WIMBERLY

Operated by SNOW OPERATING CO., INC. (P-5 798647) in the CLAY-RAY (CONGL.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 65350District 09Field 18741400CondensateGasSaveExport
Value, all time
$6 k
Jan 1993 – Dec 2008
Value, last 12 filed months
$0
at the published price for each month
Months reported
192
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 13 leases and 13 wells, and the rule below applies to all of them.

Discovered
1979-02-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,867 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres.

The Commission's schedule remark for this field reads: RULES EFF 12-1-79 PER ORDER #9-71254

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition62 bbl$1,094
GasProduction7,952 Mcf$4,602
Total$5,696

6,133 Mcf of this lease's gas, across 45 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.0453, -98.1150. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.04535, -98.11501 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,200 ft
1 wells filed one
Completion to plug
32.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,200 ft.

Completions filed
Feb 1976
1 of 1 wells
Plug dates filed
Dec 2008
1 of 1 wells

Last completion to plug: a median of 32.8 years across the 1 well that filed both dates, with the middle half between 32.8 years and 32.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2373112515,200 ftFeb 1976Dec 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (192)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

192 months

Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 199806312.802.31$145
Feb 199804513.952.30$103
Jan 199806414.702.15$138
Dec 1997013716.322.41$330
Nov 1997013718.193.09$423
Oct 1997013519.253.15$425
Sep 1997013717.742.95$405
Aug 1997013717.862.55$350
Jul 1997013717.582.25$308
Jun 1997013717.242.26$309
May 1997416218.972.31$450
Apr 1997013117.882.08$273
Mar 1997014418.951.94$279
Feb 1997011820.492.21$260
Jan 1997013523.483.54$478
Dec 1996013323.32$0
Nov 1996013121.97$0
Oct 1996019423.31$0
Sep 1996012122.22$0
Aug 1996012520.26$0
Jul 1996014119.55$0
Jun 199607018.73$0
May 1996016519.43$0
Apr 1996014121.51$0
Mar 1996016219.38$0
Feb 1996015716.98$0
Jan 1996012217.07$0
Dec 19950017.19$0
Nov 19950016.00$0
Oct 199509215.43$0
Sep 199501416.18$0
Aug 1995017215.92$0
Jul 199501815.24$0
Jun 199507016.41$0
May 1995583817.56$1,018
Apr 199506517.73$0
Mar 1995010316.44$0
Feb 19950016.58$0
Jan 1995016015.92$0
Dec 1994023415.03$0
Nov 1994024815.90$0
Oct 1994024415.58$0
Sep 1994014715.29$0
Aug 1994020716.13$0
Jul 1994022217.56$0
Jun 1994020517.09$0
May 1994023615.88$0
Apr 1994022614.14$0
Mar 1994031412.46$0
Feb 1994019212.50$0
Jan 1994024812.66$0
Dec 1993018812.33$0
Nov 1993014214.49$0
Oct 199306115.85$0
Sep 199308115.03$0
Aug 199303615.66$0
Jul 199306515.46$0
Jun 199306116.79$0
May 199308217.68$0
Apr 1993010618.05$0
Mar 199304318.14$0
Feb 199306817.90$0
Jan 199308316.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 1998 — as filed, then multipliedworked
Condensate             0 bbl  × $ 12.80 =         $0
Gas                   63 Mcf  × $  2.31 =       $145

────────────────────────────────────────────────────
Month total                                     $145

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/65350 is the state's own key, not one this site invented.