BOMARTON POOL UNIT

Operated by APEX RESOURCES LLC (P-5 101369) in the BOMARTON (TANNEHILL -A-) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 10382District 09Field 10343400OilCasinghead gasSaveExport
Value, all time
$3.5 M
Jan 1993 – May 2026
Value, last 12 filed months
$110 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 17 wells, and the rule below applies to all of them.

Discovered
1956-08-22
as the register files it
Field class
Oil
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: NOW APPLY

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition75,074 bbl$3,502,812
Casinghead gasProduction21 Mcf$0
Total$3,502,812

21 Mcf of this lease's gas, across 21 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (14)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.4337, -99.4465. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.7 miles.

33.43372, -99.44639 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
57.1%
8 of 14 wells
With a plug date
57.1%
8 of 14 wells
Median depth
1,503 ft
14 wells filed one
Completion to plug
42.4 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
857.1%
A plug date is filed
857.1%
BothOn the schedule and plugged. Neither fact cancels the other.
857.1%
NeitherNo plug date, and not on the schedule.
642.9%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Total depth in feet, 14 of 14 wells. Median 1,503 ft, with the middle half between 1,436 and 1,531 ft; the shallowest is 1,420 ft and the deepest 1,600 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.

When they were last completed

Last completion by decade, 7 of 14 wells, Sep 1973 – Jan 2005. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.

Completions filed
Sep 1973 – Jan 2005
7 of 14 wells; 7 filed none
Plug dates filed
May 1984 – Feb 2016
8 of 14 wells; 6 filed none

Last completion to plug: a median of 42.4 years across the 1 well that filed both dates, with the middle half between 42.4 years and 42.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

