HERRIOTT

Operated by TAYLOR, G. E. INC. (P-5 837684) in the CHICO, WEST (CONGLOMERATE 5700) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 22407District 09Field 17634462OilCasinghead gasSaveExport
Value, all time
$286 k
Jan 1993 – Feb 2005
Value, last 12 filed months
$7 k
at the published price for each month
Months reported
146
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 193 leases and 233 wells, and the rule below applies to all of them.

Discovered
1957-01-02
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: DGL 1000 MCF

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition6,831 bbl$135,550
Casinghead gasProduction75,074 Mcf$150,852
Total$286,402

32,749 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 33.3681, -97.8751. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

33.36813, -97.87512 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,970 ft
1 wells filed one
Completion to plug
23.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,970 ft.

Completions filed
May 1982
1 of 1 wells
Plug dates filed
Sep 2005
1 of 1 wells

Last completion to plug: a median of 23.3 years across the 1 well that filed both dates, with the middle half between 23.3 years and 23.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4973239915,970 ftMay 1982Sep 2005Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (146)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

146 months

Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 200403739.866.75$250
Nov 200404245.286.33$266
Oct 20040549.706.52$33
Sep 20040743.245.28$37
Aug 20040042.375.55$0
Jul 200492038.286.08$3,522
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 200413134.475.86$216
Mar 2004043034.365.53$2,378
Feb 2004052732.455.51$2,904
Jan 200417761732.036.30$9,556
Dec 20032177530.266.30$5,519
Nov 2003047628.804.60$2,187
Oct 2003049928.174.76$2,375
Sep 2003012526.314.75$594
Aug 2003911729.765.13$868
Jul 200317351629.415.17$7,756
Jun 2003051728.565.98$3,093
May 2003051326.595.97$3,064
Apr 2003052426.675.41$2,833
Mar 200317752131.146.10$8,688
Feb 2003036133.487.93$2,861
Jan 2003045230.315.58$2,523
Dec 2002044426.914.85$2,155
Nov 2002049224.664.14$2,035
Oct 200216847626.464.23$6,458
Sep 2002048427.443.64$1,759
Aug 2002050525.963.16$1,598
Jul 2002050024.583.06$1,531
Jun 200217648723.733.34$5,802
May 2002057124.663.58$2,046
Apr 2002040523.653.51$1,422
Mar 2002051322.003.10$1,592
Feb 2002040518.222.38$962
Jan 200217746517.172.38$4,144
Dec 2001049716.932.36$1,175
Nov 2001046018.072.41$1,107
Oct 2001049019.782.53$1,239
Sep 200117850324.262.25$5,451
Aug 2001048624.873.05$1,484
Jul 2001043523.933.20$1,391
Jun 2001047324.563.82$1,809
May 20010025.524.31$0
Apr 200116447624.685.34$6,587
Mar 2001049724.545.38$2,672
Feb 2001045527.755.77$2,624
Jan 2001051027.478.40$4,283
Dec 200017149826.889.12$9,139
Nov 2000049732.215.66$2,812
Oct 2000051631.235.15$2,655
Sep 2000046831.875.19$2,427
Aug 2000039029.644.54$1,771
Jul 200012638328.534.09$5,161
Jun 2000048029.304.40$2,111
May 2000052327.263.68$1,925
Apr 200012848924.513.12$4,661
Mar 2000050428.422.86$1,441
Feb 2000048727.622.73$1,328
Jan 200016948125.272.48$5,464
Dec 1999049624.282.42$1,202
Nov 1999050423.192.43$1,227
Oct 1999054120.982.80$1,517
Sep 199917459221.752.62$5,335
Aug 1999054319.262.88$1,561
Jul 1999062017.892.37$1,471
Jun 1999039115.942.36$924
May 199917545615.792.32$3,822
Apr 1999049515.102.21$1,093
Mar 1999050612.471.84$930
Feb 199904989.981.82$905
Jan 199917656510.381.90$2,900
Dec 199804449.201.77$787
Nov 1998041410.892.19$905
Oct 1998053012.421.97$1,044
Sep 199816851412.592.08$3,186
Aug 1998055411.301.91$1,057
Jul 1998055611.742.24$1,244
Jun 1998054411.242.24$1,217
May 199812654412.622.21$2,790
Apr 1998053813.042.51$1,348
Mar 199812955512.802.31$2,933
Feb 1998048513.952.30$1,115
Jan 199811947814.702.15$2,779
Dec 1997038016.322.41$916
Nov 1997046818.193.09$1,445
Oct 199713443219.253.15$3,940
Sep 1997043517.742.95$1,285
Aug 1997040517.862.55$1,035
Jul 199713845017.582.25$3,437
Jun 1997045017.242.26$1,016
May 199712845018.972.31$3,467
Apr 1997053217.882.08$1,108
Mar 199713374918.951.94$3,973
Feb 1997066120.492.21$1,458
Jan 199712371323.483.54$5,412
Dec 1996084123.32$0
Nov 199613466721.97$2,944
Oct 1996043623.31$0
Sep 199612842222.22$2,844
Aug 1996057420.26$0
Jul 199613376719.55$2,600
Jun 1996089218.73$0
May 199612296819.43$2,370
Apr 1996074721.51$0
Mar 199613477519.38$2,597
Feb 1996068016.98$0
Jan 199613471617.07$2,287
Dec 1995076017.19$0
Nov 199513770216.00$2,192
Oct 1995074415.43$0
Sep 199512978416.18$2,087
Aug 1995082215.92$0
Jul 199513480915.24$2,042
Jun 1995078316.41$0
May 199513489617.56$2,353
Apr 199513241217.73$2,340
Mar 1995049816.44$0
Feb 1995014216.58$0
Jan 1995053915.92$0
Dec 199413454415.03$2,014
Nov 1994054015.90$0
Oct 199412655915.58$1,963
Sep 1994038315.29$0
Aug 199413268816.13$2,129
Jul 1994073217.56$0
Jun 199411869317.09$2,017
May 1994068315.88$0
Apr 199413276914.14$1,866
Mar 1994052012.46$0
Feb 199413468912.50$1,675
Jan 199411893912.66$1,494
Dec 1993045212.33$0
Nov 1993075414.49$0
Oct 199313276315.85$2,092
Sep 1993070015.03$0
Aug 199313268415.66$2,067
Jul 1993075415.46$0
Jun 199312574816.79$2,099
May 1993074217.68$0
Apr 199313283318.05$2,383
Mar 1993076918.14$0
Feb 199313568517.90$2,417
Jan 1993075016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2004 — as filed, then multipliedworked
Oil                    0 bbl  × $ 39.86 =         $0
Casinghead gas        37 Mcf  × $  6.75 =       $250

────────────────────────────────────────────────────
Month total                                     $250

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 09/O/22407 is the state's own key, not one this site invented.