BIG CREEK A

Operated by ARROWHEAD PRODUCTIONS, LP (P-5 33523) in the NEWARK, EAST (BARNETT SHALE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 233878District 09Field 652802002 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.7 M
Sep 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
237
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 21,881 leases and 22,468 wells, and the rule below applies to all of them.

Discovered
1981-10-15
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2009-09-29.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-07-23182141
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition629 bbl$44,478
GasProduction442,118 Mcf$2,628,653
Total$2,673,131

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.1343, -98.0326. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.13425, -98.03264 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,963 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,963 ft.

Completions filed
Sep 2006
1 of 1 wells

1 well

42-237389652 H5,963 ftSep 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (237)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

237 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180165.142.93$3
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170449.292.98$12
Sep 201701347.523.09$40
Aug 201701,96245.373.00$5,895
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 201702245.373.26$72
Apr 20170047.933.21$0
Mar 20171146.772.98$50
Feb 20170050.452.95$0
Jan 20170249.413.42$7
Dec 201601,12148.763.72$4,173
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20164741.553.10$188
Aug 2016171841.442.92$2,141
Jul 201654341.622.92$334
Jun 20165645.352.69$243
May 20160042.521.99$0
Apr 20162236.561.99$77
Mar 2016123433.011.79$453
Feb 2016271426.472.06$1,526
Jan 20161127.352.36$30
Dec 20151132.362.00$34
Nov 20151138.792.17$41
Oct 20151143.552.43$46
Sep 2015275242.992.76$2,160
Aug 2015144840.162.87$1,327
Jul 20150048.152.95$0
Jun 2015052456.152.88$1,511
May 2015267355.212.96$2,099
Apr 20150049.822.71$0
Mar 2015059842.892.93$1,755
Feb 2015090344.662.98$2,688
Jan 201559343.433.10$506
Dec 2014041154.693.59$1,476
Nov 2014097670.464.25$4,150
Oct 201401,33978.303.90$5,223
Sep 201401,44086.164.05$5,825
Aug 201401,32289.394.04$5,334
Jul 201401,60296.564.18$6,696
Jun 2014041998.164.74$1,985
May 20140094.734.73$0
Apr 2014074795.944.81$3,592
Mar 2014026195.895.06$1,320
Feb 201408997.406.19$551
Jan 201401,74990.404.86$8,501
Dec 201301,64691.824.35$7,167
Nov 201302,14088.853.74$8,000
Oct 201302,23597.423.78$8,447
Sep 2013752,214104.113.72$16,039
Aug 201302,171104.253.52$7,648
Jul 201302,354102.523.72$8,752
Jun 201302,21294.403.93$8,701
May 201302,03994.834.15$8,460
Apr 201302,07993.964.28$8,904
Mar 201302,43993.623.91$9,543
Feb 201302,14391.233.42$7,329
Jan 201302,19691.603.42$7,510
Dec 201202,20086.773.42$7,524
Nov 201202,42386.953.62$8,783
Oct 201202,56989.383.40$8,734
Sep 201202,43094.672.92$7,092
Aug 201201,75892.662.91$5,113
Jul 201202,05085.133.02$6,193
Jun 201202,12979.822.52$5,363
May 201202,30491.612.49$5,733
Apr 201202,616101.652.00$5,224
Mar 201202,390105.052.22$5,311
Feb 20121032,356101.102.57$16,469
Jan 201202,88898.092.73$7,896
Dec 201102,90496.873.24$9,408
Nov 201102,97995.723.31$9,864
Oct 201103,31484.983.65$12,091
Sep 201103,37783.623.99$13,460
Aug 201103,78983.404.15$15,722
Jul 201103,65394.144.52$16,501
Jun 201103,67192.904.64$17,033
May 201103,58298.134.40$15,778
Apr 201103,350105.964.33$14,516
Mar 201103,67496.364.06$14,907
Feb 201103,28585.644.18$13,731
Jan 201103,76486.504.59$17,272
Dec 201003,61185.734.35$15,700
Nov 201003,62780.843.80$13,766
Oct 201004,34578.103.51$15,246
Sep 201002,29672.633.98$9,137
Aug 2010744,20873.684.42$24,049
Jul 201004,44172.554.74$21,035
Jun 201003,72870.364.91$18,306
May 201003,87971.124.24$16,428
Apr 201005,09881.694.12$21,017
Mar 201004,72678.394.39$20,741
Feb 201008573.585.44$463
Jan 201005474.365.96$322
Dec 2009043771.445.48$2,396
Nov 200902,79374.593.75$10,478
Oct 200903,44972.544.11$14,176
Sep 200903,42965.543.06$10,509
Aug 200903,43967.423.22$11,068
Jul 200903,35761.133.46$11,630
Jun 200903,68866.163.90$14,365
May 200903,75054.743.93$14,722
Apr 200904,06746.773.59$14,590
Mar 200904,32542.144.06$17,555
Feb 200903,94332.814.63$18,268
Jan 20091914,60835.865.37$31,599
Dec 200804,63037.105.98$27,674
Nov 200804,66655.496.86$32,010
Oct 200804,64875.246.92$32,173
Sep 200804,234101.767.88$33,352
Aug 20080410114.228.48$3,478
Jul 200804,458131.0811.39$50,774
Jun 200805,498131.3313.03$71,653
May 200805,814123.1711.57$67,293
Apr 200805,751110.3110.45$60,126
Mar 200806,068101.909.66$58,642
Feb 200808,09492.538.77$70,989
Jan 200809,38590.388.21$77,011
Dec 200709,87688.337.30$72,114
Nov 200709,53691.677.29$69,534
Oct 20071519,89482.856.92$80,996
Sep 2007010,63975.846.24$66,432
Aug 200707,86769.066.39$50,254
Jul 200706,65570.906.39$42,512
Jun 200703,21962.007.55$24,298
May 2007011,05458.747.85$86,733
Apr 2007011,76159.617.81$91,797
Mar 2007013,48456.927.30$98,460
Feb 2007013,11055.108.22$107,712
Jan 2007015,14050.306.73$101,845
Dec 2006014,72056.656.92$101,839
Nov 2006020,79454.207.62$158,398
Oct 2006024,80754.906.01$149,184
Sep 20060060.085.04$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2018 — as filed, then multipliedworked
Condensate             0 bbl  × $ 65.14 =         $0
Gas                    1 Mcf  × $  2.93 =         $3

────────────────────────────────────────────────────
Month total                                       $3

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/233878 is the state's own key, not one this site invented.