ABBOTT, OSCAR, ETAL

Operated by BETWELL OIL & GAS COMPANY (P-5 68405) in the PADGITT, WEST (MISSISSIPPI) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 11755District 09Field 68321500Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$1.4 M
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 9 leases and 10 wells, and the rule below applies to all of them.

Discovered
1960-09-17
as the register files it
Field class
Oil
the register's own label
Between wells
1,320 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 80 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition27,799 bbl$1,353,079
Casinghead gasProduction383 Mcf$1,413
Total$1,354,493

48 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.2988, -98.9408. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.2 miles.

33.29880, -98.94078 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
2 of 2 wells
With a plug date
100.0%
2 of 2 wells
Median depth
4,807 ft
2 wells filed one
Completion to plug
58.4 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
2100.0%
A plug date is filed
2100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
2100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 4,722 and 4,891 ft, median 4,807 ft, over the 2 wells that filed a depth.

Completions filed
Dec 1966
1 of 2 wells; 1 filed none
Plug dates filed
May 2025 – Jun 2025
2 of 2 wells

Last completion to plug: a median of 58.4 years across the 1 well that filed both dates, with the middle half between 58.4 years and 58.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

2 wells

42-5038312214,722 ftJun 2025Yes
42-5038312324,891 ftDec 1966May 2025Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250167.704.27$4
Feb 20250170.884.34$4
Jan 20250174.324.28$4
Dec 20240168.993.12$3
Nov 20240169.052.20$2
Oct 20240171.372.28$2
Sep 20240169.612.36$2
Aug 20240175.632.06$2
Jul 20240179.932.15$2
Jun 20240178.082.63$3
May 20240178.812.20$2
Apr 2024171184.451.66$14,443
Mar 20240180.301.55$2
Feb 20240176.091.78$2
Jan 20240173.023.30$3
Dec 2023168171.262.61$11,974
Nov 20230177.892.81$3
Oct 20230185.443.09$3
Sep 2023168189.042.74$14,961
Aug 20230180.522.67$3
Jul 2023176174.852.64$13,176
Jun 20230168.962.26$2
May 2023171170.622.23$12,078
Apr 20230178.122.24$2
Mar 2023175172.852.39$12,751
Feb 20230175.112.47$2
Jan 20230176.533.39$3
Dec 20220176.415.73$6
Nov 2022166185.005.65$14,116
Oct 2022173187.185.86$15,088
Sep 20220184.888.16$8
Aug 20220194.529.13$9
Jul 20221671101.587.54$16,971
Jun 202201115.097.98$8
May 202201109.378.43$8
Apr 202201104.226.84$7
Mar 20221661108.885.08$18,079
Feb 20220191.054.86$5
Jan 2022174181.844.54$14,245
Dec 20210171.323.90$4
Nov 2021180177.435.24$13,943
Oct 20210179.795.71$6
Sep 2021170169.865.35$11,882
Aug 20210166.024.22$4
Jul 2021167170.783.98$11,824
Jun 20210169.493.38$3
May 20210163.483.02$3
Apr 20210160.362.76$3
Mar 2021175161.302.72$10,730
