Operated by WISE PRODUCTION COMPANY (P-5 933825) in the SUNSET (CONGLOMERATE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 20439District 09Field 87223375OilCasinghead gasSaveExport
Value, all time
$617 k
Jan 1993 – Jul 2019
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
319
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 54 leases and 66 wells, and the rule below applies to all of them.

Discovered
1963-11-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: DGL 1000 MCF

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition12,241 bbl$380,980
Casinghead gasProduction74,914 Mcf$236,394
Total$617,374

19,461 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.4470, -97.7386. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.2 miles.

33.44700, -97.73861 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
2 of 2 wells
With a plug date
100.0%
2 of 2 wells
Median depth
6,105 ft
2 wells filed one
Completion to plug
23.4 years
median over 2 wells

What the state filed about each well

On the RRC proration schedule
2100.0%
A plug date is filed
2100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
2100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 6,059 and 6,151 ft, median 6,105 ft, over the 2 wells that filed a depth.

Completions filed
Aug 1980 – Sep 1981
2 of 2 wells
Plug dates filed
Nov 1989 – Mar 2019
2 of 2 wells

Last completion to plug: a median of 23.4 years across the 2 wells that filed both dates, with the middle half between 15.8 years and 31.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

2 wells

42-3373173926,151 ftSep 1981Nov 1989Yes
42-3373139616,059 ftAug 1980Mar 2019Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (319)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

