OWENS ESTATE

Operated by D L OPERATING (P-5 196262) in the BRYSON, E. (CADDO GAS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 89021District 09Field 12800330NGPA filingCondensateGasSaveExport
Value, all time
$121 k
Jan 1993 – Jan 2022
Value, last 12 filed months
$0
at the published price for each month
Months reported
339
10 months not filed
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4 leases and 4 wells, and the rule below applies to all of them.

Discovered
1978-06-20
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: COUNTY REGULAR SPACING RULES APPLY.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition95 bbl$7,362
GasProduction40,249 Mcf$113,508
Total$120,870

19,380 Mcf of this lease's gas, across 29 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.1945, -98.3158. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.19451, -98.31581 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,956 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,956 ft.

Completions filed
Jul 2014
1 of 1 wells

1 well

42-2373222834,956 ftJul 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (339)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

339 months

Jan 20220081.844.54$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 201614027.352.36$383
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 2014813686.164.05$7,125
Aug 201405489.394.04$218
Jul 201401496.564.18$59
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 2014014995.895.06$753
Feb 201402097.406.19$124
Jan 201407590.404.86$365
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 2013017697.423.78$665
Sep 20130105104.113.72$390
Aug 201300104.253.52$0
Jul 20130101102.523.72$375
Jun 2013013094.403.93$511
May 2013011694.834.15$481
Apr 20130093.964.28$0
Mar 201307293.623.91$282
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 201105595.723.31$182
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 201104883.404.15$199
Jul 20110094.144.52$0
Jun 201108892.904.64$408
May 201102298.134.40$97
Apr 2011090105.964.33$390
Mar 2011010196.364.06$410
Feb 2011029285.644.18$1,221
Jan 2011014586.504.59$665
Dec 2010034885.734.35$1,513
Nov 2010021580.843.80$816
Oct 2010013778.103.51$481
Sep 2010014472.633.98$573
Aug 2010053773.684.42$2,373
Jul 2010033872.554.74$1,601
Jun 2010011570.364.91$565
May 2010026271.124.24$1,110
Apr 20100081.694.12$0
Mar 201008978.394.39$391
Feb 201007773.585.44$419
Jan 2010016874.365.96$1,002
Dec 2009019471.445.48$1,064
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 2009016865.543.06$515
Aug 2009047667.423.22$1,532
Jul 2009018361.133.46$634
Jun 200907966.163.90$308
May 200908454.743.93$330
Apr 200903346.773.59$118
Mar 2009011842.144.06$479
Feb 2009083632.814.63$3,873
Jan 2009049235.865.37$2,643
Dec 2008014537.105.98$867
Nov 2008019055.496.86$1,303
Oct 2008022175.246.92$1,530
Sep 20080112101.767.88$882
Aug 20080179114.228.48$1,518
Jul 20080132131.0811.39$1,503
Jun 2008062131.3313.03$808
May 20080251123.1711.57$2,905
Apr 20080290110.3110.45$3,032
Mar 20080381101.909.66$3,682
Feb 200802892.538.77$246
Jan 200801590.388.21$123
Dec 2007012388.337.30$898
Nov 2007026691.677.29$1,940
Oct 200708182.856.92$561
Sep 200706475.846.24$400
Aug 200701869.066.39$115
Jul 200703670.906.39$230
Jun 200705062.007.55$377
May 200704958.747.85$384
Apr 200701859.617.81$140
Mar 200701256.927.30$88
Feb 200702655.108.22$214
Jan 200703950.306.73$262
Dec 2006016156.656.92$1,114
Nov 200604554.207.62$343
Oct 200608554.906.01$511
Sep 2006014560.085.04$730
Aug 2006023968.717.34$1,754
