$890
Jul 2023034474.852.64$909
Jun 2023033268.962.26$750
May 2023033270.622.23$740
Apr 2023032078.122.24$716
Mar 2023030372.852.39$725
Feb 2023034675.112.47$853
Jan 2023032476.533.39$1,098
Dec 2022027376.415.73$1,564
Nov 2022033485.005.65$1,886
Oct 2022035287.185.86$2,064
Sep 2022041184.888.16$3,355
Aug 2022011094.529.13$1,004
Jul 20220302101.587.54$2,278
Jun 20220297115.097.98$2,369
May 20220336109.378.43$2,834
Apr 20220326104.226.84$2,229
Mar 20220368108.885.08$1,868
Feb 2022036291.054.86$1,759
Jan 2022035881.844.54$1,624
Dec 2021036471.323.90$1,419
Nov 2021033677.435.24$1,760
Oct 2021037979.795.71$2,166
Sep 2021036269.865.35$1,937
Aug 2021035066.024.22$1,477
Jul 2021034870.783.98$1,386
Jun 2021035269.493.38$1,190
May 2021036963.483.02$1,114
Apr 2021037160.362.76$1,023
Mar 2021040161.302.72$1,089
Feb 2021018757.805.55$1,037
Jan 2021038150.412.81$1,071
Dec 2020038944.642.68$1,041
Nov 2020036438.772.71$985
Oct 2020036236.972.48$897
Sep 2020036537.091.99$727
Aug 2020036739.982.39$875
Jul 2020037238.371.83$679
Jun 2020037034.901.69$625
May 2020034116.921.81$619
Apr 2020036114.751.80$651
Mar 2020037530.341.86$696
Feb 2020034149.881.98$675
Jan 2020038857.252.09$813
Dec 2019037459.012.30$862
Nov 2019037655.302.75$1,034
Oct 2019039053.472.42$943
Sep 2019038555.052.66$1,023
Aug 2019039353.112.30$906
Jul 2019039556.272.46$972
Jun 2019038152.782.49$949
May 2019041758.482.74$1,143
Apr 2019039362.632.75$1,081
Mar 2019043956.803.06$1,344
Feb 20190050.852.79$0
Jan 2019041246.033.23$1,330
Dec 2018041346.594.19$1,729
Nov 2018039452.934.24$1,669
Oct 2018041961.443.40$1,424
Sep 2018041359.543.11$1,284
Aug 2018038359.403.07$1,174
Jul 2018041265.142.93$1,208
Jun 2018033960.183.08$1,043
May 2018040465.382.90$1,172
Apr 2018039163.842.90$1,134
Mar 2018042461.222.79$1,182
Feb 2018036261.782.77$1,001
Jan 2018046762.874.01$1,872
Dec 2017043257.272.92$1,262
Nov 2017043355.423.12$1,350
Oct 2017043749.292.98$1,304
Sep 2017043247.523.09$1,334
Aug 2017044445.373.00$1,334
Jul 2017042243.873.09$1,303
Jun 2017041342.493.09$1,275
May 2017043245.373.26$1,410
Apr 2017042447.933.21$1,362
Mar 2017043546.772.98$1,298
Feb 2017040350.452.95$1,190
Jan 2017041949.413.42$1,432
Dec 2016046748.763.72$1,739
Nov 2016045742.492.64$1,208
Oct 2016046746.193.09$1,443
Sep 2016044541.553.10$1,380
Aug 2016043341.442.92$1,266
Jul 2016042041.622.92$1,228
Jun 2016041745.352.69$1,120
May 2016240442.521.99$889
Apr 20164841836.561.99$2,587
Mar 2016044533.011.79$798
Feb 2016042126.472.06$869
Jan 2016045327.352.36$1,071
Dec 2015048932.362.00$979
Nov 2015045638.792.17$988
Oct 2015045043.552.43$1,092
Sep 2015039642.992.76$1,092
Aug 2015038640.162.87$1,109
Jul 2015042348.152.95$1,246
Jun 2015041756.152.88$1,202
May 2015042255.212.96$1,247
Apr 2015040049.822.71$1,083
Mar 2015044642.892.93$1,309
Feb 2015045644.662.98$1,357
Jan 2015045743.433.10$1,417
Dec 2014050954.693.59$1,828
Nov 2014046570.464.25$1,977
Oct 2014049878.303.90$1,943
Sep 2014048186.164.05$1,946
Aug 2014044789.394.04$1,804
Jul 2014042196.564.18$1,760
Jun 2014040898.164.74$1,933
May 2014040294.734.73$1,900
Apr 2014042695.944.81$2,049
Mar 2014047695.895.06$2,407
Feb 2014048397.406.19$2,991
Jan 2014046490.404.86$2,255
Dec 2013048091.824.35$2,090
Nov 2013021188.853.74$789
Oct 2013042297.423.78$1,595
Sep 20130387104.113.72$1,439
Aug 20130451104.253.52$1,589
Jul 20130459102.523.72$1,706
Jun 2013038194.403.93$1,499
May 2013041194.834.15$1,705
Apr 2013040593.964.28$1,734