Feb 20210157.805.55$6
Jan 20210150.412.81$3
Dec 20200144.642.68$3
Nov 2020174138.772.71$6,749
Oct 20200136.972.48$2
Sep 2020173137.091.99$6,419
Aug 20200139.982.39$2
Jul 2020174138.371.83$6,678
Jun 2020172134.901.69$6,004
May 20200116.921.81$2
Apr 20200114.751.80$2
Mar 20200130.341.86$2
Feb 20200149.881.98$2
Jan 2020171157.252.09$9,792
Dec 20190159.012.30$2
Nov 2019174155.302.75$9,625
Oct 20190153.472.42$2
Sep 20190155.052.66$3
Aug 2019174153.112.30$9,243
Jul 20190156.272.46$2
Jun 20190152.782.49$2
May 2019172158.482.74$10,061
Apr 20190162.632.75$3
Mar 2019172156.803.06$9,773
Feb 20190150.852.79$3
Jan 20190146.033.23$3
Dec 2018172146.594.19$8,018
Nov 20180152.934.24$4
Oct 2018171161.443.40$10,510
Sep 20180159.543.11$3
Aug 2018174159.403.07$10,339
Jul 20180165.142.93$3
Jun 20180160.183.08$3
May 2018168165.382.90$10,987
Apr 20180163.842.90$3
Mar 2018182161.222.79$11,145
Feb 20180161.782.77$3
Jan 20180162.874.01$4
Dec 2017169157.272.92$9,682
Nov 20170155.423.12$3
Oct 20170149.292.98$3
Sep 2017170147.523.09$8,081
Aug 20170145.373.00$3
Jul 20170143.873.09$3
Jun 2017166142.493.09$7,056
May 20170145.373.26$3
Apr 20170147.933.21$3
Mar 2017166146.772.98$7,767
Feb 20170150.452.95$3
Jan 20170149.413.42$3
Dec 2016165148.763.72$8,049
Nov 20160142.492.64$3
Oct 2016168146.193.09$7,763
Sep 20160141.553.10$3
Aug 20160141.442.92$3
Jul 2016169141.622.92$7,037
Jun 20160145.352.69$3
May 2016163142.521.99$6,933
Apr 20160136.561.99$2
Mar 20160133.011.79$2
Feb 2016164126.472.06$4,343
Jan 20160127.352.36$2
Dec 2015167132.362.00$5,406
Nov 201545138.792.17$1,748
Oct 2015169143.552.43$7,362
Sep 20150142.992.76$3
Aug 20150140.162.87$3
Jul 2015167148.152.95$8,044
Jun 20150156.152.88$3
May 2015173155.212.96$9,554
Apr 2015172149.822.71$8,572
Mar 20150142.892.93$3
Feb 20150144.662.98$3
Jan 2015170143.433.10$7,386
Dec 20140154.693.59$4
Nov 20140170.464.25$4
Oct 2014158178.303.90$12,375
Sep 20140186.164.05$4
Aug 20140189.394.04$4
Jul 20140196.564.18$4
Jun 2014168198.164.74$16,496
May 20140194.734.73$5
Apr 2014162195.944.81$15,547
Mar 20140195.895.06$5
Feb 2014168197.406.19$16,369
Jan 20140190.404.86$5
Dec 20130191.824.35$4
Nov 2013174188.853.74$15,464
Oct 20130197.423.78$4
Sep 20131701104.113.72$17,702
Aug 201301104.253.52$4
Jul 20131741102.523.72$17,842
Jun 20130194.403.93$4
May 20130194.834.15$4
Apr 2013179193.964.28$16,823
Mar 20130193.623.91$4
Feb 20130191.233.42$3
Jan 20130191.603.42$3
Dec 2012175186.773.42$15,188
Nov 20120186.953.62$4
Oct 20120189.383.40$3
Sep 2012175194.672.92$16,570
Aug 20120192.662.91$3
Jul 2012176185.133.02$14,986
Jun 20120179.822.52$3
May 20120191.612.49$2
Apr 20121751101.652.00$17,791
Mar 201201105.052.22$2
Feb 201201101.102.57$3
Jan 2012167198.092.73$16,384
Dec 20110196.873.24$3
Nov 20110195.723.31$3
Oct 2011176184.983.65$14,960
Sep 20110183.623.99$4
Aug 2011174183.404.15$14,516
Jul 20110194.144.52$5
Jun 2011164192.904.64$15,240