Jul 20060069.376.34$0
Jun 2006011466.286.38$728
May 2006033766.016.42$2,165
Apr 2006026364.397.36$1,936
Mar 20060056.707.08$0
Feb 200607857.597.75$605
Jan 2006023160.598.93$2,064
Dec 200508854.9413.42$1,181
Nov 20050054.6910.59$0
Oct 200502358.3413.80$317
Sep 2005010761.4512.08$1,292
Aug 200503661.519.80$353
Jul 200506755.697.84$526
Jun 2005020952.337.38$1,543
May 200507345.226.65$486
Apr 200504349.207.36$317
Mar 200508950.377.15$637
Feb 200506745.226.31$423
Jan 2005013743.166.32$866
Dec 2004021939.866.75$1,478
Nov 2004011345.286.33$715
Oct 2004014949.706.52$971
Sep 200406843.245.28$359
Aug 200405742.375.55$316
Jul 2004013238.286.08$803
Jun 2004018936.106.43$1,216
May 2004013237.486.49$857
Apr 2004023834.475.86$1,394
Mar 200404634.365.53$254
Feb 2004014332.455.51$788
Jan 2004051332.036.30$3,232
Dec 2003011730.266.30$737
Nov 2003013828.804.60$634
Oct 2003014028.174.76$666
Sep 200306326.314.75$299
Aug 200309129.765.13$467
Jul 2003010629.415.17$548
Jun 20030728.565.98$42
May 200301626.595.97$96
Apr 200303226.675.41$173
Mar 2003029931.146.10$1,823
Feb 2003014833.487.93$1,173
Jan 2003020830.315.58$1,161
Dec 2002027426.914.85$1,330
Nov 2002031424.664.14$1,299
Oct 2002059026.464.23$2,495
Sep 2002023227.443.64$843
Aug 2002042525.963.16$1,345
Jul 2002015324.583.06$468
Jun 200203623.733.34$120
May 2002037224.663.58$1,333
Apr 2002035823.653.51$1,257
Mar 20020022.003.10$0
Feb 2002041418.222.38$984
Jan 2002027117.172.38$644
Dec 200107516.932.36$177
Nov 2001011218.072.41$269
Oct 2001011019.782.53$278
Sep 2001014724.262.25$331
Aug 2001015524.873.05$473
Jul 2001015523.933.20$496
Jun 2001015024.563.82$574
May 2001015525.524.31$668
Apr 2001015024.685.34$800
Mar 2001015524.545.38$833
Feb 2001014027.755.77$807
Jan 2001015527.478.40$1,302
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 19970017.862.55$0
Jul 19970017.582.25$0
Jun 19970017.242.26$0
May 19970018.972.31$0
Apr 19970017.882.08$0
Mar 19970018.951.94$0
Feb 19970020.492.21$0
Jan 19970023.483.54$0
Dec 19960023.32$0
Nov 19960021.97$0
Oct 19960023.31$0
Sep 19960022.22$0
Aug 19960020.26$0
Jul 19960019.55$0
Jun 19960018.73$0
May 19960019.43$0
Apr 19960021.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 19960017.07$0
Dec 19950017.19$0
Nov 19950016.00$0
Oct 19950015.43$0
Sep 19950016.18$0
Aug 19950015.92$0
Jul 19950015.24$0
Jun 19950016.41$0
May 199507417.56$0
Apr 1995039617.73$0
Mar 1995033816.44$0
Feb 1995011016.58$0
Jan 1995032815.92$0
Dec 1994039215.03$0
Nov 1994044615.90$0
Oct 199407,96515.58$0
Sep 1994041915.29$0
Aug 1994044916.13$0
Jul 1994035917.56$0
Jun 1994020417.09$0
May 1994047915.88$0
Apr 1994066614.14$0
Mar 1994038412.46$0
Feb 1994040612.50$0
Jan 1994046412.66$0
Dec 1993040112.33$0
Nov 1993050114.49$0
Oct 1993038515.85$0
Sep 1993053315.03$0
Aug 1993043215.66$0
Jul 1993068015.46$0
Jun 1993031616.79$0
May 1993024817.68$0
Apr 1993072118.05$0
Mar 1993030118.14$0
Feb 1993038617.90$0
Jan 1993059716.93$0

Not filed, and not zero: Mar 2021 – Dec 2021 (10 months). The Railroad Commission holds no report for those months, so this page shows none — a zero would state that the lease produced nothing.

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2016 — as filed, then multipliedworked
Condensate            14 bbl  × $ 27.35 =       $383
Gas                    0 Mcf  × $  2.36 =         $0

────────────────────────────────────────────────────
Month total                                     $383

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/G/89021 is the state's own key, not one this site invented.