Mar 2013045793.623.91$1,788
Feb 2013039791.233.42$1,358
Jan 2013052491.603.42$1,792
Dec 2012057586.773.42$1,967
Nov 2012048386.953.62$1,751
Oct 2012049389.383.40$1,676
Sep 2012048794.672.92$1,421
Aug 2012048792.662.91$1,416
Jul 2012045585.133.02$1,374
Jun 2012049879.822.52$1,254
May 2012033691.612.49$836
Apr 20120475101.652.00$948
Mar 20120435105.052.22$967
Feb 20120438101.102.57$1,126
Jan 2012072298.092.73$1,974
Dec 201102,31296.873.24$7,490
Nov 2011052695.723.31$1,742
Oct 2011047384.983.65$1,726
Sep 2011050483.623.99$2,009
Aug 2011047083.404.15$1,950
Jul 2011043094.144.52$1,942
Jun 2011036192.904.64$1,675
May 2011036898.134.40$1,621
Apr 20110346105.964.33$1,499
Mar 2011047696.364.06$1,931
Feb 2011038985.644.18$1,626
Jan 2011049786.504.59$2,281
Dec 2010041585.734.35$1,804
Nov 2010046180.843.80$1,750
Oct 2010047478.103.51$1,663
Sep 2010046572.633.98$1,850
Aug 201011755273.684.42$11,060
Jul 2010051872.554.74$2,454
Jun 2010043670.364.91$2,141
May 2010050471.124.24$2,135
Apr 2010048781.694.12$2,008
Mar 2010050978.394.39$2,234
Feb 2010045173.585.44$2,455
Jan 2010036574.365.96$2,177
Dec 2009048471.445.48$2,654
Nov 2009049774.593.75$1,865
Oct 2009053672.544.11$2,203
Sep 2009057665.543.06$1,765
Aug 2009054867.423.22$1,764
Jul 2009056161.133.46$1,944
Jun 2009052666.163.90$2,049
May 2009048154.743.93$1,888
Apr 2009056746.773.59$2,034
Mar 2009060042.144.06$2,435
Feb 2009047132.814.63$2,182
Jan 2009056935.865.37$3,056
Dec 2008042337.105.98$2,528
Nov 2008034155.496.86$2,339
Oct 2008053175.246.92$3,676
Sep 20080525101.767.88$4,135
Aug 20080602114.228.48$5,107
Jul 20080502131.0811.39$5,717
Jun 2008151588131.3313.03$27,494
May 20080563123.1711.57$6,516
Apr 20080572110.3110.45$5,980
Mar 20080563101.909.66$5,441
Feb 2008050892.538.77$4,455
Jan 2008060990.388.21$4,997
Dec 2007056288.337.30$4,104
Nov 2007055791.677.29$4,061
Oct 200712359782.856.92$14,323
Sep 2007059875.846.24$3,734
Aug 2007054669.066.39$3,488
Jul 2007063770.906.39$4,069
Jun 2007059562.007.55$4,491
May 2007057758.747.85$4,527
Apr 2007053559.617.81$4,176
Mar 2007049456.927.30$3,607
Feb 2007047055.108.22$3,862
Jan 2007047550.306.73$3,195
Dec 2006052156.656.92$3,605
Nov 2006046854.207.62$3,565
Oct 2006057154.906.01$3,434
Sep 2006059160.085.04$2,977
Aug 2006060068.717.34$4,404
Jul 2006064569.376.34$4,091
Jun 2006061466.286.38$3,920
May 2006062366.016.42$4,003
Apr 2006061464.397.36$4,519
Mar 200612063556.707.08$11,302
Feb 2006057957.597.75$4,488
Jan 2006065060.598.93$5,807
Dec 2005065454.9413.42$8,774
Nov 2005065854.6910.59$6,967
Oct 2005062558.3413.80$8,622
Sep 2005063761.4512.08$7,694
Aug 2005047461.519.80$4,644
Jul 2005061055.697.84$4,785
Jun 2005065452.337.38$4,827
May 2005068345.226.65$4,543
Apr 2005065049.207.36$4,784
Mar 2005067550.377.15$4,830
Feb 2005064345.226.31$4,059
Jan 20056772643.166.32$7,482
Dec 2004070039.866.75$4,726
Nov 2004071745.286.33$4,539
Oct 2004072249.706.52$4,704
Sep 2004073043.245.28$3,857
Aug 2004073142.375.55$4,058
Jul 2004074738.286.08$4,545
Jun 2004070636.106.43$4,542
May 2004074237.486.49$4,819
Apr 2004074634.475.86$4,370
Mar 2004086234.365.53$4,767
Feb 2004031332.455.51$1,725
Jan 2004064832.036.30$4,082

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  243 Mcf  × $  3.05 =       $740

────────────────────────────────────────────────────
Month total                                     $740

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/205671 is the state's own key, not one this site invented.