14 wells

42-02330071391,431 ftJul 2008Yes
42-02330072381,420 ftJun 2003Yes
42-02330074371,429 ftJul 2008Yes
42-0238055311,535 ftMay 1984Yes
42-02380554181,450 ftMay 1984Yes
42-02380555211,550 ftOct 2013Yes
42-02380556251,500 ftMay 1984Yes
42-02331568461,545 ftJan 2005
42-02331570451,520 ftJan 2005
42-02331565441,515 ftJun 2004
42-02331564431,505 ftMay 2004
42-02331462401,600 ftJun 1993
42-02330075361,479 ftOct 1973
42-02330073351,426 ftSep 1973Feb 2016Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 2026194098.932.87$19,192
Mar 2026224089.753.15$20,104
Feb 202675063.503.75$4,763
Jan 202673059.138.00$4,316
Dec 2025220056.664.41$12,465
Nov 2025147058.593.93$8,613
Oct 202572059.383.30$4,275
Sep 2025145062.743.08$9,097
Aug 2025149063.933.01$9,526
Jul 2025190066.743.32$12,681
Jun 202570066.483.13$4,654
May 202573060.553.23$4,420
Apr 202575062.363.54$4,677
Mar 2025148067.704.27$10,020
Feb 202576070.884.34$5,387
Jan 2025153074.324.28$11,371
Dec 2024148068.993.12$10,211
Nov 202473069.052.20$5,041
Oct 2024147071.372.28$10,491
Sep 202474069.612.36$5,151
Aug 2024144075.632.06$10,891
Jul 2024142079.932.15$11,350
Jun 2024137078.082.63$10,697
May 2024130078.812.20$10,245
Apr 202456084.451.66$4,729
Mar 202452080.301.55$4,176
Feb 2024148076.091.78$11,261
Jan 2024148073.023.30$10,807
Dec 2023148071.262.61$10,546
Nov 2023151077.892.81$11,761
Oct 202376085.443.09$6,493
Sep 2023149089.042.74$13,267
Aug 202375080.522.67$6,039
Jul 202378074.852.64$5,838
Jun 2023146068.962.26$10,068
May 2023155070.622.23$10,946
Apr 202374078.122.24$5,781
Mar 2023145072.852.39$10,563
Feb 2023145075.112.47$10,891
Jan 202373076.533.39$5,587
Dec 2022153076.415.73$11,691
Nov 202282085.005.65$6,970
Oct 2022251087.185.86$21,882
Sep 2022105084.888.16$8,912
Aug 202288094.529.13$8,318
Jul 20221820101.587.54$18,488
Jun 20221860115.097.98$21,407
May 20222100109.378.43$22,968
Apr 20221010104.226.84$10,526
Mar 20222980108.885.08$32,446
Feb 202299091.054.86$9,014
Jan 2022204081.844.54$16,695
Dec 2021204071.323.90$14,549
Nov 202198077.435.24$7,588
Oct 2021103079.795.71$8,218
Sep 2021107069.865.35$7,475
Aug 2021105066.024.22$6,932
Jul 2021104070.783.98$7,361
Jun 2021113069.493.38$7,852
May 2021103063.483.02$6,538
Apr 2021110060.362.76$6,640
Mar 2021111061.302.72$6,804
Feb 2021108057.805.55$6,242
Jan 2021210050.412.81$10,586
Dec 2020104044.642.68$4,643
Nov 2020108038.772.71$4,187
Oct 2020105036.972.48$3,882
Sep 2020219037.091.99$8,123
Aug 2020109039.982.39$4,358
Jul 2020214038.371.83$8,211
Jun 2020108034.901.69$3,769
May 2020107016.921.81$1,810
Apr 2020178014.751.80$2,626
Mar 2020304030.341.86$9,223
Feb 2020172049.881.98$8,579
Jan 2020317057.252.09$18,148
Dec 2019338059.012.30$19,945
Nov 2019176055.302.75$9,733
Oct 2019354053.472.42$18,928
Sep 2019346055.052.66$19,047
Aug 2019182053.112.30$9,666
Jul 201974056.272.46$4,164
Jun 2019155052.782.49$8,181
May 201976058.482.74$4,444
Apr 2019151062.632.75$9,457
Mar 2019154056.803.06$8,747
Feb 201978050.852.79$3,966
Jan 2019153046.033.23$7,043
Dec 201878046.594.19$3,634
Nov 2018160052.934.24$8,469
Oct 2018158061.443.40$9,708
Sep 201878059.543.11$4,644
Aug 2018157059.403.07$9,326
Jul 2018155065.142.93$10,097
Jun 2018156060.183.08$9,388
May 2018148065.382.90$9,676
Apr 2018160063.842.90$10,214
Mar 2018162061.222.79$9,918
Feb 201881061.782.77$5,004
Jan 2018240062.874.01$15,089
Dec 201778057.272.92$4,467
Nov 2017235055.423.12$13,024
Oct 2017122049.292.98$6,013
Sep 2017128047.523.09$6,083
Aug 2017120045.373.00$5,444
Jul 201739043.873.09$1,711
Jun 201771042.493.09$3,017
May 201770045.373.26$3,176
Apr 201735047.933.21$1,678
Mar 201771046.772.98$3,321
Feb 201736050.452.95$1,816
Jan 201765049.413.42$3,212
Dec 201636048.763.72$1,755
Nov 201668042.492.64$2,889
Oct 201663046.193.09$2,910
Sep 201628041.553.10$1,163
Aug 201660041.442.92$2,486
Jul 201659041.622.92$2,456
Jun 201663045.352.69$2,857
May 201632042.521.99$1,361
Apr 201664036.561.99$2,340
Mar 201660033.011.79$1,981
Feb 201666026.472.06$1,747
Jan 201666027.352.36$1,805
