HAMMAN

Operated by OAKRIDGE OIL AND GAS, LP (P-5 617342) in the NEALE (MARBLE FALLS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 279761District 09Field 64699500CondensateGasSaveExport
Value, all time
$746 k
Feb 2016 – Oct 2024
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
105
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 49 leases and 71 wells, and the rule below applies to all of them.

Discovered
1984-09-14
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2016-04-01.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 11/01/2018.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition253 bbl$15,636
GasProduction231,048 Mcf$730,597
Total$746,233

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.1019, -98.2199. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.10187, -98.21995 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,745 ft
1 wells filed one
Completion to plug
11.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,745 ft.

Completions filed
May 2013
1 of 1 wells
Plug dates filed
Nov 2024
1 of 1 wells

Last completion to plug: a median of 11.5 years across the 1 well that filed both dates, with the middle half between 11.5 years and 11.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2373972495,745 ftMay 2013Nov 2024Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (105)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

105 months

Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 202403978.812.20$86
Apr 202401984.451.66$32
Mar 2024261280.301.55$2,106
Feb 20240076.091.78$0
Jan 2024032373.023.30$1,065
Dec 2023049471.262.61$1,290
Nov 20234551777.892.81$4,957
Oct 2023060885.443.09$1,877
Sep 2023058689.042.74$1,603
Aug 2023067480.522.67$1,802
Jul 2023064574.852.64$1,704
Jun 2023063368.962.26$1,430
May 2023068570.622.23$1,526
Apr 2023087678.122.24$1,960
Mar 2023096072.852.39$2,297
Feb 2023186075.112.47$2,196
Jan 202301,00176.533.39$3,391
Dec 202201,06076.415.73$6,073
Nov 202201,05085.005.65$5,929
Oct 202201,15687.185.86$6,779
Sep 202201,13884.888.16$9,290
Aug 202201,16094.529.13$10,588
Jul 202201,178101.587.54$8,885
Jun 202201,301115.097.98$10,378
May 202201,408109.378.43$11,874
Apr 202201,333104.226.84$9,115
Mar 202201,434108.885.08$7,280
Feb 202201,44191.054.86$7,002
Jan 2022491,62781.844.54$11,393
Dec 202101,77771.323.90$6,929
Nov 202111,72077.435.24$9,085
Oct 202101,85379.795.71$10,588
Sep 202102,05469.865.35$10,991
Aug 202111,54866.024.22$6,599
Jul 202101,43170.783.98$5,698
Jun 202101,34369.493.38$4,540
May 202101,67963.483.02$5,067
Apr 202112,36660.362.76$6,587
Mar 202101,61361.302.72$4,382
Feb 202101,33357.805.55$7,395
Jan 202111,92850.412.81$5,469
Dec 202002,60844.642.68$6,978
Nov 202002,06138.772.71$5,578
Oct 202002,29636.972.48$5,690
Sep 2020592,29237.091.99$6,752
Aug 2020242,18739.982.39$6,176
Jul 202002,47838.371.83$4,523
Jun 202001,75534.901.69$2,966
May 202002,01416.921.81$3,655
Apr 202002,05514.751.80$3,708
Mar 202002,19230.341.86$4,069
Feb 202002,01849.881.98$3,997
Jan 202002,16257.252.09$4,529
Dec 201902,34659.012.30$5,406
Nov 201902,26555.302.75$6,230
Oct 201902,55153.472.42$6,170
Sep 201902,75955.052.66$7,331
Aug 201902,78753.112.30$6,422
Jul 201902,78456.272.46$6,849
Jun 201902,51652.782.49$6,268
May 201902,44858.482.74$6,708
Apr 201902,33262.632.75$6,415
Mar 2019452,46056.803.06$10,089
Feb 201902,30150.852.79$6,425
Jan 201902,67546.033.23$8,635
Dec 201802,89746.594.19$12,125
Nov 201802,58352.934.24$10,945
Oct 201802,75161.443.40$9,348
Sep 201802,67659.543.11$8,317
Aug 201802,67859.403.07$8,212
Jul 201802,95465.142.93$8,661
Jun 201803,18660.183.08$9,803
May 201803,46265.382.90$10,043
Apr 201803,18763.842.90$9,245
Mar 201803,60061.222.79$10,033
Feb 201803,51561.782.77$9,723
Jan 201804,00962.874.01$16,073
Dec 201704,03257.272.92$11,780
Nov 201703,94655.423.12$12,305
Oct 201704,06249.292.98$12,120
Sep 201703,95247.523.09$12,201
Aug 201704,14045.373.00$12,438
Jul 201704,04543.873.09$12,488
Jun 201703,48342.493.09$10,753
May 201703,91445.373.26$12,773
Apr 201703,94447.933.21$12,667
Mar 201704,35046.772.98$12,979
Feb 201704,12450.452.95$12,177
Jan 201704,48849.413.42$15,344
Dec 201604,25448.763.72$15,837
Nov 201603,96542.492.64$10,485
Oct 201603,73946.193.09$11,554
Sep 201603,67641.553.10$11,398
Aug 201603,70241.442.92$10,826
Jul 201604,05841.622.92$11,867
Jun 201603,88945.352.69$10,445
May 201604,20742.521.99$8,376
Apr 201604,22036.561.99$8,402
Mar 201604,22633.011.79$7,581
Feb 201603,92926.472.06$8,108

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 78.81 =         $0
Gas                   39 Mcf  × $  2.20 =        $86

────────────────────────────────────────────────────
Month total                                      $86

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/279761 is the state's own key, not one this site invented.