Operated by TAYLOR & SMITH (P-5 839580) in the HARBOLT (WINGER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 16673District 09Field 38950500OilCasinghead gasSaveExport
Value, all time
$146 k
Jan 1993 – Mar 2009
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
195
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7 leases and 28 wells, and the rule below applies to all of them.

Discovered
1971-04-01
as the register files it
Field class
Oil
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres.

The Commission's schedule remark for this field reads: TRANS. FROM COOKE CO. REGULAR 4-1-71

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition7,827 bbl$145,090
Casinghead gasProduction800 Mcf$1,287
Total$146,378

425 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.6968, -97.0845. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.69678, -97.08449 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,925 ft
1 wells filed one
Completion to plug
36.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,925 ft.

Completions filed
Nov 1971
1 of 1 wells
Plug dates filed
Dec 2007
1 of 1 wells

Last completion to plug: a median of 36.1 years across the 1 well that filed both dates, with the middle half between 36.1 years and 36.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0970162514,925 ftNov 1971Dec 2007Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (195)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

195 months

Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 200950035.865.37$1,793
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060154.207.62$8
Oct 20060154.906.01$6
Sep 20060160.085.04$5
Aug 20060168.717.34$7
Jul 20060169.376.34$6
Jun 20060166.286.38$6
May 20060166.016.42$6
Apr 20060164.397.36$7
Mar 20060156.707.08$7
Feb 20060157.597.75$8
Jan 20060160.598.93$9
Dec 20050154.9413.42$13
Nov 20050154.6910.59$11
Oct 20050158.3413.80$14
Sep 20050161.4512.08$12
Aug 20050161.519.80$10
Jul 20050155.697.84$8
Jun 20050152.337.38$7
May 20050145.226.65$7
Apr 20050149.207.36$7
Mar 20050150.377.15$7
Feb 20050145.226.31$6
Jan 20050143.166.32$6
Dec 20040139.866.75$7
Nov 20040145.286.33$6
Oct 20040149.706.52$7
Sep 20040143.245.28$5
Aug 20040142.375.55$6
Jul 20040138.286.08$6
Jun 20040136.106.43$6
May 20040137.486.49$6
Apr 2004161234.475.86$5,561
Mar 20040134.365.53$6
Feb 20040132.455.51$6
Jan 20040132.036.30$6
Dec 20030130.266.30$6
Nov 20030128.804.60$5
Oct 20030128.174.76$5
Sep 20030126.314.75$5
Aug 20030129.765.13$5
Jul 20030129.415.17$5
Jun 20030128.565.98$6
May 20030126.595.97$6
Apr 20030126.675.41$5
Mar 20030131.146.10$6
Feb 20030133.487.93$8
Jan 20030130.315.58$6
Dec 2002160126.914.85$4,310
Nov 20020124.664.14$4
Oct 20020126.464.23$4
Sep 20020127.443.64$4
Aug 20020125.963.16$3
Jul 20020424.583.06$12
Jun 20020123.733.34$3
May 20020124.663.58$4
Apr 20020123.653.51$4
Mar 20020122.003.10$3
Feb 20020018.222.38$0
Jan 20020117.172.38$2
Dec 20010016.932.36$0
Nov 20010118.072.41$2
Oct 20010019.782.53$0
Sep 20010124.262.25$2
Aug 20010024.873.05$0
Jul 20010123.933.20$3
Jun 20010324.563.82$11
May 2001164225.524.31$4,194
Apr 20010324.685.34$16
Mar 20010424.545.38$22
Feb 20010427.755.77$23
Jan 2001170327.478.40$4,695
Dec 20000426.889.12$36
Nov 20000532.215.66$28
Oct 20000431.235.15$21
Sep 2000171531.875.19$5,476
Aug 20000329.644.54$14
Jul 20000428.534.09$16
Jun 20000429.304.40$18
May 20000327.263.68$11
Apr 2000182424.513.12$4,473
Mar 20000428.422.86$11
Feb 20000327.622.73$8
Jan 20000425.272.48$10
Dec 1999168624.282.42$4,094
Nov 19990523.192.43$12
Oct 1999164720.982.80$3,460
Sep 19990621.752.62$16
Aug 19990119.262.88$3
Jul 19990317.892.37$7
Jun 19990415.942.36$9
May 1999177515.792.32$2,806
Apr 19990415.102.21$9
Mar 19990512.471.84$9
Feb 1999049.981.82$7
Jan 1999160210.381.90$1,665
Dec 1998059.201.77$9
Nov 19980610.892.19$13
Oct 19981811112.421.97$2,270
Sep 19980612.592.08$13
Aug 1998181711.301.91$2,059
Jul 19980511.742.24$11
Jun 19980711.242.24$16
May 1998130612.622.21$1,654
Apr 1998183013.042.51$2,386
Mar 19980812.802.31$18
Feb 19980613.952.30$14
Jan 1998176614.702.15$2,600
Dec 199701016.322.41$24
Nov 19970818.193.09$25
Oct 1997181919.253.15$3,513
Sep 19970917.742.95$27
Aug 1997181917.862.55$3,256
Jul 19971841617.582.25$3,271
Jun 199701017.242.26$23
May 19971831118.972.31$3,497
Apr 199701217.882.08$25
Mar 1997181518.951.94$3,440
Feb 19970820.492.21$18
Jan 19971861223.483.54$4,410
Dec 1996179823.32$4,174
Nov 199601421.97$0
Oct 19961811223.31$4,219
Sep 1996180822.22$4,000
Aug 199601220.26$0
Jul 19961851519.55$3,617
Jun 199601118.73$0
May 1996179719.43$3,478
Apr 19960821.51$0
Mar 19960819.38$0
Feb 1996181916.98$3,073
Jan 19961821017.07$3,107
Dec 199501017.19$0
Nov 19950816.00$0
Oct 1995188715.43$2,901
Sep 19950916.18$0
Aug 1995183715.92$2,913
Jul 19950915.24$0
Jun 1995185916.41$3,036
May 19950917.56$0
Apr 1995177917.73$3,138
Mar 199501116.44$0
Feb 19950416.58$0
Jan 1995183715.92$2,913
Dec 19940815.03$0
Nov 1994186815.90$2,957
Oct 19940715.58$0
Sep 1994179815.29$2,737
Aug 199401016.13$0
Jul 1994174917.56$3,055
Jun 19940617.09$0
May 19940815.88$0
Apr 19941801014.14$2,545
Mar 199401112.46$0
Feb 1994183812.50$2,288
Jan 199401012.66$0
Dec 19931881012.33$2,318
Nov 19931841114.49$2,666
Oct 19930815.85$0
Sep 19931811215.03$2,720
Aug 199301015.66$0
Jul 19931751015.46$2,706
Jun 199301316.79$0
May 19933401217.68$6,011
Apr 19930518.05$0
Mar 19930618.14$0
Feb 19930317.90$0
Jan 19930116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2009 — as filed, then multipliedworked
Oil                   50 bbl  × $ 35.86 =     $1,793
Casinghead gas         0 Mcf  × $  5.37 =         $0

────────────────────────────────────────────────────
Month total                                   $1,793

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/16673 is the state's own key, not one this site invented.