Dec 201565032.362.00$2,103
Nov 201531038.792.17$1,202
Oct 201565043.552.43$2,831
Sep 201563042.992.76$2,708
Aug 201564040.162.87$2,570
Jul 201595048.152.95$4,574
Jun 201564056.152.88$3,594
May 201595055.212.96$5,245
Apr 201564049.822.71$3,188
Mar 201563042.892.93$2,702
Feb 201565044.662.98$2,903
Jan 201597043.433.10$4,213
Dec 201464054.693.59$3,500
Nov 201466070.464.25$4,650
Oct 201495078.303.90$7,439
Sep 201463086.164.05$5,428
Aug 201497089.394.04$8,671
Jul 201495096.564.18$9,173
Jun 201486098.164.74$8,442
May 2014133094.734.73$12,599
Apr 2014131095.944.81$12,568
Mar 2014136095.895.06$13,041
Feb 201491097.406.19$8,863
Jan 201490090.404.86$8,136
Dec 2013137091.824.35$12,579
Nov 201389088.853.74$7,908
Oct 20130097.423.78$0
Sep 2013900104.113.72$9,370
Aug 20131330104.253.52$13,865
Jul 2013880102.523.72$9,022
Jun 2013135094.403.93$12,744
May 201388094.834.15$8,345
Apr 2013133093.964.28$12,497
Mar 201390093.623.91$8,426
Feb 201391091.233.42$8,302
Jan 2013136091.603.42$12,458
Dec 2012135086.773.42$11,714
Nov 201292086.953.62$7,999
Oct 2012134089.383.40$11,977
Sep 2012134094.672.92$12,686
Aug 201289092.662.91$8,247
Jul 2012134085.133.02$11,407
Jun 2012136079.822.52$10,856
May 201289091.612.49$8,153
Apr 20121330101.652.00$13,519
Mar 2012910105.052.22$9,560
Feb 2012420101.102.57$4,246
Jan 2012138098.092.73$13,536
Dec 201194096.873.24$9,106
Nov 201187095.723.31$8,328
Oct 201150084.983.65$4,249
Sep 2011195083.623.99$16,306
Aug 2011201083.404.15$16,763
Jul 201166094.144.52$6,213
Jun 2011134092.904.64$12,449
May 2011199098.134.40$19,528
Apr 20111280105.964.33$13,563
Mar 2011270096.364.06$26,017
Feb 2011133085.644.18$11,390
Jan 2011136086.504.59$11,764
Dec 2010134085.734.35$11,488
Nov 2010267080.843.80$21,584
Oct 2010134078.103.51$10,465
Sep 2010199072.633.98$14,453
Aug 2010197073.684.42$14,515
Jul 2010212072.554.74$15,381
Jun 2010196070.364.91$13,791
May 2010259071.124.24$18,420
Apr 2010201081.694.12$16,420
Mar 2010264078.394.39$20,695
Feb 2010132073.585.44$9,713
Jan 2010201074.365.96$14,946
Dec 2009135071.445.48$9,644
Nov 2009269074.593.75$20,065
Oct 2009201072.544.11$14,581
Sep 2009201065.543.06$13,174
Aug 2009264067.423.22$17,799
Jul 2009201061.133.46$12,287
Jun 2009257066.163.90$17,003
May 2009239054.743.93$13,083
Apr 2009179046.773.59$8,372
Mar 200928042.144.06$1,180
Feb 2009268032.814.63$8,793
Jan 2009204035.865.37$7,315
Dec 2008216037.105.98$8,014
Nov 2008205055.496.86$11,375
Oct 2008273075.246.92$20,541
Sep 20082050101.767.88$20,861
Aug 20082050114.228.48$23,415
Jul 20082690131.0811.39$35,261
Jun 20082720131.3313.03$35,722
May 20082750123.1711.57$33,872
Apr 20083440110.3110.45$37,947
Mar 20082780101.909.66$28,328
Feb 2008343092.538.77$31,738
Jan 2008274090.388.21$24,764
Dec 2007347088.337.30$30,651
Nov 2007207091.677.29$18,976
Oct 2007268082.856.92$22,204
Sep 2007205075.846.24$15,547
Aug 2007275069.066.39$18,992
Jul 2007273070.906.39$19,356
Jun 2007135062.007.55$8,370
May 2007198058.747.85$11,631
Apr 2007138059.617.81$8,226
Mar 2007138056.927.30$7,855
Feb 2007205055.108.22$11,296
Jan 2007136050.306.73$6,841
Dec 2006261056.656.92$14,786
Nov 2006130054.207.62$7,046
Oct 2006204054.906.01$11,200
Sep 2006274060.085.04$16,462
Aug 2006132068.717.34$9,070
Jul 2006197069.376.34$13,666
Jun 2006265066.286.38$17,564
May 2006133066.016.42$8,779
Apr 2006198064.397.36$12,749
Mar 2006191056.707.08$10,830
Feb 2006183057.597.75$10,539
Jan 2006154060.598.93$9,331
Dec 2005194054.9413.42$10,658
Nov 2005193054.6910.59$10,555
Oct 2005267058.3413.80$15,577
Sep 2005265061.4512.08$16,284
Aug 2005259061.519.80$15,931
Jul 2005258055.697.84$14,368
Jun 2005185052.337.38$9,681
May 2005254045.226.65$11,486
Apr 2005259049.207.36$12,743
Mar 2005323050.377.15$16,270
Feb 2005306045.226.31$13,837
Jan 2005312043.166.32$13,466
Dec 2004331039.866.75$13,194
Nov 2004385045.286.33$17,433
Oct 2004334049.706.52$16,600
Sep 2004324043.245.28$14,010
Aug 2004322042.375.55$13,643
Jul 2004516038.286.08$19,752
Jun 2004522036.106.43$18,844
May 2004452037.486.49$16,941
