FEE "DAAZ"

Operated by W.T. WAGGONER ESTATE, INC. (P-5 887904) in the WILBARGER COUNTY REGULAR field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 11509District 09Field 97331001OilCasinghead gasSaveExport
Value, all time
$1.9 M
Jan 1993 – Jun 2021
Value, last 12 filed months
$14 k
at the published price for each month
Months reported
342
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 583 leases and 3,789 wells, and the rule below applies to all of them.

Discovered
1915-12-31
as the register files it
Field class
Oil
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: THAN 5000FT BR ASSIGNED TO THIS FIELD

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition50,452 bbl$1,861,263
Casinghead gasProduction21 Mcf$0
Total$1,861,263

21 Mcf of this lease's gas, across 21 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (31)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.9472, -99.0453. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.9 miles. 1 well has no surveyed location and is left out of it.

33.94756, -99.04569 · centre of 30 wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
31 of 31 wells
With a plug date
93.5%
29 of 31 wells
Median depth
2,396 ft
30 wells filed one
Completion to plug
21.8 years
median over 4 wells

What the state filed about each well

On the RRC proration schedule
31100.0%
A plug date is filed
2993.5%
BothOn the schedule and plugged. Neither fact cancels the other.
2993.5%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Total depth in feet, 30 of 31 wells. Median 2,396 ft, with the middle half between 2,380 and 2,446 ft; the shallowest is 1,125 ft and the deepest 6,132 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.

When they were last completed

Last completion by decade, 4 of 31 wells, Apr 1976 – Jun 2001. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.

Completions filed
Apr 1976 – Jun 2001
4 of 31 wells; 27 filed none
Plug dates filed
Oct 1982 – Dec 2020
29 of 31 wells; 2 filed none

Last completion to plug: a median of 21.8 years across the 4 wells that filed both dates, with the middle half between 19.5 years and 27.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

31 wells

42-487016271WS6,132 ftDec 1982Yes
42-487818421013,204 ftNov 1982Yes
42-487818431022,391 ftNov 1982Yes
42-487818441042,397 ftNov 1982Yes
42-487818461062,596 ftApr 2004Yes
42-48781847106W2,415 ftMay 2004Yes
42-487818481082,393 ftNov 1982Yes
42-48781849109Yes
42-487818502012,451 ftNov 1982Yes
42-487818512022,420 ftNov 1982Yes
42-487818522032,407 ftDec 1982Yes
42-487818532042,435 ftNov 1982Yes
42-487818543011,125 ftDec 1982Yes
42-487818553021,125 ftDec 1982Yes
42-487818563032,370 ftSep 1987Yes
42-487818573042,377 ftDec 1982Yes
42-487818583052,375 ftNov 1982Yes
42-487818593062,375 ftNov 1982Yes
42-487818603072,390 ftYes
42-48781861102,351 ftDec 2020Yes
42-4878186210112,389 ftNov 1982Yes
42-4878186310122,394 ftNov 2002Yes
42-4878186410132,372 ftOct 1982Yes
42-4878186510152,397 ftMar 2004Yes
42-4878186610162,390 ftNov 1982Yes
42-4878186710172,412 ftNov 1982Yes
42-4878186810182,450 ftNov 1982Yes
42-48732437202,502 ftJun 2001Nov 2020Yes
42-48732436192,505 ftJun 2001Dec 2020Yes
42-487321411M2,460 ftSep 1996Nov 2020Yes
42-487818451052,388 ftApr 1976Sep 2011Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (342)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