May 20110198.134.40$4
Apr 20111751105.964.33$18,547
Mar 20110196.364.06$4
Feb 20110185.644.18$4
Jan 2011178186.504.59$15,402
Dec 20100185.734.35$4
Nov 20100180.843.80$4
Oct 2010169178.103.51$13,202
Sep 20100172.633.98$4
Aug 2010175173.684.42$12,898
Jul 20100172.554.74$5
Jun 2010176170.364.91$12,388
May 20100171.124.24$4
Apr 20100181.694.12$4
Mar 2010177178.394.39$13,879
Feb 20100173.585.44$5
Jan 2010171174.365.96$12,722
Dec 20090171.445.48$5
Nov 2009167174.593.75$12,460
Oct 20090172.544.11$4
Sep 2009177165.543.06$11,604
Aug 20090167.423.22$3
Jul 2009174161.133.46$10,640
Jun 20090166.163.90$4
May 2009177154.743.93$9,693
Apr 2009173146.773.59$8,095
Mar 20090142.144.06$4
Feb 20090132.814.63$5
Jan 2009176135.865.37$6,317
Dec 20080137.105.98$6
Nov 20080155.496.86$7
Oct 2008166175.246.92$12,497
Sep 200801101.767.88$8
Aug 200801114.228.48$8
Jul 20081731131.0811.39$22,688
Jun 20081721131.3313.03$22,602
May 200801123.1711.57$12
Apr 200801110.3110.45$10
Mar 20081751101.909.66$17,842
Feb 20080192.538.77$9
Jan 2008182190.388.21$16,457
Dec 20070188.337.30$7
Nov 20070191.677.29$7
Oct 2007175182.856.92$14,506
Sep 20070175.846.24$6
Aug 2007167169.066.39$11,539
Jul 2007177170.906.39$12,556
Jun 20070162.007.55$8
May 2007167158.747.85$9,817
Apr 20070159.617.81$8
Mar 2007175156.927.30$9,968
Feb 20070155.108.22$8
Jan 2007175150.306.73$8,809
Dec 20060156.656.92$7
Nov 2006170154.207.62$9,222
Oct 20060154.906.01$6
Sep 20060160.085.04$5
Aug 20060168.717.34$7
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060166.016.42$6
Apr 20060164.397.36$7
Mar 2006169156.707.08$9,589
Feb 2006170157.597.75$9,798
Jan 20060160.598.93$9
Dec 2005181154.9413.42$9,958
Nov 2005170154.6910.59$9,308
Oct 20050158.3413.80$14
Sep 20050161.4512.08$12
Aug 2005185161.519.80$11,389
Jul 2005170155.697.84$9,475
Jun 20050152.337.38$7
May 2005170145.226.65$7,694
Apr 20050149.207.36$7
Mar 2005170150.377.15$8,570
Feb 2005174045.226.31$7,868
Jan 20050043.166.32$0
Dec 20040139.866.75$7
Nov 20040145.286.33$6
Oct 20040149.706.52$7
Sep 20040143.245.28$5
Aug 20040142.375.55$6
Jul 20040138.286.08$6
Jun 2004339136.106.43$12,244
May 20040137.486.49$6
Apr 2004177134.475.86$6,107
Mar 20040134.365.53$6
Feb 2004177132.455.51$5,749
Jan 20040132.036.30$6
Dec 2003173130.266.30$5,241
Nov 20030128.804.60$5
Oct 2003168128.174.76$4,737
Sep 20030126.314.75$5
Aug 20030129.765.13$5
Jul 2003168129.415.17$4,946
Jun 20030128.565.98$6
May 2003171126.595.97$4,553
Apr 20030126.675.41$5
Mar 2003172131.146.10$5,362
Feb 2003166133.487.93$5,566
Jan 20030130.315.58$6
Dec 2002177126.914.85$4,768
Nov 20020124.664.14$4
Oct 2002168126.464.23$4,450
Sep 20020127.443.64$4
Aug 2002168125.963.16$4,364
Jul 2002152124.583.06$3,739
Jun 2002175123.733.34$4,156
May 20020124.663.58$4
Apr 20020123.653.51$4
Mar 2002175122.003.10$3,853
Feb 2002164118.222.38$2,990
Jan 20020117.172.38$2
Dec 2001184116.932.36$3,117
