CASWELL MONINGER UNIT

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the NEWARK, EAST (BARNETT SHALE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 261483District 09Field 652802002 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.8 M
May 2011 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
181
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 21,881 leases and 22,468 wells, and the rule below applies to all of them.

Discovered
1981-10-15
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2009-09-29.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112012-02-17205105
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition21,531 bbl$1,935,817
GasProduction285,845 Mcf$895,740
Total$2,831,557

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.5280, -97.6576. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.52796, -97.65760 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,916 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,916 ft.

Completions filed
May 2011
1 of 1 wells

1 well

42-337344541H6,916 ftMay 2011

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (181)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

181 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 2016727936.561.99$2,790
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 2016902,83327.352.36$9,160
Dec 2015183,11032.362.00$6,807
Nov 20151145,05238.792.17$15,371
Oct 20151396,66043.552.43$22,214
Sep 201595,98242.992.76$16,888
Aug 2015125,47540.162.87$16,209
Jul 20151113,19148.152.95$14,742
Jun 201542,31456.152.88$6,896
May 201523,11055.212.96$9,302
Apr 2015806,60249.822.71$21,854
Mar 20158679042.892.93$6,007
Feb 20151082,65144.662.98$12,713
Jan 201581,60843.433.10$5,333
Dec 2014431,18054.693.59$6,589
Nov 2014431,41670.464.25$9,050
Oct 2014941,54478.303.90$13,383
Sep 2014431,93186.164.05$11,517
Aug 2014861,91789.394.04$15,423
Jul 2014862,94696.564.18$20,617
Jun 2014863,61898.164.74$25,580
May 2014442,31494.734.73$15,105
Apr 20141246,99295.944.81$45,522
Mar 20141299,81495.895.06$61,997
Feb 2014876,34797.406.19$47,774
Jan 2014925,28890.404.86$34,020
Dec 20131024,50191.824.35$28,965
Nov 20134366,18388.853.74$61,852
Oct 20137194897.423.78$10,500
Sep 20135866104.113.72$6,284
Aug 201300104.253.52$0
Jul 20130771102.523.72$2,866
Jun 20134515794.403.93$4,866
May 20131217,83894.834.15$43,995
Apr 20131322,72893.964.28$24,086
Mar 201327951193.623.91$28,119
Feb 201325946191.233.42$25,205
Jan 20132003,53091.603.42$30,392
Dec 20122934,51386.773.42$40,859
Nov 20122416,39386.953.62$44,129
Oct 20122386,20289.383.40$42,357
Sep 20122642,14494.672.92$31,250
Aug 201218150692.662.91$18,243
Jul 201236546885.133.02$32,486
Jun 201282213,13079.822.52$98,687
May 201288020,37191.612.49$131,306
Apr 201266224,208101.652.00$115,631
Mar 201253634,717105.052.22$133,451
Feb 201243522,447101.102.57$101,673
Jan 20129813,42298.092.73$105,582
Dec 20111,8819,51196.873.24$213,026
Nov 20111,3546,11895.723.31$149,863
Oct 20111,5542,32184.983.65$140,527
Sep 20111,3512,09683.623.99$121,325
Aug 20111,24848383.404.15$106,087
Jul 20114,7264,14194.144.52$463,612
Jun 2011619692.904.64$1,467
May 20110098.134.40$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2016 — as filed, then multipliedworked
Condensate            72 bbl  × $ 36.56 =     $2,632
Gas                   79 Mcf  × $  1.99 =       $157

────────────────────────────────────────────────────
Month total                                   $2,790

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/261483 is the state's own key, not one this site invented.