342 months

Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 2021114060.362.76$6,881
Mar 2021119061.302.72$7,295
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 2019167056.272.46$9,397
Jun 20190052.782.49$0
May 2019166058.482.74$9,708
Apr 20190062.632.75$0
Mar 2019167056.803.06$9,486
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 2018167061.443.40$10,260
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 2018167065.142.93$10,878
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 2018169063.842.90$10,789
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 2018171062.874.01$10,751
Dec 2017167057.272.92$9,564
Nov 20170055.423.12$0
Oct 2017165049.292.98$8,133
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 2017169043.873.09$7,414
Jun 20170042.493.09$0
May 2017166045.373.26$7,531
Apr 20170047.933.21$0
Mar 2017166046.772.98$7,764
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 2016165048.763.72$8,045
Nov 20160042.492.64$0
Oct 2016161046.193.09$7,437
Sep 20160041.553.10$0
Aug 2016166041.442.92$6,879
Jul 20160041.622.92$0
Jun 2016165045.352.69$7,483
May 20160042.521.99$0
Apr 2016166036.561.99$6,069
Mar 20160033.011.79$0
Feb 2016154026.472.06$4,076
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 2015166038.792.17$6,439
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 2015163040.162.87$6,546
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 2015164055.212.96$9,054
Apr 2015169049.822.71$8,420
Mar 20150042.892.93$0
Feb 2015168044.662.98$7,503
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 2014169070.464.25$11,908
Oct 20140078.303.90$0
Sep 2014170086.164.05$14,647
Aug 20140089.394.04$0
Jul 2014169096.564.18$16,319
Jun 20140098.164.74$0
May 2014166094.734.73$15,725
Apr 2014170095.944.81$16,310
Mar 20140095.895.06$0
Feb 2014163097.406.19$15,876
Jan 20140090.404.86$0
Dec 2013168091.824.35$15,426
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 20131610104.113.72$16,762
Aug 201300104.253.52$0
Jul 20131740102.523.72$17,838
Jun 20130094.403.93$0
May 2013164094.834.15$15,552
Apr 20130093.964.28$0
Mar 2013164093.623.91$15,354
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 2012169086.773.42$14,664
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 2012169094.672.92$15,999
Aug 20120092.662.91$0
Jul 2012172085.133.02$14,642
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 20121690101.652.00$17,179
Mar 201200105.052.22$0
Feb 20121720101.102.57$17,389
Jan 20120098.092.73$0
Dec 2011170096.873.24$16,468
Nov 20110095.723.31$0
Oct 2011168084.983.65$14,277
Sep 20110083.623.99$0
Aug 2011168083.404.15$14,011
Jul 20110094.144.52$0
Jun 2011169092.904.64$15,700
May 2011170098.134.40$16,682
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 2011165085.644.18$14,131
Jan 20110086.504.59$0
Dec 2010167085.734.35$14,317
Nov 20100080.843.80$0
Oct 2010163078.103.51$12,730
Sep 2010164072.633.98$11,911
Aug 20100073.684.42$0
Jul 2010164072.554.74$11,898
Jun 20100070.364.91$0
May 2010171071.124.24$12,162
Apr 20100081.694.12$0
Mar 2010167078.394.39$13,091
Feb 20100073.585.44$0
Jan 2010163074.365.96$12,121
Dec 20090071.445.48$0
Nov 2009166074.593.75$12,382
Oct 20090072.544.11$0
Sep 2009161065.543.06$10,552
Aug 20090067.423.22$0
Jul 2009169061.133.46$10,331
Jun 2009170066.163.90$11,247
May 2009165054.743.93$9,032
Apr 20090046.773.59$0
Mar 2009165042.144.06$6,953
Feb 2009175032.814.63$5,742
Jan 20090035.865.37$0
Dec 2008176037.105.98$6,530
Nov 2008174055.496.86$9,655
Oct 20080075.246.92$0
Sep 20081720101.767.88$17,503
Aug 20081710114.228.48$19,532
Jul 200800131.0811.39$0
Jun 20081720131.3313.03$22,589
May 20081740123.1711.57$21,432
Apr 20081700110.3110.45$18,753
Mar 20081720101.909.66$17,527
Feb 20080092.538.77$0
Jan 2008179090.388.21$16,178
Dec 2007173088.337.30$15,281
Nov 2007177091.677.29$16,226
Oct 20070082.856.92$0
Sep 2007174075.846.24$13,196
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 2007173062.007.55$10,726
May 20070058.747.85$0
Apr 2007177059.617.81$10,551
Mar 2007174056.927.30$9,904
Feb 2007174055.108.22$9,587
Jan 20070050.306.73$0
Dec 2006344056.656.92$19,488
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 2006165060.085.04$9,913
Aug 2006166068.717.34$11,406
Jul 2006167069.376.34$11,585
Jun 2006163066.286.38$10,804
May 2006171066.016.42$11,288
Apr 2006167064.397.36$10,753
Mar 2006168056.707.08$9,526
Feb 2006174057.597.75$10,021
Jan 2006171060.598.93$10,361
Dec 2005166054.9413.42$9,120
Nov 2005172054.6910.59$9,407
Oct 20050058.3413.80$0