Nov 20010118.072.41$2
Oct 20010119.782.53$3
Sep 20012124.262.25$51
Aug 20010124.873.05$3
Jul 20010123.933.20$3
Jun 20010124.563.82$4
May 20010125.524.31$4
Apr 2001167124.685.34$4,127
Mar 2001169124.545.38$4,153
Feb 2001191127.755.77$5,306
Jan 20010127.478.40$8
Dec 20000126.889.12$9
Nov 2000182132.215.66$5,868
Oct 2000189131.235.15$5,908
Sep 20000131.875.19$5
Aug 20000129.644.54$5
Jul 2000168128.534.09$4,797
Jun 2000187129.304.40$5,484
May 20000127.263.68$4
Apr 20000124.513.12$3
Mar 2000168128.422.86$4,777
Feb 20000127.622.73$3
Jan 2000168125.272.48$4,248
Dec 19990124.282.42$2
Nov 19990123.192.43$2
Oct 1999173120.982.80$3,632
Sep 19990121.752.62$3
Aug 1999170119.262.88$3,277
Jul 19990117.892.37$2
Jun 19990115.942.36$2
May 1999182115.792.32$2,876
Apr 19990115.102.21$2
Mar 1999176112.471.84$2,197
Feb 1999019.981.82$2
Jan 1999176110.381.90$1,829
Dec 1998019.201.77$2
Nov 1998178110.892.19$1,941
Oct 19980112.421.97$2
Sep 1998183112.592.08$2,306
Aug 19980111.301.91$2
Jul 1998171111.742.24$2,010
Jun 1998173111.242.24$1,947
May 1998171112.622.21$2,160
Apr 19980113.042.51$3
Mar 1998173112.802.31$2,217
Feb 1998178113.952.30$2,485
Jan 19980114.702.15$2
Dec 1997171116.322.41$2,793
Nov 19970118.193.09$3
Oct 1997175119.253.15$3,372
Sep 19970117.742.95$3
Aug 1997181117.862.55$3,235
Jul 19970117.582.25$2
Jun 19970117.242.26$2
May 1997137118.972.31$2,601
Apr 19970117.882.08$2
Mar 19970118.951.94$2
Feb 1997141120.492.21$2,891
Jan 19970123.483.54$4
Dec 1996107123.32$2,495
Nov 19960121.97$0
Oct 19960123.31$0
Sep 1996178122.22$3,955
Aug 19960120.26$0
Jul 1996177119.55$3,460
Jun 19960118.73$0
May 19960119.43$0
Apr 1996174121.51$3,743
Mar 19960119.38$0
Feb 1996272116.98$4,619
Jan 19960117.07$0
Dec 1995355117.19$6,102
Nov 19950116.00$0
Oct 19950115.43$0
Sep 19950116.18$0
Aug 1995146115.92$2,324
Jul 1995185115.24$2,819
Jun 19950116.41$0
May 19950117.56$0
Apr 1995156117.73$2,766
Mar 1995178116.44$2,926
Feb 19950116.58$0
Jan 19950115.92$0
Dec 1994179115.03$2,690
Nov 19940115.90$0
Oct 19940115.58$0
Sep 1994114115.29$1,743
Aug 1994106116.13$1,710
Jul 1994172117.56$3,020
Jun 19940117.09$0
May 1994176115.88$2,795
Apr 1994177114.14$2,503
Mar 19940112.46$0
Feb 19940112.50$0
Jan 1994173112.66$2,190
Dec 19930112.33$0
Nov 1993177114.49$2,565
Oct 1993179115.85$2,837
Sep 19930115.03$0
Aug 19930115.66$0
Jul 1993178115.46$2,752
Jun 19930116.79$0
May 1993176117.68$3,112
Apr 19930118.05$0
Mar 1993125118.14$2,268
Feb 1993179117.90$3,204
Jan 19930116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2025 — as filed, then multipliedworked
Oil                    0 bbl  × $ 67.70 =         $0
Casinghead gas         1 Mcf  × $  4.27 =         $4

────────────────────────────────────────────────────
Month total                                       $4

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/11755 is the state's own key, not one this site invented.