MORRISON

Operated by SCOUT ENERGY MANAGEMENT LLC (P-5 760218) in the NEWARK, EAST (BARNETT SHALE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 261994District 09Field 652802002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.6 M
May 2011 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
181
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 21,881 leases and 22,468 wells, and the rule below applies to all of them.

Discovered
1981-10-15
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2009-09-29.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112012-02-17205095
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition12,167 bbl$1,093,708
GasProduction140,348 Mcf$493,917
Total$1,587,625

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.4122, -97.7208. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.41220, -97.72078 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,045 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,045 ft.

Completions filed
May 2011
1 of 1 wells

1 well

42-497372112H7,045 ftMay 2011

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (181)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

181 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20182260.183.08$127
May 20182265.382.90$137
Apr 20181163.842.90$67
Mar 20181161.222.79$64
Feb 20182261.782.77$129
Jan 20181162.874.01$67
Dec 20172257.272.92$120
Nov 20173355.423.12$176
Oct 20173349.292.98$157
Sep 20174447.523.09$202
Aug 20172245.373.00$97
Jul 20174443.873.09$188
Jun 20173342.493.09$137
May 201791045.373.26$441
Apr 20173347.933.21$153
Mar 20173346.772.98$149
Feb 20176750.452.95$323
Jan 20173349.413.42$158
Dec 20163348.763.72$157
Nov 20162242.492.64$90
Oct 20162246.193.09$99
Sep 20161141.553.10$45
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20161142.521.99$45
Apr 20160036.561.99$0
Mar 20161133.011.79$35
Feb 20160026.472.06$0
Jan 20161127.352.36$30
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20151043.552.43$44
Sep 20151142.992.76$46
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20152056.152.88$112
May 20151155.212.96$58
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20151244.662.98$51
Jan 20151845343.433.10$2,186
Dec 2014051254.693.59$1,839
Nov 2014140070.464.25$1,771
Oct 20146551278.303.90$7,087
Sep 2014049586.164.05$2,002
Aug 20148720689.394.04$8,608
Jul 20141911696.564.18$2,319
Jun 2014049598.164.74$2,345
May 20142051294.734.73$4,315
Apr 2014049595.944.81$2,381
Mar 20141248795.895.06$3,613
Feb 2014042697.406.19$2,638
Jan 20142350790.404.86$4,544
Dec 20132947991.824.35$4,749
Nov 20133649588.853.74$5,049
Oct 20136451297.423.78$8,170
Sep 201356495104.113.72$7,670
Aug 20135512104.253.52$2,325
Jul 20130512102.523.72$1,903
Jun 2013049594.403.93$1,947
May 2013350194.834.15$2,363
Apr 2013249193.964.28$2,291
Mar 20132448593.623.91$4,145
Feb 20134145791.233.42$5,303
Jan 2013050691.603.42$1,730
Dec 2012051286.773.42$1,751
Nov 2012148386.953.62$1,838
Oct 20121164189.383.40$3,162
Sep 20122759994.672.92$4,304
Aug 20126465192.662.91$7,823
Jul 201221185985.133.02$20,557
Jun 20121343,64379.822.52$19,873
May 20123384,21491.612.49$41,450
Apr 2012236653101.652.00$25,293
Mar 2012402679105.052.22$43,739
Feb 20124488,807101.102.57$67,929
Jan 201255513,51098.092.73$91,377
Dec 201193914,81296.873.24$138,948
Nov 201173511,66795.723.31$108,987
Oct 20111,02218,81584.983.65$155,497
Sep 20111,63224,79883.623.99$235,308
Aug 20112,71321,46983.404.15$315,346
Jul 20111,11516594.144.52$105,711
Jun 20111,0081,74492.904.64$101,735
May 20110098.134.40$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2018 — as filed, then multipliedworked
Condensate             2 bbl  × $ 60.18 =       $120
Gas                    2 Mcf  × $  3.08 =         $6

────────────────────────────────────────────────────
Month total                                     $127

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/261994 is the state's own key, not one this site invented.