Sep 2005170061.4512.08$10,447
Aug 2005170061.519.80$10,457
Jul 2005340055.697.84$18,935
Jun 2005171052.337.38$8,948
May 20050045.226.65$0
Apr 2005171049.207.36$8,413
Mar 2005166050.377.15$8,361
Feb 2005171045.226.31$7,733
Jan 2005174043.166.32$7,510
Dec 2004172039.866.75$6,856
Nov 2004175045.286.33$7,924
Oct 2004166049.706.52$8,250
Sep 2004172043.245.28$7,437
Aug 2004172042.375.55$7,288
Jul 2004341038.286.08$13,053
Jun 2004168036.106.43$6,065
May 20040037.486.49$0
Apr 2004171034.475.86$5,894
Mar 2004169034.365.53$5,807
Feb 2004177032.455.51$5,744
Jan 2004174032.036.30$5,573
Dec 2003173030.266.30$5,235
Nov 2003171028.804.60$4,925
Oct 2003174028.174.76$4,902
Sep 2003343026.314.75$9,024
Aug 2003175029.765.13$5,208
Jul 2003173029.415.17$5,088
Jun 2003170028.565.98$4,855
May 2003173026.595.97$4,600
Apr 2003353026.675.41$9,415
Mar 2003173031.146.10$5,387
Feb 2003172033.487.93$5,759
Jan 2003173030.315.58$5,244
Dec 2002177026.914.85$4,763
Nov 2002174024.664.14$4,291
Oct 2002176026.464.23$4,657
Sep 2002169027.443.64$4,637
Aug 2002347025.963.16$9,008
Jul 2002173024.583.06$4,252
Jun 2002173023.733.34$4,105
May 2002348024.663.58$8,582
Apr 2002172023.653.51$4,068
Mar 2002174022.003.10$3,828
Feb 2002176018.222.38$3,207
Jan 2002174017.172.38$2,988
Dec 2001341016.932.36$5,773
Nov 2001175018.072.41$3,162
Oct 2001520019.782.53$10,286
Sep 2001170024.262.25$4,124
Aug 2001431024.873.05$10,719
Jul 2001688023.933.20$16,464
Jun 2001511024.563.82$12,550
May 2001170025.524.31$4,338
Apr 2001171024.685.34$4,220
Mar 2001173024.545.38$4,245
Feb 2001186027.755.77$5,162
Jan 2001190027.478.40$5,219
Dec 2000183026.889.12$4,919
Nov 2000188032.215.66$6,055
Oct 2000187031.235.15$5,840
Sep 2000184031.875.19$5,864
Aug 2000367029.644.54$10,878
Jul 2000184028.534.09$5,250
Jun 2000182029.304.40$5,333
May 2000181027.263.68$4,934
Apr 2000185024.513.12$4,534
Mar 2000185028.422.86$5,258
Feb 2000186027.622.73$5,137
Jan 2000186025.272.48$4,700
Dec 1999189024.282.42$4,589
Nov 1999185023.192.43$4,290
Oct 1999182020.982.80$3,818
Sep 1999187021.752.62$4,067
Aug 1999180019.262.88$3,467
Jul 1999183017.892.37$3,274
Jun 1999371015.942.36$5,914
May 19990015.792.32$0
Apr 1999188015.102.21$2,839
Mar 1999181012.471.84$2,257
Feb 199918209.981.82$1,816
Jan 1999181010.381.90$1,879
Dec 1998009.201.77$0
Nov 1998183010.892.19$1,993
Oct 1998180012.421.97$2,236
Sep 1998181012.592.08$2,279
Aug 1998179011.301.91$2,023
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 1998177012.622.21$2,234
Apr 1998356013.042.51$4,642
Mar 1998176012.802.31$2,253
Feb 1998179013.952.30$2,497
Jan 1998174014.702.15$2,558
Dec 1997180016.322.41$2,938
Nov 1997182018.193.09$3,311
Oct 1997353019.253.15$6,795
Sep 1997179017.742.95$3,175
Aug 1997175017.862.55$3,126
Jul 1997183017.582.25$3,217
Jun 1997355017.242.26$6,120
May 1997176018.972.31$3,339
Apr 1997364017.882.08$6,508
Mar 1997361018.951.94$6,841
Feb 19970020.492.21$0
Jan 1997179023.483.54$4,203
Dec 1996360023.32$8,395
Nov 1996185021.97$4,064
Oct 1996181023.31$4,219
Sep 1996360022.22$7,999
Aug 1996182020.26$3,687
Jul 1996176019.55$3,441
Jun 1996177018.73$3,315
May 1996357019.43$6,937
Apr 1996175021.51$3,764
Mar 1996183019.38$3,547
Feb 1996358016.98$6,079
Jan 1996192017.07$3,277
Dec 1995182017.19$3,129
Nov 1995368016.00$5,888
Oct 1995378015.43$5,833
Sep 1995347016.18$5,614
Aug 1995177015.92$2,818
Jul 1995186015.24$2,835
Jun 1995568016.41$9,321
May 1995376017.56$6,603
Apr 19950017.73$0
Mar 1995271016.44$4,455
Feb 1995272016.58$4,510
Jan 1995277015.92$4,410
Dec 1994259015.03$3,893
Nov 1994271015.90$4,309
Oct 1994273015.58$4,253
Sep 1994269115.29$4,113
Aug 1994268116.13$4,323
Jul 1994266117.56$4,671
Jun 1994268117.09$4,580
May 1994270115.88$4,288
Apr 1994538114.14$7,607
Mar 1994272112.46$3,389
Feb 1994273112.50$3,413
Jan 1994272112.66$3,444
Dec 1993272112.33$3,354
Nov 1993536114.49$7,767
Oct 1993272115.85$4,311
Sep 1993273115.03$4,103
Aug 1993311115.66$4,870
Jul 1993529115.46$8,178
Jun 1993270116.79$4,533
May 1993269117.68$4,756
Apr 1993271118.05$4,892
Mar 1993537118.14$9,741
Feb 1993277117.90$4,958
Jan 1993545116.93$9,227

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2021 — as filed, then multipliedworked
Oil                  114 bbl  × $ 60.36 =     $6,881
Casinghead gas         0 Mcf  × $  2.76 =         $0

────────────────────────────────────────────────────
Month total                                   $6,881

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/11509 is the state's own key, not one this site invented.