BRANTLEY, OLA UNIT

Operated by PERSON, CLAUDE (P-5 657602) in the NEWPORT, WEST (CONGLOMERATE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 18120District 09Field 65365500OilCasinghead gasSaveExport
Value, all time
$401 k
Jan 1993 – Apr 2007
Value, last 12 filed months
$9 k
at the published price for each month
Months reported
172
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 9 leases and 9 wells, and the rule below applies to all of them.

Discovered
1953-12-18
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 02/01/88.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition3,004 bbl$68,260
Casinghead gasProduction93,535 Mcf$332,312
Total$400,572

17,554 Mcf of this lease's gas, across 39 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.4508, -98.0795. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.45084, -98.07954 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,635 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,635 ft.

Completions filed
May 2013
1 of 1 wells

1 well

42-2373124816,635 ftMay 2013Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (172)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

172 months

Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 200723055.108.22$1,267
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 2006064766.286.38$4,130
May 2006060466.016.42$3,881
Apr 2006058364.397.36$4,291
Mar 2006062556.707.08$4,427
Feb 2006056957.597.75$4,410
Jan 2006062160.598.93$5,548
Dec 2005061554.9413.42$8,250
Nov 2005066954.6910.59$7,084
Oct 2005057258.3413.80$7,891
Sep 2005047261.4512.08$5,701
Aug 200517865161.519.80$17,327
Jul 2005074255.697.84$5,820
Jun 2005055252.337.38$4,074
May 2005068845.226.65$4,576
Apr 2005065349.207.36$4,806
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 2005035543.166.32$2,244
Dec 2004065339.866.75$4,408
Nov 2004063145.286.33$3,995
Oct 2004066049.706.52$4,300
Sep 2004065543.245.28$3,461
Aug 2004068042.375.55$3,774
Jul 2004068638.286.08$4,174
Jun 2004069436.106.43$4,465
May 2004065037.486.49$4,221
Apr 2004054534.475.86$3,193
Mar 2004061534.365.53$3,401
Feb 2004062232.455.51$3,427
Jan 2004066932.036.30$4,214
Dec 2003068530.266.30$4,317
Nov 200317765428.804.60$8,103
Oct 2003065028.174.76$3,094
Sep 2003063726.314.75$3,025
Aug 2003066229.765.13$3,396
Jul 2003065329.415.17$3,377
Jun 2003063728.565.98$3,811
May 2003066426.595.97$3,966
Apr 2003063926.675.41$3,455
Mar 2003067731.146.10$4,127
Feb 2003056533.487.93$4,478
Jan 200314866530.315.58$8,198
Dec 2002067726.914.85$3,286
Nov 2002065924.664.14$2,726
Oct 2002069326.464.23$2,931
Sep 2002059027.443.64$2,145
Aug 2002075625.963.16$2,392
Jul 2002081224.583.06$2,486
Jun 2002058623.733.34$1,956
May 2002078124.663.58$2,799
Apr 200218347623.653.51$6,000
Mar 2002065822.003.10$2,042
Feb 2002049018.222.38$1,164
Jan 2002062017.172.38$1,473
Dec 2001065416.932.36$1,546
Nov 2001067718.072.41$1,629
Oct 2001062419.782.53$1,578
Sep 2001055624.262.25$1,252
Aug 2001051824.873.05$1,582
Jul 2001041223.933.20$1,317
Jun 2001053724.563.82$2,054
May 2001065925.524.31$2,839
Apr 2001063224.685.34$3,372
Mar 2001066324.545.38$3,565
Feb 200117061627.755.77$8,270
Jan 2001068327.478.40$5,736
Dec 2000066726.889.12$6,085
Nov 2000065232.215.66$3,689
Oct 2000067031.235.15$3,447
Sep 2000067631.875.19$3,506
Aug 2000071229.644.54$3,233
Jul 2000070128.534.09$2,867
Jun 2000069429.304.40$3,052
May 2000072127.263.68$2,653
Apr 200013367924.513.12$5,376
Mar 2000069628.422.86$1,990
Feb 2000064227.622.73$1,750
Jan 2000065025.272.48$1,612
Dec 1999066024.282.42$1,600
Nov 1999064923.192.43$1,580
Oct 1999069920.982.80$1,960
Sep 199913964921.752.62$4,723
Aug 1999071419.262.88$2,053
Jul 1999077817.892.37$1,846
Jun 1999069715.942.36$1,646
May 1999068215.792.32$1,583
Apr 1999070115.102.21$1,548
Mar 1999075912.471.84$1,395
Feb 199906709.981.82$1,218
Jan 199916274410.381.90$3,095
Dec 199807269.201.77$1,287
Nov 1998071410.892.19$1,561
Oct 1998078512.421.97$1,546
Sep 1998077012.592.08$1,604
Aug 1998079511.301.91$1,516
Jul 1998078711.742.24$1,761
Jun 1998080811.242.24$1,808
May 1998084812.622.21$1,871
Apr 199814280013.042.51$3,856
Mar 1998080812.802.31$1,866
Feb 1998070813.952.30$1,628
Jan 1998074814.702.15$1,612
Dec 1997072416.322.41$1,746
Nov 1997073618.193.09$2,273
Oct 199712179519.253.15$4,833
Sep 1997081417.742.95$2,405
Aug 1997086217.862.55$2,202
Jul 1997087317.582.25$1,962
Jun 1997086617.242.26$1,955
May 199711390518.972.31$4,233
Apr 1997088117.882.08$1,835
Mar 1997085818.951.94$1,664
Feb 1997077920.492.21$1,718
Jan 199713683423.483.54$6,145
Dec 1996081523.32$0
Nov 1996082921.97$0
Oct 1996089923.31$0
Sep 199610688922.22$2,355
Aug 1996095020.26$0
Jul 1996098219.55$0
Jun 1996088218.73$0
May 199613795919.43$2,662
Apr 1996091421.51$0
Mar 199601,00319.38$0
Feb 199612797216.98$2,156
Jan 199601,08617.07$0
Dec 19951261,38617.19$2,166
Nov 19951801,74316.00$2,880
Oct 19950015.43$0
Sep 19950016.18$0
Aug 19950015.92$0
Jul 19950015.24$0
Jun 19950016.41$0
May 199504017.56$0
Apr 1995015617.73$0
Mar 1995037616.44$0
Feb 1995032816.58$0
Jan 19950015.92$0
Dec 19940015.03$0
Nov 1994113015.90$1,797
Oct 19940015.58$0
Sep 19940115.29$0
Aug 19940116.13$0
Jul 19940117.56$0
Jun 1994173117.09$2,957
May 19940115.88$0
Apr 19940114.14$0
Mar 1994170112.46$2,118
Feb 19940112.50$0
Jan 1994034912.66$0
Dec 1993034812.33$0
Nov 1993044814.49$0
Oct 199303915.85$0
Sep 19930115.03$0
Aug 19930115.66$0
Jul 199309615.46$0
Jun 1993017716.79$0
May 1993019017.68$0
Apr 1993024118.05$0
Mar 1993014818.14$0
Feb 19934716217.90$841
Jan 1993013716.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2007 — as filed, then multipliedworked
Oil                   23 bbl  × $ 55.10 =     $1,267
Casinghead gas         0 Mcf  × $  8.22 =         $0

────────────────────────────────────────────────────
Month total                                   $1,267

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/18120 is the state's own key, not one this site invented.