INGLISH SISTERS

Operated by OLEUM PARTNERS, LLC (P-5 100287) in the NEWARK, EAST (BARNETT SHALE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 224894District 09Field 652802002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.4 M
Dec 2005 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
246
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 21,881 leases and 22,468 wells, and the rule below applies to all of them.

Discovered
1981-10-15
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2009-09-29.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-02-25188377
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition10,309 bbl$679,296
GasProduction108,617 Mcf$754,325
Total$1,433,621

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.4725, -97.4303. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.47247, -97.43028 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,851 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,851 ft.

Completions filed
Jan 2006
1 of 1 wells

1 well

42-0973373628,851 ftJan 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (246)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

246 months

May 202602106.413.05$6
Apr 202601598.932.87$43
Mar 20260389.753.15$9
Feb 202605563.503.75$206
Jan 20260059.138.00$0
Dec 202508256.664.41$362
Nov 2025020458.593.93$801
Oct 2025036659.383.30$1,210
Sep 2025018362.743.08$563
Aug 202505363.933.01$160
Jul 202502566.743.32$83
Jun 202502266.483.13$69
May 202505360.553.23$171
Apr 202505562.363.54$195
Mar 202503367.704.27$141
Feb 202504270.884.34$182
Jan 20250174.324.28$4
Dec 202402068.993.12$62
Nov 202402169.052.20$46
Oct 202403471.372.28$78
Sep 202401869.612.36$43
Aug 202402675.632.06$54
Jul 202401279.932.15$26
Jun 202401278.082.63$32
May 2024015878.812.20$347
Apr 2024032484.451.66$538
Mar 2024033580.301.55$518
Feb 2024027476.091.78$489
Jan 2024016073.023.30$528
Dec 202308371.262.61$217
Nov 202307077.892.81$197
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 202304474.852.64$116
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 2022100115.097.98$1,151
May 202201109.378.43$8
Apr 202201104.226.84$7
Mar 202201108.885.08$5
Feb 20220191.054.86$5
Jan 20220181.844.54$5
Dec 20210171.323.90$4
Nov 20210177.435.24$5
Oct 20210179.795.71$6
Sep 20210169.865.35$5
Aug 20210166.024.22$4
Jul 202135170.783.98$2,481
Jun 20210169.493.38$3
May 202124163.483.02$1,527
Apr 20210160.362.76$3
Mar 20210161.302.72$3
Feb 20210157.805.55$6
Jan 20210150.412.81$3
Dec 20200144.642.68$3
Nov 20200138.772.71$3
Oct 202040136.972.48$1,481
Sep 20200137.091.99$2
Aug 20200139.982.39$2
Jul 202039138.371.83$1,498
Jun 20200134.901.69$2
May 20200116.921.81$2
Apr 20200114.751.80$2
Mar 20200130.341.86$2
Feb 20200149.881.98$2
Jan 20200157.252.09$2
Dec 20190159.012.30$2
Nov 20190155.302.75$3
Oct 20190153.472.42$2
Sep 20190155.052.66$3
Aug 20190153.112.30$2
Jul 201944156.272.46$2,478
Jun 20190152.782.49$2
May 20190158.482.74$3
Apr 20190862.632.75$22
Mar 20190556.803.06$15
Feb 201904350.852.79$120
Jan 201909446.033.23$303
Dec 2018212346.594.19$1,075
Nov 2018151052.934.24$836
Oct 20180061.443.40$0
Sep 201805059.543.11$155
Aug 2018395259.403.07$2,476
Jul 201805865.142.93$170
Jun 201805060.183.08$154
May 201805565.382.90$160
Apr 201807563.842.90$218
Mar 20187527461.222.79$5,355
Feb 2018032261.782.77$891
Jan 2018010962.874.01$437
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 201739049.292.98$1,922
Sep 201704447.523.09$136
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 201716046.772.98$748
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 201604242.492.64$111
Oct 201602246.193.09$68
Sep 20160041.553.10$0
Aug 20161509441.442.92$6,491
Jul 20161141.622.92$45
Jun 20160045.352.69$0
May 20161142.521.99$45
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 201608627.352.36$203
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 201516917742.892.93$7,768
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 201202985.133.02$88
Jun 201208879.822.52$222
May 201207991.612.49$197
Apr 201217398101.652.00$17,781
Mar 2012097105.052.22$216
Feb 2012096101.102.57$247
Jan 2012013498.092.73$366
Dec 2011013496.873.24$434
Nov 2011014195.723.31$467
Oct 2011014484.983.65$525
Sep 2011012283.623.99$486
Aug 201109483.404.15$390
Jul 2011011594.144.52$519
Jun 2011011692.904.64$538
May 2011011798.134.40$515
Apr 20110121105.964.33$524
Mar 2011012196.364.06$491
Feb 2011011285.644.18$468
Jan 2011013986.504.59$638
Dec 2010014285.734.35$617
Nov 2010013980.843.80$528
Oct 2010014178.103.51$495
Sep 2010010172.633.98$402
Aug 201018712073.684.42$14,308
Jul 2010010772.554.74$507
Jun 2010010770.364.91$525
May 201007371.124.24$309
Apr 2010012381.694.12$507
Mar 2010013278.394.39$579
Feb 2010013073.585.44$708
Jan 2010012874.365.96$763
Dec 200918616471.445.48$14,187
Nov 2009012874.593.75$480
Oct 2009014172.544.11$580
Sep 2009016165.543.06$493
Aug 2009120367.423.22$721
Jul 2009023461.133.46$811
Jun 2009025566.163.90$993
May 2009030254.743.93$1,186
Apr 2009043546.773.59$1,561
Mar 2009084742.144.06$3,438
Feb 2009015932.814.63$737
Jan 2009071535.865.37$3,840
Dec 200819771637.105.98$11,588
Nov 2008046955.496.86$3,218
Oct 2008079775.246.92$5,517
Sep 2008194904101.767.88$26,862
Aug 2008200686114.228.48$28,663
Jul 20081897131.0811.39$10,347
Jun 20083851,006131.3313.03$63,673
May 20081194123.1711.57$2,369
Apr 2008080110.3110.45$836
Mar 20080646101.909.66$6,243
Feb 2008321992.538.77$2,198
Jan 200820044590.388.21$21,728
Dec 2007101,06188.337.30$8,631
Nov 200738191.677.29$866
Oct 20070082.856.92$0
Sep 200719223975.846.24$16,054
Aug 200702,10569.066.39$13,447
Jul 200702,01470.906.39$12,865
Jun 200702,17462.007.55$16,410
May 200702,36358.747.85$18,541
Apr 20071962,39359.617.81$30,361
Mar 200702,73956.927.30$20,000
Feb 200702,27355.108.22$18,675
Jan 20071763,17650.306.73$30,217
Dec 200602,89356.656.92$20,015
Nov 20061903,31254.207.62$35,527
Oct 20061883,86554.906.01$33,565
Sep 20061923,98260.085.04$31,593
Aug 20061944,29968.717.34$44,884
Jul 20061914,75969.376.34$43,435
Jun 20063725,52566.286.38$59,927
May 20065838,62566.016.42$93,899
Apr 20065874,58964.397.36$71,574
Mar 20067965,35656.707.08$83,069
Feb 20069958,96957.597.75$126,822
Jan 20062,99812,96560.598.93$297,469
Dec 20050054.9413.42$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    2 Mcf  × $  3.05 =         $6

────────────────────────────────────────────────────
Month total                                       $6

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/224894 is the state's own key, not one this site invented.