319 months

Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 201958050.852.79$2,949
Jan 20190046.033.23$0
Dec 201801546.594.19$63
Nov 20180052.934.24$0
Oct 201809361.443.40$316
Sep 201809359.543.11$289
Aug 201808759.403.07$267
Jul 201809665.142.93$281
Jun 201808160.183.08$249
May 201881065.382.90$5,296
Apr 201808063.842.90$232
Mar 2018010661.222.79$295
Feb 2018010861.782.77$299
Jan 2018012362.874.01$493
Dec 2017012357.272.92$359
Nov 2017013055.423.12$405
Oct 2017012649.292.98$376
Sep 2017012247.523.09$377
Aug 2017012245.373.00$367
Jul 2017012443.873.09$383
Jun 2017011042.493.09$340
May 2017012245.373.26$398
Apr 2017010847.933.21$347
Mar 2017012146.772.98$361
Feb 2017011950.452.95$351
Jan 2017017149.413.42$585
Dec 2016026048.763.72$968
Nov 2016028842.492.64$762
Oct 2016034746.193.09$1,072
Sep 2016028541.553.10$884
Aug 2016019841.442.92$579
Jul 2016031641.622.92$924
Jun 2016028145.352.69$755
May 201601842.521.99$36
Apr 201604036.561.99$80
Mar 2016012733.011.79$228
Feb 2016011726.472.06$241
Jan 2016012327.352.36$291
Dec 2015012932.362.00$258
Nov 2015013338.792.17$288
Oct 2015018143.552.43$439
Sep 2015018742.992.76$516
Aug 2015034140.162.87$980
Jul 2015025248.152.95$742
Jun 2015011956.152.88$343
May 2015017155.212.96$505
Apr 2015030149.822.71$815
Mar 2015017642.892.93$517
Feb 2015020644.662.98$613
Jan 2015023143.433.10$716
Dec 201413520254.693.59$8,109
Nov 2014023770.464.25$1,008
Oct 2014025378.303.90$987
Sep 2014027286.164.05$1,100
Aug 2014024089.394.04$968
Jul 2014023896.564.18$995
Jun 2014022898.164.74$1,080
May 2014019094.734.73$898
Apr 201403695.944.81$173
Mar 2014027195.895.06$1,370
Feb 201409097.406.19$557
Jan 2014011690.404.86$564
Dec 2013027091.824.35$1,176
Nov 2013032188.853.74$1,200
Oct 2013035097.423.78$1,323
Sep 20130369104.113.72$1,372
Aug 20130379104.253.52$1,335
Jul 20130409102.523.72$1,521
Jun 2013043194.403.93$1,695
May 2013039394.834.15$1,631
Apr 2013013493.964.28$574
Mar 2013013593.623.91$528
Feb 2013012991.233.42$441
Jan 2013013191.603.42$448
Dec 2012013786.773.42$469
Nov 2012012686.953.62$457
Oct 2012013689.383.40$462
Sep 2012013694.672.92$397
Aug 2012013092.662.91$378
Jul 2012015385.133.02$462
Jun 2012024779.822.52$622
May 2012036691.612.49$911
Apr 20120381101.652.00$761
Mar 20120377105.052.22$838
Feb 20120140101.102.57$360
Jan 2012026898.092.73$733
Dec 2011012396.873.24$398
Nov 201107195.723.31$235
Oct 2011011584.983.65$420
Sep 2011012083.623.99$478
Aug 2011012883.404.15$531
Jul 201104094.144.52$181
Jun 201107492.904.64$343
May 2011010398.134.40$454
Apr 2011037105.964.33$160
Mar 2011013296.364.06$536
Feb 2011012185.644.18$506
Jan 2011014086.504.59$642
Dec 2010030185.734.35$1,309
Nov 2010024180.843.80$915
Oct 201015218178.103.51$12,506
Sep 2010034372.633.98$1,365
Aug 2010024473.684.42$1,078
Jul 2010017972.554.74$848
Jun 2010032170.364.91$1,576
May 2010028971.124.24$1,224
Apr 2010014481.694.12$594
Mar 2010013678.394.39$597
Feb 2010014073.585.44$762
Jan 2010021474.365.96$1,276
Dec 2009030671.445.48$1,678
Nov 2009035074.593.75$1,313
Oct 2009034572.544.11$1,418
Sep 2009036065.543.06$1,103
Aug 2009038367.423.22$1,233
Jul 2009041361.133.46$1,431
Jun 2009036166.163.90$1,406
May 2009040054.743.93$1,570
Apr 2009036646.773.59$1,313
Mar 20096236142.144.06$4,078
Feb 2009027332.814.63$1,265
Jan 2009046235.865.37$2,481
Dec 2008045637.105.98$2,726
Nov 2008046055.496.86$3,156
Oct 2008047375.246.92$3,274
Sep 20080435101.767.88$3,427
Aug 20080520114.228.48$4,411
Jul 20080185131.0811.39$2,107
Jun 20080121131.3313.03$1,577
May 20080130123.1711.57$1,505
Apr 20080122110.3110.45$1,275
Mar 20080143101.909.66$1,382
Feb 2008012492.538.77$1,088
Jan 2008012890.388.21$1,050
Dec 2007012688.337.30$920
Nov 2007011591.677.29$839
Oct 2007011482.856.92$789
Sep 2007011175.846.24$693
Aug 2007010969.066.39$696
Jul 2007011270.906.39$715
Jun 2007011162.007.55$838
May 2007011258.747.85$879
Apr 2007011159.617.81$866
Mar 2007011356.927.30$825
Feb 2007010355.108.22$846
Jan 20075111350.306.73$3,325
Dec 2006013356.656.92$920
Nov 2006014054.207.62$1,066
Oct 2006014154.906.01$848
Sep 2006013160.085.04$660
Aug 2006014268.717.34$1,042
Jul 2006012669.376.34$799
Jun 2006013166.286.38$836
May 2006010266.016.42$655
Apr 200617812064.397.36$12,345
Mar 2006012956.707.08$914
Feb 2006011257.597.75$868
Jan 2006014560.598.93$1,295
Dec 2005013154.9413.42$1,757
Nov 2005013254.6910.59$1,398
Oct 2005015358.3413.80$2,111