Apr 2004189034.475.86$6,515
Mar 2004260034.365.53$8,934
Feb 2004194032.455.51$6,295
Jan 2004258032.036.30$8,264
Dec 2003258030.266.30$7,807
Nov 2003254028.804.60$7,315
Oct 2003328028.174.76$9,240
Sep 2003263026.314.75$6,920
Aug 2003255029.765.13$7,589
Jul 2003392029.415.17$11,529
Jun 2003312028.565.98$8,911
May 2003315026.595.97$8,376
Apr 2003318026.675.41$8,481
Mar 2003195031.146.10$6,072
Feb 2003376033.487.93$12,588
Jan 2003184030.315.58$5,577
Dec 2002254026.914.85$6,835
Nov 2002325024.664.14$8,015
Oct 2002255026.464.23$6,747
Sep 2002188027.443.64$5,159
Aug 2002256025.963.16$6,646
Jul 2002256024.583.06$6,292
Jun 2002377023.733.34$8,946
May 2002193024.663.58$4,759
Apr 2002244023.653.51$5,771
Mar 2002258022.003.10$5,676
Feb 2002188018.222.38$3,425
Jan 2002196017.172.38$3,365
Dec 2001192016.932.36$3,251
Nov 2001128018.072.41$2,313
Oct 2001197019.782.53$3,897
Sep 2001193024.262.25$4,682
Aug 2001190024.873.05$4,725
Jul 2001194023.933.20$4,642
Jun 2001260024.563.82$6,386
May 2001254025.524.31$6,482
Apr 2001192024.685.34$4,739
Mar 2001195024.545.38$4,785
Feb 2001126027.755.77$3,497
Jan 2001256027.478.40$7,032
Dec 2000244026.889.12$6,559
Nov 200066032.215.66$2,126
Oct 2000191031.235.15$5,965
Sep 2000185031.875.19$5,896
Aug 2000187029.644.54$5,543
Jul 2000123028.534.09$3,509
Jun 2000191029.304.40$5,596
May 2000257027.263.68$7,006
Apr 2000194024.513.12$4,755
Mar 2000250028.422.86$7,105
Feb 2000161027.622.73$4,447
Jan 2000327025.272.48$8,263
Dec 1999195024.282.42$4,735
Nov 1999239023.192.43$5,542
Oct 1999130020.982.80$2,727
Sep 1999179021.752.62$3,893
Aug 1999180019.262.88$3,467
Jul 1999241017.892.37$4,311
Jun 1999163015.942.36$2,598
May 1999182015.792.32$2,874
Apr 1999122015.102.21$1,842
Mar 1999181012.471.84$2,257
Feb 199912309.981.82$1,228
Jan 1999178010.381.90$1,848
Dec 199818309.201.77$1,684
Nov 1998188010.892.19$2,047
Oct 1998237012.421.97$2,944
Sep 1998184012.592.08$2,317
Aug 1998170011.301.91$1,921
Jul 1998292011.742.24$3,428
Jun 1998179011.242.24$2,012
May 1998253012.622.21$3,193
Apr 1998236013.042.51$3,077
Mar 1998224012.802.31$2,867
Feb 1998241013.952.30$3,362
Jan 1998264014.702.15$3,881
Dec 1997206016.322.41$3,362
Nov 1997209018.193.09$3,802
Oct 1997253019.253.15$4,870
Sep 1997197017.742.95$3,495
Aug 1997251017.862.55$4,483
Jul 1997301017.582.25$5,292
Jun 1997245017.242.26$4,224
May 1997276018.972.31$5,236
Apr 1997300017.882.08$5,364
Mar 1997296018.951.94$5,609
Feb 1997253020.492.21$5,184
Jan 1997331023.483.54$7,772
Dec 1996383023.32$8,932
Nov 1996294021.97$6,459
Oct 1996301023.31$7,016
Sep 1996255022.22$5,666
Aug 1996357020.26$7,233
Jul 1996297019.55$5,806
Jun 1996245018.73$4,589
May 1996379019.43$7,364
Apr 1996338021.51$7,270
Mar 1996361019.38$6,996
Feb 1996287016.98$4,873
Jan 1996417017.07$7,118
Dec 1995364017.19$6,257
Nov 1995362016.00$5,792
Oct 1995367015.43$5,663
Sep 1995306016.18$4,951
Aug 1995481015.92$7,658
Jul 1995356015.24$5,425
Jun 1995354016.41$5,809
May 1995482017.56$8,464
Apr 1995422017.73$7,482
Mar 1995219016.44$3,600
Feb 1995363016.58$6,019
Jan 1995424015.92$6,750
Dec 1994250015.03$3,758
Nov 1994244015.90$3,880
Oct 1994175015.58$2,727
Sep 1994235115.29$3,593
Aug 1994230116.13$3,710
Jul 1994171117.56$3,003
Jun 1994174117.09$2,974
May 1994166115.88$2,636
Apr 1994241114.14$3,408
Mar 1994233112.46$2,903
Feb 1994177112.50$2,213
Jan 1994247112.66$3,127
Dec 1993253112.33$3,119
Nov 1993231114.49$3,347
Oct 1993223115.85$3,535
Sep 1993209115.03$3,141
Aug 1993339115.66$5,309
Jul 1993542115.46$8,379
Jun 1993461116.79$7,740
May 199391117.68$1,609
Apr 199392118.05$1,661
Mar 199384118.14$1,524
Feb 199385117.90$1,522
Jan 1993111116.93$1,879

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Oil                  194 bbl  × $ 98.93 =    $19,192
Casinghead gas         0 Mcf  × $  2.87 =         $0

────────────────────────────────────────────────────
Month total                                  $19,192

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/10382 is the state's own key, not one this site invented.