Sep 200517815361.4512.08$12,786
Aug 2005018661.519.80$1,822
Jul 200501555.697.84$118
Jun 2005015252.337.38$1,122
May 2005016345.226.65$1,084
Apr 2005016449.207.36$1,207
Mar 2005016150.377.15$1,152
Feb 2005015145.226.31$953
Jan 200536813643.166.32$16,743
Dec 200418216139.866.75$8,341
Nov 2004015845.286.33$1,000
Oct 200436815149.706.52$19,273
Sep 20041869443.245.28$8,539
Aug 20043619742.375.55$15,834
Jul 2004012038.286.08$730
Jun 200418412436.106.43$7,440
May 200418429037.486.49$8,780
Apr 200418730534.475.86$8,233
Mar 200418415934.365.53$7,202
Feb 200418714132.455.51$6,845
Jan 200417917232.036.30$6,817
Dec 200318726430.266.30$7,322
Nov 200318828228.804.60$6,710
Oct 200318715328.174.76$5,996
Sep 200318314226.314.75$5,489
Aug 200336615029.765.13$11,662
Jul 200318821629.415.17$6,646
Jun 200318326228.565.98$6,794
May 200318829226.595.97$6,743
Apr 200318431226.675.41$6,594
Mar 200318225431.146.10$7,216
Feb 200318022533.487.93$7,810
Jan 200318524230.315.58$6,958
Dec 200218624526.914.85$6,194
Nov 200218425924.664.14$5,609
Oct 200218727326.464.23$6,103
Sep 200218816527.443.64$5,759
Aug 200218922925.963.16$5,631
Jul 20021808924.583.06$4,697
Jun 20021879023.733.34$4,738
May 2002184024.663.58$4,537
Apr 200218415123.653.51$4,882
Mar 200218317022.003.10$4,553
Feb 200218510218.222.38$3,613
Jan 200218818217.172.38$3,660
Dec 200136536116.932.36$7,033
Nov 2001031818.072.41$765
Oct 2001024319.782.53$615
Sep 200118827324.262.25$5,175
Aug 2001024724.873.05$754
Jul 200118833123.933.20$5,557
Jun 200118429724.563.82$5,655
May 200118416525.524.31$5,406
Apr 2001028924.685.34$1,542
Mar 200119322624.545.38$5,951
Feb 2001028727.755.77$1,655
Jan 200136732227.478.40$12,786
Dec 2000025726.889.12$2,344
Nov 200018828132.215.66$7,645
Oct 200018834931.235.15$7,667
Sep 200018034831.875.19$7,542
Aug 2000034929.644.54$1,585
Jul 200018333328.534.09$6,583
Jun 20001837529.304.40$5,692
May 2000021627.263.68$795
Apr 200018120424.513.12$5,072
Mar 200018129728.422.86$5,993
Feb 200018029727.622.73$5,781
Jan 2000031725.272.48$786
Dec 199918029924.282.42$5,095
Nov 1999029523.192.43$718
Oct 1999021920.982.80$614
Sep 1999017021.752.62$445
Aug 1999038919.262.88$1,119
Jul 1999037617.892.37$892
Jun 1999029015.942.36$685
May 199907215.792.32$167
Apr 19991446715.102.21$2,322
Mar 1999012012.471.84$221
Feb 199902239.981.82$405
Jan 1999018410.381.90$350
Dec 199802839.201.77$502
Nov 1998033310.892.19$728
Oct 1998037312.421.97$735
Sep 1998034512.592.08$719
Aug 1998039311.301.91$750
Jul 1998039811.742.24$890
Jun 1998030911.242.24$691
May 1998038212.622.21$843
Apr 1998036713.042.51$919
Mar 1998031012.802.31$716
Feb 1998022913.952.30$527
Jan 1998014214.702.15$306
Dec 1997031016.322.41$747
Nov 1997022118.193.09$683
Oct 1997023519.253.15$740
Sep 199717524217.742.95$3,820
Aug 1997011317.862.55$289
Jul 1997022017.582.25$494
Jun 1997040617.242.26$916
May 1997032518.972.31$750
Apr 1997037817.882.08$787
Mar 1997042718.951.94$828
Feb 1997038120.492.21$840
Jan 1997038323.483.54$1,356
Dec 1996040523.32$0
Nov 1996040521.97$0
Oct 1996041323.31$0
Sep 1996029222.22$0
Aug 1996032720.26$0
Jul 1996037519.55$0
Jun 1996041618.73$0
May 1996041219.43$0
Apr 1996039421.51$0
Mar 1996036219.38$0
Feb 1996037516.98$0
Jan 1996040417.07$0
Dec 1995038317.19$0
Nov 1995040716.00$0
Oct 199517645015.43$2,716
Sep 1995041216.18$0
Aug 1995045315.92$0
Jul 1995037915.24$0
Jun 1995030816.41$0
May 1995042617.56$0
Apr 1995039117.73$0
Mar 1995039316.44$0
Feb 1995038016.58$0
Jan 1995040915.92$0
Dec 1994037415.03$0
Nov 1994039315.90$0
Oct 1994039515.58$0
Sep 1994040215.29$0
Aug 1994041716.13$0
Jul 199417441317.56$3,055
Jun 1994041417.09$0
May 1994044615.88$0
Apr 1994043914.14$0
Mar 1994047112.46$0
Feb 1994033712.50$0
Jan 1994041212.66$0
Dec 1993041112.33$0
Nov 1993043614.49$0
Oct 1993044115.85$0
Sep 1993041715.03$0
Aug 1993049115.66$0
Jul 199316843015.46$2,597
Jun 1993044716.79$0
May 1993042017.68$0
Apr 1993041218.05$0
Mar 1993043718.14$0
Feb 1993038517.90$0
Jan 1993045016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2019 — as filed, then multipliedworked
Oil                   58 bbl  × $ 50.85 =     $2,949
Casinghead gas         0 Mcf  × $  2.79 =         $0

────────────────────────────────────────────────────
Month total                                   $2,949

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/20439 is the state's own key, not one this site invented.